| Owner | Filings | Most Recent |
|---|---|---|
| NYC Economic Development | 79 | 07/08/2026 |
| Boulevard Together Developer | 29 | 07/10/2026 |
| Nycedc | 8 | 03/21/2026 |
| Peninsula Building 2A | 4 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP Engineering | 6 | 05/21/2026 |
| Paul Perdek | 6 | 05/11/2026 |
| Amm Engineering | 2 | 11/12/2025 |
| Christies | 2 | 10/17/2025 |
| Philip Habib & Associates | 3 | 08/25/2025 |
| George J. Xerakias, PE | 2 | 07/10/2025 |
| Gga Studios | 5 | 05/13/2025 |
| James Stout Architect & Associates | 1 | 04/29/2025 |
| Lilker Associates Consulting Engineering | 3 | 12/10/2024 |
| KN3 Engineering | 2 | 08/12/2024 |
| DI Domenico + Partners | 1 | 06/25/2024 |
| Howard Shapiro & Associates | 3 | 05/07/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| Design 2147 | 30 | 03/21/2026 |
| AE Design Solution | 14 | 03/21/2026 |
| Domani Consulting | 5 | 03/21/2026 |
| Sunkeeper Solar Electric | 2 | 03/21/2026 |
| HS Design Studio | 4 | 03/21/2026 |
| Howard I Shapiro Associates | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Core Scaffold Systems | Scaffold | 9 | 07/08/2026 |
| Broadway Builders | General Contractor | 8 | 04/09/2026 |
| Broadway Builders | Scaffold | 6 | 07/08/2026 |
| Flint Mechanical | Fire Protection | 5 | 07/08/2026 |
| SC Prime Energy | General Contractor | 4 | 07/08/2026 |
| Panili Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| R.C. Structures | Scaffold | 3 | 07/08/2026 |
| Aura Plumbing | Fire Protection | 3 | 07/08/2026 |
| Flint Mechanical | Plumbing | 3 | 07/08/2026 |
| Ips Plumbing | Plumbing | 3 | 07/08/2026 |
| Bletsas Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Cosan Construction | Scaffold | 2 | 07/08/2026 |
| Bletsas Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| Sunkeeper Solar Electric | specialty_contractor | 1 | 04/09/2026 |
| Eastern Electrical Construction | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Domani Inspection Service | 843 | 15 | 05/21/2026 |
| Amm Engineering | 725 | 2 | 11/12/2025 |
| George J. Xerakias, PE | 1658 | 2 | 07/10/2025 |
| James J Stout Architects | 5913 | 1 | 04/29/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Signed-off | Poltech Wall Surfacing | 07/09/2026 |
| DOB NOW | Plumbing | Signed-off | Ips Plumbing | 06/26/2026 |
| DOB NOW | Sprinklers | Signed-off | Flint Mechanical | 05/28/2026 |
| DOB NOW | Standpipe | Signed-off | Flint Mechanical | 05/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | Broadway Builders | 05/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 05/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SC Prime Energy | 04/03/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Poltech Wall Surfacing | 02/19/2026 |
| DOB NOW | General Construction | Signed-off | Broadway Builders | 01/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bletsas P&H | 12/23/2025 |
| DOB NOW | Plumbing | Signed-off | Flint Mechanical | 12/23/2025 |
| DOB NOW | Standpipe | Permit Issued | Bletsas P&H | 12/23/2025 |
| DOB NOW | Plumbing | Permit Issued | Flint Mechanical | 12/23/2025 |
| DOB NOW | Plumbing | Permit Issued | Flint Mechanical | 12/22/2025 |
| DOB NOW | Standpipe | Permit Issued | Bletsas P&H | 12/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SC Prime Energy | 12/11/2025 |
| DOB NOW | Earth Work | Permit Issued | Broadway Builders | 11/03/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Cosan Construction | 10/21/2025 |
| DOB NOW | Plumbing | Permit Issued | Panili Plumbing & Heating | 09/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Core Scaffold Systems | 06/27/2025 |
| DOB NOW | Plumbing | Signed-off | Ips Plumbing | 06/23/2025 |
| DOB NOW | Structural | Signed-off | Broadway Builders | 06/12/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 05/19/2025 |
| DOB NOW | Plumbing | Permit Issued | Ips Plumbing | 05/16/2025 |
| DOB NOW | Solar | Permit Issued | Sunkeeper Solar Electric | 05/01/2025 |
| DOB NOW | Construction Fence | Permit Issued | Broadway Builders | 04/24/2025 |
| DOB NOW | Plumbing | Signed-off | Panili Plumbing & Heating | 02/11/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SC Prime Energy | 01/30/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Poltech Wall Surfacing | 01/23/2025 |
| DOB NOW | General Construction | Signed-off | Broadway Builders | 01/22/2025 |
| DOB NOW | Plumbing | Permit Issued | Panili Plumbing & Heating | 01/02/2025 |
| DOB NOW | Standpipe | Permit Issued | Aura Plumbing | 12/31/2024 |
| DOB NOW | Standpipe | Permit Issued | Aura Plumbing | 12/31/2024 |
| DOB NOW | Sprinklers | Permit Issued | Aura Plumbing | 12/31/2024 |
| DOB NOW | Plumbing | Permit Issued | Panili Plumbing & Heating | 12/30/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | SC Prime Energy | 11/25/2024 |
| DOB NOW | Plumbing | Permit Issued | Bletsas Plumbing & Heating | 10/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Cosan Construction | 10/04/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Core Scaffold Systems | 07/03/2024 |
| DOB NOW | Standpipe | Permit Issued | Bletsas Plumbing & Heating | 07/02/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/21/2026 | Permit Issued | SC Prime Energy | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric TUHYP1443AN40AN 12 tons · Condensing Unit ×5 TUHYP2403BN40AN 20 tons · Vrf Outdoor ×5 TUHYP1683AN40AN 14 tons · Vrf Outdoor ×4 TUHYP1923BN40AN 16 tons · Condensing Unit ×3 TUHYP2163BN40AN 18 tons · Vrf Outdoor ×3 TUHYP1203AN40AN 10 tons · Vrf Outdoor ×1 Trane TUHYP1683AN40AN 14 tons · Vrf Outdoor ×7 TUHYP1443AN40AN 12 tons · Vrf Outdoor ×5 TUHYP1923BN40AN 16 tons · Vrf Outdoor ×5 TUHYP2403BN40AN 20 tons · Vrf Outdoor ×5 TUHYP2163BN40AN 18 tons · Vrf Outdoor ×3 TUHYP0483AN40AN 4 tons · Vrf Outdoor ×2 TUHYP07203AN40AN 6 tons · Vrf Outdoor ×2 TUHYP1203AN40AN 10 tons · Vrf Outdoor ×2 TURYE1923AN41AN 32 tons · Vrf Outdoor ×2 PUZ-A30NHA8 30,000 BTU · Split System ×1 TUHYP0963BN40AN 8 tons · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/10/2024 | Signed-off | Bletsas P&H | — |
| 02/23/2024 | Permit Issued | Bletsas P&H | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2025 | Signed-off | Ips Plumbing | Storm, Water/Sanitary |
| 11/18/2024 | Signed-off | Bletsas P&H | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/18/2025 | Permit Issued | Eastern Electrical Construction | — |
| 11/03/2025 | Permit Issued | Reliant Electrical Cont'g | General Wiring, Lighting |
| 04/22/2025 | Complete | Sunkeeper Solar | — |
| 10/23/2024 | Permit Issued | Itz Electric | — |
| 05/23/2024 | Complete | Solas Electrical | — |
| 10/20/2023 | Complete | Solas Electrical | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/17/2025 | Signed-off | Broadway Builders | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/29/2025 | Permit Issued | Sunkeeper Solar Electric | 339 panels, 145.8 kw, 7,099 roof_area_sqft |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2026 | Permit Issued | Core Scaffold Systems | Sidewalk Shed |
| 05/13/2025 | Permit Issued | Broadway Builders | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Signed-off | Cosan Construction | Suspended Scaffold (SC) |
| 07/10/2025 | Signed-off | Poltech Wall Surfacing | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/08/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/05/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/03/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/19/2026 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 05/19/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/18/2026 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 05/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/15/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/15/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/04/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 07/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/17/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 03/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/20/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/13/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 09/10/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 05/22/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 04/12/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/08/2026 | Emergency and Standby Power Systems (Generator) | JOHN MCMONAGLE | special |
| 04/29/2026 | Heating Systems | JOHN MCMONAGLE | special |
| 04/29/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 04/29/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | Shutoff dampers | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | Electrical motors and elevators | JOHN MCMONAGLE | energy_progress |
| 04/29/2026 | Final | JOHN MCMONAGLE | progress |
| 04/29/2026 | Smoke Control Systems Testing | JOHN MCMONAGLE | special |
| 04/29/2026 | Mechanical Systems | JOHN MCMONAGLE | special |
| 04/29/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 12/23/2025 | Structural Cold-Formed Steel | JOHN MCMONAGLE | special |
| 12/23/2025 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 12/23/2025 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 12/23/2025 | Concrete - Cast-In-Place | JOHN MCMONAGLE | special |
| 12/23/2025 | Final | JOHN MCMONAGLE | progress |
| 12/23/2025 | Preliminary | JOHN MCMONAGLE | progress |
| 12/23/2025 | Structural Steel - High Strength Bolting | JOHN MCMONAGLE | special |
| 12/23/2025 | Masonry | JOHN MCMONAGLE | special |
| 12/23/2025 | Structural Steel - Details | JOHN MCMONAGLE | special |
| 12/23/2025 | Structural Steel - Welding | JOHN MCMONAGLE | special |
| 10/06/2025 | Masonry | JOHN MCMONAGLE | special |
| 09/29/2025 | Final | JOHN MCMONAGLE | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hunts Points Recreation Center | Fitness / Recreation | — | Project X01207231 |