ECB08/07/2026ECB VIOLATION ISSUED FOR FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING. FOR SUMMONS # 39159059M - 39159061L AND 39159060J ISSUED ON 9/3/25, FILE$1K due
DOB06/03/2026ATOI OBSERVED AT EXPOSURE #1 THERE IS NO PLANTING AREA ONLY NEWLY INSTALLED CONCRETE
DOB04/13/2026ATOI OBSERVED FENCE HAS BEEN REMOVED. ALSO OBSERVED AT EXPOSURE 3 REAR EXTERIOR WALL HAS BEEN 90 PERCENT COMPLETED, AGAINST THE SWO UNDER COM#3A25151
ECB03/11/2026AT TIME OF MY INSPECTION OF A 3-STORY NEW BUILDING ACTIVE JOBSITE, I OBSERVED WORKERS ON SITE DRILLING INTO SET CONCRETE ON FIRST FLOOR EXPOSURE #1, UPON REVIEW OF DEPARTMENT RECORD, IT SHOWS THIS SITE WAS UNDE$10K due
ECB02/24/2026AT TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 2-STORY NEW BUILDING, I OBSERVED WORKERS DOING CONCRETE CHISELING AT EXPOSURE #1, UPON REQUEST TO GO INSIDE THE BUILDING TO PERFORM INSPECTION, ACCESS TO JOBS$2K due
ECB02/24/2026AT TIME OF MY INSPECTION ON AN ACTIVE JOBSITE OF A 2-STORY NEW BUILDING, I OBSERVED WORKERS DOING CONCRETE CHISELING AT EXPOSURE #1, UPON REVIEW OF DEPARTMENT RECORD, IT REVEALS THAT THIS JOBSITE WAS UNDER STOP$10K due
ECB02/22/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION PREMISES UNDER FULL SWO ISSUED ON 01/26/2026, OBSERVED MULTIPL WORKERS ON SITE ENGAGING IN CONSTRUCTION WORK AT EXPOSURE#1 A$10K due
DOB02/20/2026AT TIME OF INSPECTION, OBSERVED LABORERS AT EXPOSURE 1 ON MULTIPLE FLOORS OF THE SCAFFOLD PERFORMING STUCCO WORK. FULL STOP WORK ORDER STILL IN EFFECT AND POSTED. VIOLATION ISSUED DUE TO UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.
DOB02/19/2026NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED ONGOING ACTIVE STUCCO WORK BEING DONE AT EXPO # 1 AND 2. NEWLY BUILT PUMP SCAFFOLDING WAS ALSO ERECTED AT EXPO 2 AND I CAN HEAR ACTIVE WORK IN THE INTERIOR
ECB02/02/2026AT TIME OF INSPECTION, EXCESSIVE GARBAGE/MATERIALS/ AND DEBRIS IN EXTERIOR YARD OF EXPOSURE 1 OF THE PROPERTY. ECB ISSUED AS CONDITIONS POSES A SEVERE HEALTH HAZARD TO THE NEIGHBORHOOD AND PUBLIC AS IT COULD WE$2K due
ECB01/29/2026NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED AT EXOP # 2 WORKERS WORKING ON THE INTERIOR OF THE RESIDENT CREATING AN ILLEGAL DOOR OR WINDOW CUT OPENING$10K due
ECB01/14/2026NOTED: VIOLATION ISSUED FOR UNLAWFUL CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER: ATOI OBSERVED WORKERS WORKING ON THE EXTEROIR OF THE BUILDING AT EXPO # 2 PSWO ISSUED 9/3/25. ECB # ENDING IN 59M, COMPL$10K due
ECB09/03/2025WORK WITHOUT PERMIT: PSWO WAS ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE THREE STORY HORIZONTAL AND VERTICAL STRUCTURE. ATOI OBSERVED AT EXPOSURES # 3 NEW EXISTING PLUMBING WORK BEING DONE ON THE 3 STORY HONothing owed — awaiting certificate of correction
ECB09/03/2025WORK WITHOUT PERMIT: PSWO WAS ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY STRUCTURAL ECT WORK BEING DONE ON THE THREE STORY HORIZONTAL AND VERTICAL STRUCTURE. ATOI OBSERVED AT EXPOSURES # 3 A NEWLY BUILT 3 STNothing owed — awaiting certificate of correction
ECB09/03/2025NOTED: VIOLATION ISSUED FOR OCCUPANCY CONTRARY TO BUILDING RECORDS. ATOI OBSERVED AT EXPO # 3 AN UNDOCUMENTED UNPERMITTED 3 STORY HORIZONTAL AND VERTICAL STRUCTURE ATTACHED TO THE EXISTING BUILDING.BIZ RECORDSNothing owed — awaiting certificate of correction
One family attached or semi-detached · 2,000 sf lot · 0.7 FAR built · Flood zone X