← Back
BuildNYC
City university
Nichols Hall
125 WEST 180TH STREET · BIN 2100249
💬 Discuss this project
1930Year Built
4Stories
W5Building Class
R5Zoning
—Gross Floor Area
1Units
0 Active Violations 4 old, status unconfirmed ▸FDNY Report ↗
City university · 0.47 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBronx Community College1 filing · 3 docs
Floor 4Bronx Community College1 filing · 3 docs
Floor 3Bronx Community College1 filing · 3 docs
Floor 2Bronx Community College1 filing · 3 docs
Floor 1Bronx Community College1 filing · 3 docs
Sub-BasementBronx Community College, The City University of New York2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction1703/21/2026
Dormatory Authority State of NY303/21/2026
CUNY208/28/2026
NYC School Construction Authority203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Evans Electrical ServicesElectrical103/21/2026
Building Lifecycle
All (28)Filed (2)Violation (10)Special Inspection (16)
08/24/2026
Filed — Alteration
FILING TO IMPLEMENT AN UPGRADE TO THE BUILDING MANAGEMENT SYS (BMS). THE BMS UPGRADE INCLUDES THE INSTALLATION OF NEW CONTROLLERS, ACTUATORS AND CONTROL DEVICES AND UPDATED SEQUENCES OF OPERATIONS FOR ALL MAJOR AND MINOR EQUIPMENT TYPES IN THE FACILITY.
X01436935-I1
07/27/2026
Special inspection requirement — Mechanical Systems
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/27/2026
Special inspection requirement — High Temperature Hot Water Piping (Welding)
07/27/2026
Special inspection requirement — High-Pressure Steam Piping (Welding)
07/27/2026
Special inspection requirement — Final
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
07/27/2026
Special inspection requirement — Shutoff dampers
07/27/2026
Special inspection requirement — Maintenance information
07/27/2026
Special inspection requirement — Ventilation and air distribution system
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/11/2026
Filed — Alteration
FILING FOR INSTALLATION OF NEW HOT WATER FLOW METER AS PER PLANS. WORK INCLUDES PROVIDING A BTU METER TO MEASURE SUPPLY AND RETURN TEMPERATURE & TO RE-INSTALLED ALL DISTURBED PIPING, ASSOCIATED SUPPORT AND RE-INSULATE DISTURBED PIPING AS PER SPECIFICATION
X01250750-I1
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/02/2025
Special inspection requirement — Mechanical Systems
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
07/02/2025
Special inspection requirement — Final
07/02/2025
Special inspection requirement — Metering
10/04/2024
Violation issued (FDNY_ORDER, closed)
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDAks International06/23/2025
BISMHISSUEDAks International06/23/2025
BISMHISSUEDAks International03/27/2024
BISOTISSUEDAks International03/27/2024
BISOTISSUEDAks International03/27/2023
BISMHISSUEDAks International03/27/2023
BISMHISSUEDAks International06/13/2022
BISOTISSUEDAks International03/25/2022
BISOTISSUEDAks International03/30/2021
BISOTISSUEDAks International05/04/2020
BISMHISSUEDACS System Associates05/01/2020
BISOTISSUEDAks International11/25/2019
BISMHISSUEDACS System Associates03/27/2019
BISMHISSUEDACS System Associates07/18/2018
BISMHISSUEDTemperature Systems11/29/2016
BISMHISSUEDR & L Heating & Air Cond10/01/2015
BISMHISSUEDMaric Mechanical01/02/2013
BISMHISSUEDMaric Mechanical03/15/2012
BISPLISSUEDArista Plumbing & Heating11/04/2011
BISMHISSUEDMaric Mechanical10/26/2011
BISOTRE-ISSUEDChampion Contruction05/23/2011
BISPLISSUEDVarsity Plumbing and Heating03/06/2008
BISOTISSUEDChampion Construction11/08/2007
BISMHISSUEDMa Angeliades01/19/2006
BISOTISSUEDMa Angeliades08/24/2004
2 projects · most recent 03/14/2021
General Wiring
FiledStatusContractorScope
03/14/2021Permit IssuedEvans Electrical ServicesGeneral Wiring
05/28/2020Permit IssuedWelsbach Electric1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/27/2026Mechanical Systems—special
07/27/2026Fire-Resistant Penetrations and Joints—special
07/27/2026High Temperature Hot Water Piping (Welding)—special
07/27/2026High-Pressure Steam Piping (Welding)—special
07/27/2026Final—progress
07/27/2026Energy Code Compliance Inspections—progress
07/27/2026Shutoff dampers—energy_progress
07/27/2026Maintenance information—energy_progress
07/27/2026Ventilation and air distribution system—energy_progress
07/27/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
07/02/2025Mechanical Systems—special
07/02/2025Fire-Resistant Penetrations and Joints—special
07/02/2025Energy Code Compliance Inspections—progress
07/02/2025Final—progress
07/02/2025Metering—energy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bronx Community CollegeEducationSub-basement, Floors 1–4, Roof
Project X01436935 Alteration · Approved · 08/24/2026
The City University of New YorkEducationSub-basement
Project X01250750 Alteration · Approved · 06/11/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X01436935-I1Request digital key ↗
08/16/2026X01250750-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION20
01/22/2026220682982Open ↗
07/24/2025220682982Open ↗
07/21/2025220682982Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION9
06/13/2022220682982Open ↗
06/10/2022220682982Open ↗
05/05/2020220682982Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
05/20/2019220682982Open ↗
05/20/2019220682982Open ↗
05/20/2019220682982Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X01436935-I1Open ↗
08/16/2026X01250750-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/15/2018220648805Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/15/2018220648805Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
10/04/2012220134049Open ↗
10/04/2012220134049Open ↗
▸BISSCHEDULE B - PLUMBING1
08/29/2011220134049Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/15/2018220648805Open ↗
10/02/2015220345856Open ↗
09/25/2014220404701Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X01436935-I1Open ↗
08/16/2026X01250750-I1Open ↗
▸BISASBESTOS: WORK UNDER 1000 SQFT (DEP ACP7)1
11/25/2019220682982Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
05/20/2019220682982Open ↗
12/21/2018220682982Open ↗
12/21/2018220682982Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
01/29/2026220682982Open ↗
01/21/2026220682982Open ↗
01/21/2026220682982Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/14/2020220648805Open ↗
09/15/2017220345856Open ↗
03/03/2017220404701Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
08/29/2011220134049Open ↗
08/29/2011220134049Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/05/2015220404701Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/23/2025220682982Open ↗
03/05/2025220682982Open ↗
09/21/2021220682982Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/14/2020220648805Open ↗
09/22/2017220345856Open ↗
09/15/2017220345856Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/21/2018220682982Open ↗
12/11/2018220680369Open ↗
05/15/2018220648805Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/25/2026X01436935-I1Open ↗
08/16/2026X01250750-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/29/2011220134049Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
12/14/2020220648805Open ↗
12/21/2018220682982Open ↗
12/21/2018220682982Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION8
02/06/2026220682982Open ↗
02/06/2026220682982Open ↗
07/21/2025220682982Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
12/21/2018220682982Open ↗
12/21/2018220682982Open ↗
12/11/2018220680369Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM1
09/15/2017220345856Open ↗
▸BISeFiling Job Application Cover Sheet1
10/09/2014220404701Open ↗