| Owner | Filings | Most Recent |
|---|---|---|
| NYC Economic Development | 366 | 10/13/2026 |
| Nycedc | 29 | 03/21/2026 |
| 14th at Irving | 14 | 07/29/2026 |
| NYC Department of Housing Preservation and Development | 4 | 03/21/2026 |
| Build002 | 2 | 03/22/2026 |
| Ral Development Services | 2 | 03/22/2026 |
| Bigman Brothers | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Robert Derector Associates | 23 | 07/28/2026 |
| Interior Management | 1 | 07/28/2026 |
| IMEG Consulting | 1 | 03/30/2026 |
| Design Republic | 2 | 03/25/2026 |
| Gensler | 11 | 10/02/2025 |
| Stark | 4 | 09/17/2025 |
| Eimer Design | 3 | 08/18/2025 |
| Ospino Engineering | 2 | 02/28/2025 |
| Howard Shapiro & Associates | 2 | 02/03/2025 |
| MG Engineering | 6 | 01/21/2025 |
| TPG Architecture | 2 | 01/21/2025 |
| CD&A | 11 | 04/23/2024 |
| Dxu | 4 | 01/29/2024 |
| Patti & Anthes Consulting Engineers | 30 | 01/19/2024 |
| Lilker Associates Consulting Engineering | 4 | 01/19/2024 |
| Lockwood, Kessler & Bartlett | 2 | 11/03/2023 |
| AMA Consulting Engineers | 6 | 07/11/2023 |
| Perkins and Will | 2 | 04/27/2023 |
| Ted Moudis Associates | 1 | 02/14/2023 |
| Case Engineering | 8 | 12/13/2022 |
| Patuxent Engineering | 8 | 05/19/2022 |
| John F. Giuseffi, Architect | 1 | 04/05/2022 |
| Kendall Engineering | 3 | 04/22/2021 |
| WSP | 3 | 04/14/2021 |
| Safway Atlantic | 2 | 03/26/2021 |
| Abco-Peerless Engineering | 1 | 07/23/2019 |
| Baileys Engineering | 2 | 05/16/2019 |
| Joel Phagoo P.E | 1 | 01/29/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Design 2147 | 204 | 03/21/2026 |
| Custodio Consulting | 8 | 03/21/2026 |
| Howard I Shapiro Associates | 4 | 03/21/2026 |
| King Contracting Group NY | 2 | 03/21/2026 |
| Premier Expediting Services | 3 | 03/21/2026 |
| A1 Expediting Service | 6 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Milrose Consultants | 5 | 03/21/2026 |
| Patuxent Engineering | 16 | 03/21/2026 |
| AO Consulting and Drafting | 2 | 03/21/2026 |
| Empire City Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Savcon Construction | General Contractor | 36 | 07/08/2026 |
| Cross Management | General Contractor | 22 | 07/08/2026 |
| Advanced Scaffold Services | Scaffold | 19 | 07/08/2026 |
| Structure Tone | General Contractor | 12 | 07/31/2026 |
| Suffolk Construction Company | General Contractor | 9 | 03/22/2026 |
| Enobrac Plumbing | Fire Protection | 7 | 07/08/2026 |
| JT Magen & Company | General Contractor | 7 | 07/08/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | Fire Protection | 6 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 6 | 07/08/2026 |
| Enobrac Plumbing | Plumbing | 5 | 07/08/2026 |
| C&A Seneca Construction | General Contractor | 4 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 4 | 07/08/2026 |
| Tri Borough Scaffolding | Scaffold | 4 | 07/08/2026 |
| Advanced Plumbing Mechanical | Plumbing | 4 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 3 | 08/01/2026 |
| Metro-Tech Erectors | Scaffold | 3 | 07/08/2026 |
| A&A Plumbing | Plumbing | 3 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 3 | 07/08/2026 |
| Breeze National | Scaffold | 3 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 2 | 08/04/2026 |
| Safway Atlantic | Scaffold | 2 | 07/08/2026 |
| C C Controlled Combustion | General Contractor | 2 | 03/21/2026 |
| Metropolis Electric | Electrical | 2 | 03/22/2026 |
| Standard Fire Protection | Fire Protection | 1 | 07/08/2026 |
| C.M. Richey Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Solar Electric Systems | Electrical | 1 | 03/22/2026 |
| Sam Schwartz Engineering | General Contractor | 1 | 03/22/2026 |
| A Plus Plumbing | Fire Protection | 1 | 08/14/2026 |
| Brook Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| Mill Brook Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Prostar Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Bigman Brothers | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Milrose Consultants | 2003 | 10 | 07/28/2026 |
| Ace Structural Engineering | 496 | 5 | 09/17/2025 |
| Crosscheck Inspection Services | 544 | 16 | 01/21/2025 |
| Fenagh | 6942 | 15 | 09/16/2024 |
| AK Engineering | 678 | 7 | 07/11/2023 |
| DNA Controlled Inspection | 554 | 3 | 05/18/2023 |
| Hirani Engineering & Land | 679 | 14 | 03/14/2023 |
| Engineering Building Service | 7303 | 3 | 02/21/2023 |
| Domani Inspection Service | 843 | 7 | 12/13/2022 |
| Kendall Engineering | 4154 | 3 | 04/22/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | A Plus Plumbing | 08/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Par Fire Protection | 08/03/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 07/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 07/30/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Metro-Tech Erectors | 07/28/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 04/06/2026 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 04/06/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Avenue Contracting | 08/13/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Metro-Tech Erectors | 08/08/2025 |
| DOB NOW | Sprinklers | Signed-off | Leguci Piping & Heating | 08/05/2025 |
| DOB NOW | Plumbing | Signed-off | Prostar Plumbing and Heating | 07/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | C&A Seneca Construction | 07/16/2025 |
| DOB NOW | General Construction | Signed-off | C&A Seneca Construction | 06/05/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Metro-Tech Erectors | 02/28/2025 |
| DOB NOW | Plumbing | Signed-off | Advanced Plumbing Mechanical | 02/24/2025 |
| DOB NOW | Sprinklers | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | 02/13/2025 |
| DOB NOW | Sprinklers | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | 02/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Metro-Tech Erectors | 02/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Savcon Construction | 01/21/2025 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 01/21/2025 |
| DOB NOW | Sprinklers | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | 10/17/2024 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 09/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Cross Management | 09/25/2024 |
| DOB NOW | General Construction | Signed-off | Cross Management | 09/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Savcon Construction | 02/05/2024 |
| DOB NOW | Sprinklers | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | 01/31/2024 |
| DOB NOW | Plumbing | Signed-off | Advanced Plumbing Mechanical | 01/31/2024 |
| DOB NOW | Sprinklers | Signed-off | Enobrac Plumbing | 01/29/2024 |
| DOB NOW | Sprinklers | Signed-off | Enobrac Plumbing | 01/29/2024 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 01/24/2024 |
| DOB NOW | Structural | Signed-off | Structure Tone | 12/11/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Cross Management | 08/16/2023 |
| DOB NOW | General Construction | Signed-off | Cross Management | 08/16/2023 |
| DOB NOW | Plumbing | Signed-off | Advanced Plumbing Mechanical | 08/16/2023 |
| DOB NOW | General Construction | Signed-off | Cross Management | 08/16/2023 |
| DOB NOW | General Construction | Signed-off | Cross Management | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | Cross Management | 08/15/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Cross Management | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | Savcon Construction | 08/08/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/18/2023 | Signed-off | Cross Management | Air Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Slant-Fin ×3 Lg ARUM456DTE5 3,600 CFM · Vrf Outdoor ×2 Task TGC043HE 1,800 CFM · Packaged Unit ×1 Heat / Cool Slant-Fin ×20 Lg ARNU543M3A4 5 tons · Vrf Indoor ×12 ARNU123SJA4 2 tons · Vrf Indoor ×2 ARNU243SKA4 2 tons · Vrf Indoor ×2 ARNU483M3A4 4 tons · Vrf Indoor ×3 ARNU073M1A4 5 tons · Vrf Indoor ×2 ARNU363M2A4 5 tons · Vrf Indoor ×2 ARNU 483M3A4 5 tons · Vrf Indoor ×1 ARNU123M1A4 1 tons · Vrf Indoor ×1 ARNU243M1A4 2 tons · Vrf Indoor ×1 ARNU543MEA4 5 tons · Vrf Indoor ×1 N/A N/A 5 tons · Fan Coil Indoor ×1 |
| 10/08/2020 | Signed-off | C C Controlled Combustion | Generators | Generators Caterpillar KD 1250-4 Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | Par Fire Protection | 7 heads |
| 01/21/2025 | Signed-off | Advanced Plumbing, Mechanical & Sprinkler | Sprinkler System |
| 03/17/2022 | Permit Issued | A Plus Plumbing | 232 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| 01/21/2025 | Signed-off | Advanced Plumbing Mechanical | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Permit Issued | Kleinknecht Electric Co | General Wiring |
| 04/17/2026 | Complete | Metropolis Electric | General Wiring |
| 04/07/2026 | Complete | Freedom Electric & Data | General Wiring |
| 07/01/2025 | Permit Issued | Team Electric | General Wiring |
| 10/08/2024 | Complete | Bigman Brothers | General Wiring, Lighting |
| 05/30/2024 | Complete | Bigman Brothers | General Wiring, Lighting |
| 05/30/2024 | Complete | Bigman Brothers | General Wiring, Lighting |
| 01/27/2024 | Complete | Metropolis Electric | General Wiring |
| 10/07/2023 | Complete | Metropolis Electric | General Wiring |
| 07/06/2023 | Complete | Freedom Electric & Data | General Wiring |
| 05/02/2023 | Complete | C.M. Richey Electrical Contracting | General Wiring |
| 03/21/2023 | Complete | Kleinknecht Electric Co | General Wiring |
| 03/15/2023 | Complete | Freedom Electric & Data | General Wiring |
| 02/09/2023 | Complete | Solar Electric Systems | 4 meters, 4 new_meters |
| 02/09/2023 | Complete | Solar Electric Systems | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/03/2023 | Signed-off | Structure Tone | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2021 | Signed-off | Safway Atlantic | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2025 | Permit Issued | Avenue Contracting | Suspended Scaffold (SC) |
| 02/28/2025 | Signed-off | Metro-Tech Erectors | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/19/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/09/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/09/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/16/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/13/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/13/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/01/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/29/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/22/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/21/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/21/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/14/2026 | Final | Benjamin Plotnick | progress |
| 07/14/2026 | Ventilation and air distribution system | Benjamin Plotnick | energy_progress |
| 07/14/2026 | Mechanical Systems | Benjamin Plotnick | special |
| 02/24/2026 | Mechanical Systems | Christopher Drutjons | special |
| 02/24/2026 | Final | Christopher Drutjons | progress |
| 11/07/2025 | Public Assembly Emergency Lighting | AILANTO DANIEL MINAWI | progress |
| 09/17/2025 | Maintenance information | ANTHONY UGBEBOR | energy_progress |
| 09/17/2025 | Mechanical Systems | ANTHONY UGBEBOR | special |
| 09/17/2025 | Final | ANTHONY UGBEBOR | progress |
| 09/05/2025 | Maintenance information | ANTHONY UGBEBOR | energy_progress |
| 09/05/2025 | Final | ANTHONY UGBEBOR | progress |
| 09/05/2025 | Mechanical Systems | ANTHONY UGBEBOR | special |
| 05/13/2025 | Post-installed Anchors | ANTHONY UGBEBOR | special |
| 05/13/2025 | Fire-Resistant Penetrations and Joints | ANTHONY UGBEBOR | special |
| 05/09/2025 | Public Assembly Emergency Lighting | ANTHONY UGBEBOR | progress |
| 05/06/2025 | Sprinkler Systems | ANTHONY UGBEBOR | special |
| 01/29/2025 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 01/29/2025 | Post-installed Anchors | EUGENE BIFULCO | special |
| 01/29/2025 | Sprinkler Systems | EUGENE BIFULCO | special |
| 01/22/2025 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 01/22/2025 | Final | EUGENE BIFULCO | progress |
| 01/21/2025 | Post-installed Anchors | EUGENE BIFULCO | special |
| 01/21/2025 | Mechanical Systems | EUGENE BIFULCO | special |
| 01/21/2025 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 01/21/2025 | Final | EUGENE BIFULCO | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Sequoia | Office | Floor 18 | Project M01430458 Project M01430476 Project M01430497 Project M08032122 Project M08032174 Project M08032250 |
| Dick's Sporting Goods | Retail | Floors 16, 17 | Project M01363739 Project M00922420 |
| Time Out Market | Restaurant / Food Service | Floor 1 | Project M01223389 Project M01218396 |
| Zero Irving | Office | Floors 8, 11–13, 19 | Project M00986018 Project M00819232 Project M00771809 Project M00588792 |
| Compass Rose Asset Management | Office | Floor 20 | Project M00904603 |
| DSG & Gamechanger | Office | Floors 16, 17 | Project M00879165 |
| Alchemy | Office | Floor 10 | Project M00865676 Project M00865684 Project M00865693 Project M00865696 |
| FedCap | Office | Floors 1–7 | Project M00779827 Project M00779871 Project M00779960 Project M00727630 Project M00727637 Project M00727649 Project M00727614 Project M01081156 Project M00779783 |
| Urbanspace | Restaurant / Food Service | Cellar, Floor 1 | Project M00792768 Project M00438121 Project M00438129 |
| Melio | Office | Floors 14–16 | Project M00689369 Project M00689376 Project M00689383 Project M00689000 |