| Owner | Filings | Most Recent |
|---|---|---|
| RCPI LANDMARKS PROPERTIES, LLC | 820 | 09/16/2026 |
| TISHAMAN SPEYER | 70 | 09/13/2026 |
| TISHMAN SPEYER PROPERTIES | 34 | 07/08/2026 |
| SIGNEXPO | 9 | 07/08/2026 |
| RCPI HOLDCO LCC ATTN: TRA | 3 | 03/22/2026 |
| RCPI HOLDCO LLC ATTN:TRAC | 1 | 03/22/2026 |
| ROCKEFELLER GROUP | 1 | 03/22/2026 |
| TURNER CONSTRUCTION COMPANY | 1 | 03/22/2026 |
| LANDMARK PROPERTIES | 1 | 03/22/2026 |
| FIRST REPUBLIC BANK | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GENSLER | 4 | 06/01/2026 |
| INCORPORATED ARCHITECTURE AND DESIG | 5 | 04/28/2026 |
| MM ARCHITECTURE DPC | 4 | 01/08/2026 |
| THORNTON TOMASETTI | 4 | 12/11/2025 |
| ROBERT DERECTOR ASSOCIATES | 11 | 12/10/2025 |
| KOHN ARCHITECTURE, PLLC | 1 | 10/07/2025 |
| WB ENGINEERS & CONSULTANTS PLLC | 15 | 09/18/2025 |
| SYSKA HENNESSY GROUP | 3 | 09/04/2025 |
| GRM CONSULTANTS LLC | 4 | 05/08/2025 |
| THE ROCK BROOK CONSULTING GROUP, PA | 6 | 04/16/2025 |
| NYC FACADE ARCHITECTURE, PLLC | 1 | 11/08/2024 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 10/09/2024 |
| TPG ARCHITECTURE, LLP | 1 | 08/08/2024 |
| CUSTODIO CONSULTING, LLC | 7 | 06/05/2024 |
| TED MOUDIS ASSOCIATES | 3 | 05/20/2024 |
| OLA CONSULTING ENGINEERS, PC | 6 | 04/16/2024 |
| STANTEC CONSULTING | 2 | 02/10/2024 |
| MONTROY ARCHITECTURE PLLC | 1 | 06/01/2023 |
| SDG ENGINEERING PC | 2 | 04/11/2023 |
| G3 ARCHITECTURE INTERIORS PLANNING | 4 | 07/21/2022 |
| MG ENGINEERING D.P.C. | 4 | 06/07/2022 |
| AMA CONSULTING ENGINEERS, PC | 5 | 03/22/2022 |
| BACON LANE ARCHITECT, LLC | 1 | 12/10/2021 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 2 | 11/19/2021 |
| COSENTINI ASSOCIATES | 6 | 05/21/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 19 | 03/21/2026 |
| GILLMAN CONSULTING | 52 | 03/21/2026 |
| WALTER T GORMAN PE | 23 | 03/21/2026 |
| PROJECT EXPEDITERS CONSULTING CO. | 12 | 03/21/2026 |
| DJH ARCHITECTURE P C | 2 | 03/21/2026 |
| LOUIS STRIAR | 8 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 10 | 03/21/2026 |
| DOMANI CONSULTING | 8 | 03/21/2026 |
| RPO | 6 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| COYLE CONTRACTING CORP | General Contractor | 19 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 14 | 07/29/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 12 | 09/16/2026 |
| AIK RENOVATION INC | General Contractor | 9 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 6 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 5 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 5 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 5 | 07/08/2026 |
| JULIAN SPRINKLER CORP | Fire Protection | 4 | 07/08/2026 |
| FM95 NY | Scaffold | 4 | 07/08/2026 |
| MITER CONSTRUCTION CORP | General Contractor | 4 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 4 | 03/21/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| SPIELER, RONALD | Electrical | 3 | 03/21/2026 |
| ASANKOMAH, KOFI | Electrical | 3 | 03/21/2026 |
| W.J. REGAN & COMPANY LLC | General Contractor | 3 | 03/21/2026 |
| A + SPRINKLER CORP | Fire Protection | 3 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 2 | 07/08/2026 |
| DENKO MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| OSMAN LTD | General Contractor | 2 | 07/08/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 2 | 07/08/2026 |
| GEOFFREY A. LAGAS & ASSOC | Plumbing | 2 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 16 | 06/01/2026 |
| CROSSCHECK INSPECTION SER | 544 | 8 | 01/08/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 5 | 09/18/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 14 | 09/04/2025 |
| HAWA ENGINEERING PC | 7982 | 3 | 06/05/2024 |
| WALTER T. GORMAN, P.E., P | 268 | 13 | 05/20/2024 |
| FUTURE TECH CONSULTANTS O | 589 | 4 | 06/07/2022 |
| 20/20 INSPECTIONS INC | 1471 | 9 | 11/22/2021 |
| WB ENGINEERING | 533 | 12 | 07/21/2021 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 2 | 07/12/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 06/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 06/01/2026 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 12/19/2025 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 12/17/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/17/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 12/17/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 12/16/2025 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 07/08/2025 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 07/01/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 07/01/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 07/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 06/30/2025 |
| DOB NOW | Plumbing | Permit Issued | TRISTATE PLBG SVCS CORP | 06/30/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 06/27/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 06/27/2025 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 06/27/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/27/2025 |
| DOB NOW | Sign | Signed-off | RED HOOK SIGN AND ELECT | 05/27/2025 |
| DOB NOW | Sign | Signed-off | RED HOOK SIGN AND ELECT | 05/27/2025 |
| DOB NOW | Sign | Signed-off | RED HOOK SIGN AND ELECT | 05/20/2025 |
| DOB NOW | Sign | Signed-off | RED HOOK SIGN AND ELECT | 05/19/2025 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 04/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 04/14/2025 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 01/29/2025 |
| DOB NOW | Plumbing | Signed-off | A PLUS PLUMBING CORP | 01/27/2025 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 01/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 01/23/2025 |
| DOB NOW | General Construction | Signed-off | OSMAN LTD | 01/06/2025 |
| DOB NOW | Structural | Signed-off | TURNER CONSTRUCTION COMPANY | 10/24/2024 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 10/10/2024 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 10/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | TURNER CONSTRUCTION COMPANY | 10/03/2024 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/26/2024 |
| DOB NOW | Sprinklers | Signed-off | ASHLAR MECHANICAL CORP | 08/20/2024 |
| DOB NOW | Plumbing | Signed-off | GEOFFREY A. LAGAS & ASSOC | 08/14/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/14/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/01/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Climatemaster CL024 800 CFM · Wshp ×2 CL042 1,380 CFM · Wshp ×2 SR-048 1,600 CFM · Wshp ×1 SR-060 2,000 CFM · Wshp ×1 Liebert PD018 2,800 CFM ×3 |
| 04/15/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | — |
| 10/23/2025 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | SIRINA FIRE PROT CORP | Sprinkler System |
| 10/23/2025 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 09/04/2025 | Signed-off | SIRINA FIRE PROT CORP | Sprinkler System |
| 09/17/2019 | Permit Issued | ALLSTATE SPRINKLER LLC | 33 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 04/15/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 10/23/2025 | Permit Issued | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 09/04/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2025 | Complete | ERNE VALLEY ELECTRICAL IN | General Wiring |
| 10/01/2024 | Complete | UNITY ELECTRIC CO. INC | — |
| 10/01/2024 | Complete | UNITY ELECTRIC CO. INC | General Wiring |
| 08/12/2024 | Complete | STRIANO ELECTRIC CO., INC | General Wiring |
| 11/30/2023 | Complete | NION ELECTRIC CORP | General Wiring |
| 06/26/2023 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 06/27/2022 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/16/2022 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 10/14/2021 | Complete | JRD ELECTRIC CORP. | General Wiring |
| 07/07/2021 | Permit Issued | CEDAR ELEC'L CONT'RS INC. | — |
| 11/16/2020 | Complete | HORSEPOWER ELECTRIC.& | — |
| 08/06/2020 | Complete | STRIANO ELECTRIC CO., INC | General Wiring |
| 07/08/2020 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 12/06/2019 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 12/03/2019 | Complete | D&D ELECTL CONST CO INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | TRISTATE PLBG SVCS CORP | Steel, Concrete |
| 10/23/2025 | Permit Issued | STRUCTURE TONE, LLC | Steel |
| 09/04/2025 | Signed-off | TURNER CONSTRUCTION COMPA | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/02/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/29/2026 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 05/15/2026 | Fail-Final SD - Fire Pump | Fail | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/27/2026 | Pass-Final SD - More than 10 Requested Floors | Pass | View ↗ |
| 04/23/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/21/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/09/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/24/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/12/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/13/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/31/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/31/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/05/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/02/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Final | Stephanie Lan | progress |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 05/15/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 05/15/2026 | Sprayed fire-resistant materials | EUGENE BIFULCO | special |
| 05/15/2026 | Fire-Resistance Rated Construction | EUGENE BIFULCO | progress |
| 04/17/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 04/17/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 04/17/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 03/25/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 03/25/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 03/25/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 03/25/2026 | Public Assembly Emergency Lighting | ALEXIS SCHLESSINGERMAN | progress |
| 11/05/2025 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 11/05/2025 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Concrete - Cast-In-Place | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 11/05/2025 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 09/29/2025 | Sprayed fire-resistant materials | EUGENE BIFULCO | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Christie's | Office | Sub-cellar, Cellar, Floors 1, 5, 6 | Project M01378380 Project M01314392 Project M01218433 Project M01218812 Project M00993887 Project M00261402 |
| Eataly Caffè | Restaurant / Food Service | Floor 1 | Project M01218676 Project M01218677 Project M01218678 Project M01218679 Project M01144746 |
| Eataly | Restaurant / Food Service | Floor 1 | Project M01144810 |
| JPMC Rockefeller | Office | Cellar, Floor 1 | Project M01050915 |
| Breads Bakery | Restaurant / Food Service | Ground, Mezzanine | Project M00607040 Project M00618051 Project M00549045 |