← Back
BuildNYC
Concert hall
Webster Hall
125 EAST 11TH STREET · East Village · BIN 1008983
💬 Discuss this project
1920Year Built
3.5Stories
P1Building Class
C6-2AZoning
26,574 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 1 old, status unconfirmed ▸
Concert hall · Owner of record: Unity Gallega East 11th Street · 9,000 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 34p · 2 filings · 5 docs
Floor 2Under Construction8p · 4 filings · 10 docs
Floor 1Tenant protection renovation and demolition7p · 6 filings · 19 docs
CellarStair tower and elevator pit1p · 1 filing · 3 docs
BasementUnity Gallega of the US9p · 7 filings · 20 docs
Sub-BasementUnity Gallega of the US37p · 11 filings · 20 docs
Site & exteriorWebster HAH4p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Unity Gallega of the US3307/08/2026
Unity Gallega East 11th Street2103/22/2026
Bowery presents810/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andy Engler Roth208/31/2026
Nathan Rich, RA711/22/2022
Abs Engineering508/18/2022
Tocci Engineering107/18/2022
Gary Martinez204/15/2019
Direct Access Expediting308/23/2018
Safway Atlantic102/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates3003/21/2026
Direct Access Expediting603/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
King Hoist & ScaffoldingScaffold507/08/2026
FolorGeneral Contractor403/21/2026
Dal ElectricalElectrical203/22/2026
Safway AtlanticScaffold207/08/2026
V. Vass ElectricElectrical103/22/2026
PSI PartnersFire Protection107/08/2026
A&A PlumbingPlumbing107/08/2026
Winick ProductionsGeneral Contractor109/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Abs Engineering4835508/18/2022
Tocci Engineering3842107/18/2022
Building Lifecycle
All (166)Filed (21)Permit Issued (11)Signed Off (8)Violation (30)Inspection (5)Objection (74)Special Inspection (17)
09/02/2026
Permit issued — General Construction
M01453334-I1-GC
08/31/2026
Filed — No Work
M01453186-I1
08/31/2026
Filed — Alteration
M01453334-I1
08/31/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/05/2022
Signed off — Alteration
Removal and installation of plumbing fixtures.
M00324401-I1
12/01/2022
Signed off — Alteration
Modification of existing sprinkler system.
M00324421-I1
11/22/2022
Filed — No Work
M08043937-I1
11/21/2022
Signed off — Alteration
Modification to existing mechanical system.
M00324438-I1
10/28/2022
Filed — No Work
M08029697-I1
10/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/18/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/12/2022
Objection raised — Structural
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Inspections
10/12/2022
Objection resolved — Addressed
10/11/2022
Filed — No Work
M08018728-I1
09/30/2022
Filed — No Work
M08013792-I1
09/26/2022
Signed off — Alteration
M00755751-I1
09/23/2022
Filed — No Work
M08007629-I1
09/22/2022
Permit issued — Structural
M00755751-I1-ST
09/13/2022
Filed — No Work
M08002634-I1
09/13/2022
Objection raised — Fire_Protection
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Fire_Protection
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Scope
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Inspections
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection raised — Structural
09/13/2022
Objection resolved — Addressed
09/09/2022
Filed — No Work
M07995553-I1
08/30/2022
Special inspection requirement — Public Assembly Emergency Lighting
Nathan Rich
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
08/29/2022
Special inspection requirement — Sprinkler Systems
Alex Schwartz
08/23/2022
Objection raised — Admin
08/23/2022
Objection resolved — Addressed
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
08/18/2022
Filed — Alteration
Modification of existing sprinkler system.
M00324421-P1
08/18/2022
Filed — Alteration
Removal and installation of plumbing fixtures.
M00324401-P1
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
07/18/2022
Filed — Alteration
M00755751-I1
06/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Tocci
06/10/2022
Special inspection requirement — Structural Steel - Details
Nat Tocci
06/10/2022
Special inspection requirement — Structural Steel - Welding
Nat Tocci
06/10/2022
Special inspection requirement — Final
Nat Tocci
04/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2022
Permit issued — Sprinklers
M00324421-I1-EW-SP
02/18/2022
Permit issued — Plumbing
M00324401-I1-PL
02/16/2022
Permit issued — Mechanical Systems
M00324438-I1-MS
12/18/2020
Objection raised — Other
12/18/2020
Objection resolved — Addressed
12/17/2020
Filed — Alteration
Removal and installation of plumbing fixtures.
M00324401-I1
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWinick Productions09/02/2026
DOB NOWStructuralSigned-offFolor09/22/2022
DOB NOWSprinklersSigned-offMora Fire Protection04/28/2022
DOB NOWPlumbingSigned-offA&A Plumbing02/18/2022
DOB NOWMechanical SystemsSigned-offFolor02/16/2022
DOB NOWSupported ScaffoldSigned-offKing Hoist & Scaffolding01/11/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/26/2018
DOB NOWSupported ScaffoldSigned-offKing Hoist & Scaffolding08/23/2018
DOB NOWSidewalk ShedSigned-offKing Hoist & Scaffolding08/17/2018
DOB NOWConstruction FenceSigned-offKing Hoist & Scaffolding08/16/2018
DOB NOWSidewalk ShedSigned-offSafway Atlantic02/26/2018
BISOTISSUEDFolor06/16/2022
BISOTISSUEDFolor03/29/2022
BISOTISSUEDFolor01/12/2022
BIS—ISSUEDShawmut Woodworking & Supply10/25/2019
BISOTISSUEDShawmut Woodworking & Supply12/18/2018
BISOTISSUEDShawmut Woodworking & Supply12/18/2018
BIS—ISSUEDShawmut Woodworking & Supply10/19/2018
BISOTISSUEDShawmut Woodworking & Supply10/19/2018
BISOTISSUEDShawmut Woodworking & Supply10/19/2018
BISMHISSUEDShawmut Woodworking & Supply10/19/2018
BISPLISSUEDEnobrac Plumbing06/29/2018
BISMHISSUEDShawmut Woodworking & Supply06/28/2018
BISSPISSUEDEnobrac Plumbing06/20/2018
BISEQISSUEDKing Hoist & Scaffolding05/21/2018
BISEQISSUEDSafway Atlantic05/14/2018
BIS—ISSUEDShawmut Woodworking & Supply05/04/2018
BIS—ISSUEDShawmut Woodworking & Supply04/27/2018
BISEQISSUEDSafway Atlantic04/13/2018
BISOTISSUEDShawmut Woodworking & Supply03/06/2018
BISOTISSUEDShawmut Woodworking & Supply03/06/2018
BISOTISSUEDNaccarato Contracting03/01/2012
BISOTISSUEDWebster Hall Entertainmen08/18/2010
BISPLISSUEDJ. Caiazzo Plumbing & Heating10/30/2008
BISOTISSUEDUnity Gallega of the US02/23/2007
BISFSISSUEDAce-Atlas Plumbing & Heating01/10/2007
BISOTISSUEDDavid Turner Architect12/26/2006
BISOTISSUEDUrban Holdings06/23/2006
BISOTISSUEDCY Cnostr02/28/2005
BISOTISSUEDWebster Hall Entertainment07/21/2004
+ 11 more permits on file
8 projects · most recent 01/14/2022
General Wiring Lighting
FiledStatusContractorScope
01/14/2022CompleteAllstate Electrical ContGeneral Wiring
12/08/2021CompleteDenmar ElectricGeneral Wiring
02/07/2020CompleteJam Electrical—
08/16/2018CompleteV. Vass Electric—
08/06/2018CompleteV. Vass Electric—
06/12/2018CompleteDal ElectricalGeneral Wiring, Lighting
03/16/2018CompleteDal Electrical—
02/20/2018CompleteStar-Delta Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/31/2026FinalANDY ENGLER ROTHprogress
08/30/2022Public Assembly Emergency LightingNathan Richprogress
08/29/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/29/2022Sprinkler SystemsAlex Schwartzspecial
08/22/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/01/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
06/10/2022Structural Stability – Alterations of existing buildingsNat Toccispecial
06/10/2022Structural Steel - DetailsNat Toccispecial
06/10/2022Structural Steel - WeldingNat Toccispecial
06/10/2022FinalNat Tocciprogress
03/06/2020Fire-Resistant Penetrations and JointsAlex Schwartzspecial
03/06/2020Post-installed AnchorsAlex Schwartzspecial
02/28/2020Mechanical SystemsAlex Schwartzspecial
02/28/2020FinalAlex Schwartzprogress
01/24/2019Public Assembly Emergency LightingChristopher O'Malleyprogress
08/15/2018FinalANN HICKEYprogress
08/15/2018FinalANN HICKEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Unity Gallega of the USCommunity FacilitySub-basement
Project M00324401 Alteration · LOC Issued · 12/17/2020
Project M00324421 Alteration · LOC Issued · 12/17/2020
Project M00324438 Alteration · LOC Issued · 12/17/2020
Webster HAHOffice—
Project M00021763 Alteration · LOC Issued · 02/23/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 421 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
09/15/2026M01453186-I1Request digital key ↗
09/05/2026M00154334-I1Request digital key ↗
09/01/2026M08002634-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch6
10/13/2026M01453334-I1Request digital key ↗
09/06/2026M00021763-I1Request digital key ↗
09/06/2026M00071104-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00324401-P1Request digital key ↗
09/02/2026M00324401-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026M07995553-I1Request digital key ↗
08/15/2026M00123113-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00324421-I1Request digital key ↗
08/15/2026M00324421-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00324438-I1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION66
03/09/2023101768044Open ↗
02/27/2023123265901Open ↗
02/22/2023123265901Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION23
01/12/2022140953270Open ↗
10/25/2019123265901Open ↗
02/06/2019123575194Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M00324438-I1Open ↗
08/13/2026M00324401-P1Open ↗
08/13/2026M00324401-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF1
02/22/2023140953270Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/12/2019123265901Open ↗
▸BISPRIOR TO FINAL COFO AMEND SECT.18 ON THE PW1. CHECK YES IN THE PROPOSED COLUMN FOR ALL APPLICABLE REGARDLESS WHETHER OR NOT INSTALLED UNDER CURRENT APPLICATION.1
05/30/2023123265901Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/05/2019123265901Open ↗
▸Seals & Professional Certifications94
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
05/10/2019140764037Open ↗
04/24/2019123575194Open ↗
04/24/2019123575194Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
10/13/2026M01453334-I1Open ↗
09/15/2026M01453186-I1Open ↗
09/06/2026M00071104-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/08/2026M00324401-I1Open ↗
09/01/2026M00324401-P1Open ↗
08/28/2026M00324438-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00071097-I1Open ↗
08/31/2026M07995553-I1Open ↗
08/29/2026M00071104-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2020140953270Open ↗
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
02/13/2019123381633Open ↗
02/07/2019123381633Open ↗
02/06/2019123575194Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/12/2019123381633Open ↗
04/12/2019123381633Open ↗
04/12/2019123381633Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/06/2019123575318Open ↗
08/19/2019123575318Open ↗
▸BISEQUIPMENT USE PERMITS2
04/12/2019123381633Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
06/05/2019123158885Open ↗
04/19/2019123158885Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
12/19/2018123265901Open ↗
12/17/2018123265901Open ↗
Showing 2 of 4 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026M00324421-I1Open ↗
09/02/2026M00324401-P1Open ↗
09/02/2026M00324401-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/19/2020140953270Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/18/2018123549918Open ↗
12/18/2018123549918Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance2
▸BISNYCECC EXEMPTION1
11/19/2020140953270Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/19/2020140953270Open ↗
11/19/2020140953270Open ↗
Showing 2 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
10/11/2022140953270Open ↗
10/11/2022140953270Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/11/2022140953270Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/24/2019123575318Open ↗
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
03/20/2023101768044Open ↗
02/22/2023140953270Open ↗
02/18/2021123265901Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
01/29/2020120956180Open ↗
01/29/2020120441968Open ↗
06/24/2019123381633Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS APPROVAL12
11/19/2020140953270Open ↗
05/03/2019123265901Open ↗
04/12/2019123381633Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
10/07/2022123265901Open ↗
08/26/2022123265901Open ↗
03/01/2019123265901Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
02/22/2023140953270Open ↗
12/05/2019123265901Open ↗
▸BISFINAL1
10/11/2022140953270Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
11/19/2020140953270Open ↗
09/06/2019123575318Open ↗
05/06/2019123575194Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/22/2023123265901Open ↗
02/22/2023140953270Open ↗
▸Filing & Intake Forms70
▸BISBOROUGH INTAKE FORM40
12/09/2021140953270Open ↗
03/17/2020123265901Open ↗
01/29/2020120956180Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING COVER SHEET15
12/28/2018123158885Open ↗
Showing 1 of 15 on file for this type
▸BISADDITIONAL INFORMATION12
09/12/2022123265901Open ↗
08/29/2022140953270Open ↗
08/22/2022140953270Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/19/2020140953270Open ↗
Showing 1 of 3 on file for this type
▸Other Documents3
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
04/12/2019123381633Open ↗
▸BIS* FIRE STOPS 27-3451
03/17/2023101768044Open ↗