← Back
Primarily 2 family with 1 store or office
124 BAY RIDGE AVENUE
BROOKLYN · BIN 3145542
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
R3-2Zoning
3,850 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 2,592 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 210p · 3 filings · 20 docs
Floor 1Under Construction13p · 4 filings · 20 docs
CellarUnder Construction16p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H Z BUILDING CONSULTING904/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2022$1.3M—— → —$345/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC312/19/2025
GMH ARCHITECTURE PLLC1206/20/2024
WW ENGINEERING PLLC405/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GMH ARCHITECTURE1403/21/2026
COBOT PLUMBING AND HEATING INC403/21/2026
SD DESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KING KONG G/C INCGeneral Contractor1107/08/2026
COBOT PLUMBING AND HEATING INCPlumbing507/08/2026
MPS PLUMBING & HEATING INCFire Protection107/08/2026
ACER CONSTRUCTION INCGeneral Contractor104/09/2026
RIKCO HVAC CORPGeneral Contractor107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376212/19/2025
GM HUANG ARCHITECTURE PLL1398406/20/2024
WW ENGINEERING PLLC7502405/13/2024
Building Lifecycle
All (146)Filed (19)Permit Issued (15)Signed Off (9)Violation (2)Inspection (17)Objection (54)Special Inspection (30)
08/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2026
Signed off — Alteration CO
new bathroom, service sink, and water fountain on the first floor.
B01297005-S1
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Permit issued — Plumbing
B01297005-S1-PL
01/02/2026
Permit issued — General Construction
B01297005-I1-GC
12/19/2025
Filed — Alteration CO
new bathroom, service sink, and water fountain on the first floor.
B01297005-S1
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
12/04/2025
Objection resolved — Addressed
11/12/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/10/2025
Objection raised — Fire_Protection
10/10/2025
Objection raised — Scope
10/10/2025
Objection raised — Scope
10/10/2025
Objection raised — Inspections
10/10/2025
Objection raised — Admin
10/10/2025
Objection raised — Structural
10/10/2025
Objection raised — Cost
10/10/2025
Objection raised — Scope
10/10/2025
Objection raised — Energy
10/10/2025
Objection raised — Zoning
10/10/2025
Objection raised — Zoning
10/10/2025
Objection raised — Fire_Protection
10/10/2025
Objection raised — Fire_Protection
10/10/2025
Objection raised — Scope
10/10/2025
Objection raised — Structural
10/10/2025
Objection raised — Accessibility
10/10/2025
Objection raised — Fire_Protection
10/02/2025
Filed — Alteration CO
new bathroom, service sink, and water fountain on the first floor.
B01297005-I1
10/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
10/02/2025
Special inspection requirement — Interior lighting power
Jian Yang
10/02/2025
Special inspection requirement — Lighting controls
Jian Yang
10/02/2025
Special inspection requirement — Exterior lighting power
Jian Yang
10/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
09/18/2025
Objection raised — Zoning
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/06/2026
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC01/02/2026
DOB NOWMechanical SystemsSigned-offRIKCO HVAC CORP05/22/2024
DOB NOWBoiler EquipmentSigned-offCOBOT PLUMBING AND HEATIN11/13/2023
DOB NOWGeneral ConstructionPermit IssuedKING KONG G/C INC06/22/2023
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN05/10/2023
DOB NOWBoiler EquipmentSigned-offCOBOT PLUMBING AND HEATIN05/09/2023
DOB NOWConstruction FenceSigned-offKING KONG G/C INC04/28/2023
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC02/02/2023
DOB NOWGeneral ConstructionPermit IssuedKING KONG G/C INC01/05/2023
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN10/27/2022
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC10/12/2022
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC06/23/2022
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN04/11/2022
DOB NOWGeneral ConstructionSigned-offKING KONG G/C INC04/07/2022
1 project · most recent 12/19/2025
Water/Sanitary
FiledStatusContractorScope
12/19/2025Signed-offDYNAMIC PLBG & SPRKLR CORWater/Sanitary
2 projects · most recent 04/08/2024
General Wiring
FiledStatusContractorScope
04/08/2024CompleteKWONG MING ELECTRIC INC4 meters, 4 new_meters
05/24/2022CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
08/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
12/19/2025Fire-Resistant Penetrations and JointsJian Yangspecial
12/19/2025Tenant Protection Plan ComplianceJian Yangspecial
10/02/2025Energy Code Compliance InspectionsJian Yangprogress
10/02/2025Fire-Resistant Penetrations and JointsJian Yangspecial
10/02/2025Interior lighting powerJian Yangenergy_progress
10/02/2025Lighting controlsJian Yangenergy_progress
10/02/2025Exterior lighting powerJian Yangenergy_progress
10/02/2025Fire-Resistance Rated ConstructionJian Yangprogress
07/07/2025Fire-Resistant Penetrations and Joints—special
07/07/2025Energy Code Compliance Inspections—progress
07/07/2025Exterior lighting power—energy_progress
07/07/2025Lighting controls—energy_progress
07/07/2025Interior lighting power—energy_progress
07/07/2025Fire-Resistance Rated Construction—progress
07/05/2024Fire-Resistant Penetrations and JointsGeorge Huangspecial
07/05/2024Energy Code Compliance InspectionsGeorge Huangprogress
07/05/2024Fire-Resistance Rated ConstructionGeorge Huangprogress
07/05/2024Exterior lighting powerGeorge Huangenergy_progress
07/05/2024Fenestration areasGeorge Huangenergy_progress
07/05/2024Interior lighting powerGeorge Huangenergy_progress
07/05/2024Fenestration air leakageGeorge Huangenergy_progress
07/05/2024Air barrier - visual inspectionGeorge Huangenergy_progress
07/05/2024Lighting controlsGeorge Huangenergy_progress
07/05/2024Fenestration and door U-factor and product ratingsGeorge Huangenergy_progress
05/14/2024Mechanical SystemsWing Wongspecial
Latest 25 of 56.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/31/2026B00697406-I1Request digital key ↗
08/30/2026B00700371-P2Request digital key ↗
08/30/2026B00700371-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01251917-I1Open ↗
08/13/2026B00763905-I1Open ↗
08/13/2026B01297005-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026B00697406-I1Open ↗
08/30/2026B00700371-I1Open ↗
08/30/2026B00700371-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B00763905-P1Open ↗
09/01/2026B00763905-P1Open ↗
09/01/2026B01297005-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00763905-P1Open ↗
09/01/2026B01297005-I1Open ↗
08/29/2026B01297005-S1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/15/2026B01297005-I1Open ↗
08/13/2026B00763905-P2Open ↗
08/13/2026B00763905-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/31/2026B00697406-I1Open ↗
08/30/2026B00700371-I1Open ↗
08/30/2026B00700371-P1Open ↗
Showing 3 of 18 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00763905-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/15/2026B01297005-I1Open ↗
08/13/2026B00763905-I1Open ↗
08/13/2026B01251917-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00763905-I1Open ↗