| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01179507 ↗ | 294 EAST KINGSBRIDGE RD BRONX | Alteration | Permit Issued | 03/26/2025 | 08/31/2026 | Design GENESYS ENGINEERING Owner NEW YORK PUBLIC LIBRARY | Mechanical work for comprehensive energy upgrades as per plans filed herewith. No change to use, egress or occupancy |
| Q08032508 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 11/07/2022 | 08/12/2026 | Design YSRAEL A. SEINUK, P.C. Owner CUNY | FILING HEREWITH STRUCTURAL WORK ON THE BASEMENT, 1ST THROUGH 9TH FLOOR AND ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR … |
| Q08029049 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 11/07/2022 | 08/07/2026 | Owner CUNY | FILING HEREWITH RENOVATION ON THE BSMT, 1 THRU 9TH FLOOR , ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| Q01271763 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 08/28/2025 | 08/06/2026 | Design EnTech Engineering, P.C. Owner DASNY | civil work at Razran hall, earth and excavation work as per plans |
| Q01420803 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 06/29/2026 | 07/13/2026 | Design FRANK S CAMINITI, RA | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 66-40 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, E… |
| X01201650 ↗ | 294 EAST KINGSBRIDGE RD BRONX | Alteration | Signed-off | 04/16/2025 | 06/10/2026 | Design POPLI DESIGN GROUP Owner NEW YORK PUBLIC LIBRARY | STRUCTURAL WORK INCLUDES REMOVAL OF EXISTING ROOF MOUNTED CONCRETE PIERS SUPPORTING CURRENT MECHANICAL EQUIPMENT, INSTALLATION OF STRUCTURA… |
| Name | Projects together | Most recent |
|---|---|---|
| GENESYS ENGINEERING | 60 | 09/18/2025 |
| AHUJA PARTNERSHIP ARCHITECTS | 40 | 10/29/2025 |
| YU & ASSOCIATES | 17 | 12/04/2025 |
| SILMAN | 12 | 05/20/2026 |
| SYSKA HENNESSY GROUP | 3 | 11/06/2024 |
| THE LIRO GROUP | 3 | 04/14/2023 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 02/18/2025 |
| Watts Architects & Engineers | 2 | 06/15/2026 |
| YSRAEL A. SEINUK, P.C. | 2 | 03/24/2026 |
| 360 ENGINEERING P.C. | 1 | 08/26/2026 |
| ADROIT ENGINEERING PLLC | 1 | 09/01/2026 |
| CDM SMITH | 1 | 09/19/2024 |
| EnTech Engineering, P.C. | 1 | 08/26/2026 |
| FRANK S CAMINITI, RA | 1 | 06/29/2026 |
| GREENMAN-PEDERSEN, INC. | 1 | 01/27/2026 |
| JFK&M CONSULTING ENGINEERS | 1 | 08/20/2024 |
| JMV ARCHITECT, PLLC | 1 | 01/27/2026 |
| KS ENGINEERS, P.C. | 1 | 02/14/2024 |
| MEHDI GHAZI, P.E., P.C. | 1 | 01/10/2023 |
| MITCHELL / GIURGOLA ARCHITECTS | 1 | 09/01/2026 |
| POPLI DESIGN GROUP | 1 | 04/16/2025 |
| SUPERSTRUCTURES ENG. + ARCH. | 1 | 02/14/2024 |
| T.F. CUSANELLI & FILLETTI ARCH | 1 | 03/11/2019 |
| WSP | 1 | 06/10/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EASTERN PLBG & MECH CONTR | 4 | 12/04/2025 |
| ARK SYSTEMS ELECTRIC CORP | 2 | 01/27/2026 |
| ALL BOROUGH GROUP SVC INC | 1 | 01/10/2023 |
| C & M GENERAL CONTRACT IN | 1 | 05/25/2023 |
| DYNASTY CONTRACTING LLC | 1 | 01/10/2023 |
| NY BUILDERS MILLENNIUM US | 1 | 03/11/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| NEW YORK CITY HOUSING AUTHORITY | 101 | 12/04/2025 |
| DASNY | 12 | 08/26/2026 |
| NEW YORK PUBLIC LIBRARY | 3 | 06/15/2026 |
| CUNY | 2 | 09/01/2026 |
| NYC HEALTH AND HOSPITAL WOODHULL | 1 | 02/18/2025 |
| SL GREEN REALTY CORP | 1 | 08/20/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 114 | 08/26/2026 |
| JAM CONSULTANTS, INC. | 3 | 06/10/2025 |
| J. CALLAHAN CONSULTING, INC. | 2 | 09/01/2026 |
| JMV ASSOCIATES LLC | 2 | 01/27/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 08/20/2024 |
| Enviornmental & Energy Solutions | 1 | 02/18/2025 |
| MUNICIPAL EXPEDITING INC | 1 | 11/06/2024 |
| RPO INC. | 1 | 09/19/2024 |
| SUPERSTRUCTURES ENG + ARCH | 1 | 02/14/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01179507 ↗ | 294 EAST KINGSBRIDGE RD BRONX | Alteration | Permit Issued | 03/26/2025 | 08/31/2026 | Design GENESYS ENGINEERING Owner NEW YORK PUBLIC LIBRARY | Mechanical work for comprehensive energy upgrades as per plans filed herewith. No change to use, egress or occupancy |
| Q08032508 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 11/07/2022 | 08/12/2026 | Design YSRAEL A. SEINUK, P.C. Owner CUNY | FILING HEREWITH STRUCTURAL WORK ON THE BASEMENT, 1ST THROUGH 9TH FLOOR AND ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR … |
| Q08029049 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 11/07/2022 | 08/07/2026 | Owner CUNY | FILING HEREWITH RENOVATION ON THE BSMT, 1 THRU 9TH FLOOR , ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. |
| Q01271763 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 08/28/2025 | 08/06/2026 | Design EnTech Engineering, P.C. Owner DASNY | civil work at Razran hall, earth and excavation work as per plans |
| Q01420803 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 06/29/2026 | 07/13/2026 | Design FRANK S CAMINITI, RA | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 66-40 KISSENA BOULEVARD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, E… |
| X01201650 ↗ | 294 EAST KINGSBRIDGE RD BRONX | Alteration | Signed-off | 04/16/2025 | 06/10/2026 | Design POPLI DESIGN GROUP Owner NEW YORK PUBLIC LIBRARY | STRUCTURAL WORK INCLUDES REMOVAL OF EXISTING ROOF MOUNTED CONCRETE PIERS SUPPORTING CURRENT MECHANICAL EQUIPMENT, INSTALLATION OF STRUCTURA… |
| Q01228855 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 05/12/2026 | Design Watts Architects & Engineers Owner DASNY | GENERAL CONSTRUCTION WORK AT RAZRAN HALL FOR COOLING TOWER PLATFORM, WORK INCLUDE CORE DRILLING OPENING THROUGH ROOF DECK AND ROOFING FOR NE… |
| Q01230196 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 09/05/2025 | 05/07/2026 | Design GENESYS ENGINEERING | INSTALLATION OF NEW COOLING TOWER CT-4, PLATFORMS AND ACCESS LADDERS ON EXISTING DUNNAGE.. RAZRAN HALL |
| Q01230145 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 09/05/2025 | 05/06/2026 | Design GENESYS ENGINEERING Owner DASNY | INSTALLATION OF NEW UNDERGROUND CHILLED WATER SUPPLY, RETURN PIPING AND CONNECTION FROM RAZRAN HALL TO DELANY HALL FOR FUTURE USE. |
| Q00984460 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 02/05/2024 | 05/05/2026 | Design SUPERSTRUCTURES ENG. + ARCH. Owner DASNY | QC, Steam Tunnel Structural Repairs per plans: Removal & replacement of existing waterproofing membrane, flashings. Repair of spalled concre… |
| Q01227327 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 05/05/2026 | Design GENESYS ENGINEERING Owner DASNY | INSTALLATION OF NEW CHILLED WATER SUPPLY, RETURN PIPING AND CONNECTION FROM EXISTING CONNECTION IN STEAM TUNNEL TO I-BUILDING ROOF FOR FUTUR… |
| Q01226406 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 05/04/2026 | Design GENESYS ENGINEERING Owner DASNY | installation of new backup chilled water supply and return piping from existing manhole #6 (MH-6) near I-building to the colden complex serv… |
| Q01230113 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 05/04/2026 | Design GENESYS ENGINEERING | INSTALLATION OF NEW CHILLED WATER SUPPLY, RETURN PIPING AND CONNECTION FROM EXISTING CONNECTION IN STEAM TUNNEL TO KLAPPER HALL FOR FUTURE U… |
| Q01299570 ↗ | 152-50 MELBOURNE AVENUE QUEENS | Alteration | Permit Issued | 10/27/2025 | 04/30/2026 | — | INSTALL NEW WALKWAY GRATING AND PIPE TUBE RAILING ON TOP OF EXISTING STEEL DUNNAGE FRAMING THAT SURROUNDS NEW COOLING TOWER #4 (CT-4). INSTA… |
| Q01045151 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 11/06/2024 | 04/23/2026 | Design SYSKA HENNESSY GROUP | Dining Hall: replace existing PRV Station. |
| Q01045166 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 11/06/2024 | 04/23/2026 | Design SYSKA HENNESSY GROUP Filer MUNICIPAL EXPEDITING INC | Kiely Hall Basement: replace existing PRV station. |
| Q01045170 ↗ | 63-30 KISSENA BOULEVARD QUEENS | Alteration | Permit Issued | 11/06/2024 | 04/23/2026 | Design SYSKA HENNESSY GROUP | Klapper Hall: REPLACE EXISTING PRV STATION |
| B00705023 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 03/31/2022 | 04/09/2026 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| X00823131 ↗ | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Permit Issued | 06/27/2023 | 04/09/2026 | Design GREENMAN-PEDERSEN, INC. Filer JMV ASSOCIATES LLC | Proposed new structural steel support under new roof openings for new mechanical equipment and structural steel support for new openings in … |
| B00704992 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 03/31/2022 | 04/08/2026 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| B00705015 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 04/01/2022 | 04/08/2026 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| B00710072 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 04/13/2022 | 04/08/2026 | Design GENESYS ENGINEERING | INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE AS PER PLANS |
| B00725697 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 06/27/2022 | 04/08/2026 | Design AHUJA PARTNERSHIP ARCHITECTS | general construction work as per plans filed herewith. no change to use, egress or occupancy |
| Q01315913 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 12/02/2025 | 02/19/2026 | Design YU & ASSOCIATES | REMOVAL OF EXISTING FEATURES, AS NECESSARY, FOR THE INSTALLATION OF NEW CONCRETE PADS ASSOCIATED WITH THE NEW GENERATOR. TRENCHING, AS NECES… |
| B01115395 ↗ | 760 BROADWAY BROOKLYN | Alteration | Permit Issued | 02/18/2025 | 02/03/2026 | Installation of four (4) new Caterpillar generators. | |
| Q08032658 ↗ | 29-10 THOMSON AVENUE QUEENS | Alteration | Permit Issued | 11/07/2022 | 01/06/2026 | FILING HEREWITH MODIFICATION OF HVAC SYSTEM ON THE BASEMENT, 1ST THRU 9TH FLOOR AND ROOF AS INDICATED ON THE DRAWINGS.. NO CHANGE IN USE EG… | |
| Q00809131 ↗ | 139-45 35 AVENUE QUEENS | Alteration | Permit Issued | 01/10/2023 | 12/29/2025 | Design MEHDI GHAZI, P.E., P.C. | INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| B00905229 ↗ | 1250 LORING AVENUE BROOKLYN | Alteration | Signed-off | 08/29/2023 | 10/31/2025 | Design YU & ASSOCIATES | NEW CURB CUT AS PER PLANS FILED HEREWITH. |
| M01050071 ↗ | 555 WEST 57TH STREET MANHATTAN | Alteration | Permit Issued | 08/20/2024 | 09/29/2025 | Design JFK&M CONSULTING ENGINEERS Owner SL GREEN REALTY CORP | Connect new air outlets to existing duct distribution. Install new computer room AC unit. New condenser water piping. |
| B07993686 ↗ | 1250 LORING AVENUE BROOKLYN | Alteration | Signed-off | 09/29/2022 | 09/24/2025 | Design YU & ASSOCIATES | site civil work for proposed new building |
| M00733993 ↗ | 160 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 09/18/2025 | Design GENESYS ENGINEERING Owner DASNY | MECHANICAL WORK FOR CITY COLLEGE OF NEW YORK NORTH ACADEMIC CENTER CHILLED WATER & CONDENSER WATER SYSTEM UPGRADES AND INTERCONNECTIONS TO M… |
| M00770710 ↗ | 85 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 09/18/2025 | Design GENESYS ENGINEERING Owner DASNY | MECHANICAL MECHANICAL WORK FOR CITY COLLEGE OF NEW YORK NORTH ACADEMIC CENTER CHILLED WATER & CONDENSER WATER SYSTEM UPGRADES AS PER PLANS F… |
| M00770757 ↗ | 85 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2022 | 09/18/2025 | Design SILMAN Owner DASNY | STRUCTURAL STEEL FRAMING WORK FOR CITY COLLEGE OF NEW YORK MARSHAK HALL- ADVANCED SCIENCE RESEARCH CENTER. NO CHANGE IN USE EGRESS OR OCCUPA… |
| B00787510 ↗ | 1250 LORING AVENUE BROOKLYN | Alteration | Signed-off | 09/06/2022 | 09/17/2025 | Design GENESYS ENGINEERING | Installation of a temporary plywood construction fence as per plans filed herewith. |
| M00733834 ↗ | 160 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/21/2022 | 09/17/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK FOR CITY COLLEGE OF NEW YORK NORTH ACADEMIC CENTER CHILLED WATER & CONDENSER WATER SYSTEM UPGRADES AND INTERCONNEC… |
| M00733904 ↗ | 160 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2022 | 09/17/2025 | Design SILMAN | STRUCTURAL STEEL FRAMING WORK FOR CITY COLLEGE OF NEW YORK NORTH ACADEMIC CENTER CHILLED WATER & CONDENSER WATER SYSTEM UPGRADES AND INTERCO… |
| M00770741 ↗ | 85 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2022 | 09/17/2025 | Design AHUJA PARTNERSHIP ARCHITECTS Owner DASNY | GENERAL CONSTRUCTON WORK AS PER PLANS FILED HEREWITH FOR CITY UNIVERSITY OF NEW YORK ADVANCED SCIENCE RESEARCH CENTER CHILLED WATER A& CONDE… |
| M00770866 ↗ | 181 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/23/2022 | 09/17/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR CITY COLLEGE OF NEW YORK NORTH ACADEMIC CENTER MARSHAK CHILLED WATER & CONDENSER WATER SYSTEM UPGRADES AS PER PLANS HERE… |
| X01201663 ↗ | 294 EAST KINGSBRIDGE RD BRONX | Alteration | Signed-off | 04/17/2025 | 08/06/2025 | Design Watts Architects & Engineers Owner NEW YORK PUBLIC LIBRARY | general construction work, scope include remove and replace existing roofing membrane, remove GWB 5th fl N. Corridor, rebuild areas of roofi… |
| 220682740BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 01/17/2020 | 07/25/2025 | — | MH, OT |
| B00725288 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2022 | 07/24/2025 | Design GENESYS ENGINEERING | MECHANICAL SYSTEM MODIFICATION AS PER PLANS FILED HEREWITH. |
| B00725736 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 06/28/2022 | 07/24/2025 | Design GENESYS ENGINEERING | MECHANICAL SYSTEM MODIFICATION AS PER PLANS FILED HEREWITH. |
| B00725813 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2022 | 07/24/2025 | Design GENESYS ENGINEERING | MECHANICAL SYSTEM MODIFICATION AS PER PLANS FILED HEREWITH. |
| B00725859 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2022 | 07/24/2025 | Design GENESYS ENGINEERING | MECHANICAL SYSTEM MODIFICATION AS PER PLANS FILED HEREWITH. |
| B00727705 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 06/27/2022 | 07/24/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | general construction work as per plans filed herewith. no change to use, egress or occupancy |
| B00725234 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Signed-off | 06/28/2022 | 07/23/2025 | Design GENESYS ENGINEERING | MECHANICAL SYSTEM MODIFICATION AS PER PLANS FILED HEREWITH. |
| B00779145 ↗ | 320 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/19/2022 | 07/23/2025 | Design GENESYS ENGINEERING | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PROPOSED NEW BUILDING AT 320 DUMONT AVENUE |
| 220682759BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 07/21/2025 | — | MH, OT |
| X01078703 ↗ | 120 GALE PLACE BRONX | Alteration | Signed-off | 08/08/2024 | 06/25/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK FOR DRY COOLER SUPPORT A AMALGAMATED HOUSING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 220682401BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220682410BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 09/21/2022 | 06/23/2025 | — | MH, OT |
| 220682429BIS | 2051 UNIVERSITY AVENUE BRONX | — | ISSUED | 09/30/2022 | 06/23/2025 | — | OT |
| 220682438BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220682697BIS | 2075 UNIVERSITY AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220682731BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220682768BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 05/04/2020 | 06/23/2025 | — | OT |
| 220682982BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT |
| 220683008BIS | 2075 UNIVERSITY AVENUE BRONX | — | ISSUED | 06/07/2022 | 06/23/2025 | — | OT |
| 220683017BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220683026BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220683124BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT, PL |
| 220683133BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/27/2019 | 06/23/2025 | — | MH, OT |
| 220683142BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT |
| 220683151BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT |
| 220683160BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT |
| 220683302BIS | 1930 SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | OT |
| 220683311BIS | SEDGWICK AVENUE BRONX | — | ISSUED | 11/25/2019 | 06/23/2025 | — | MH, OT, PL |
| B07993367 ↗ | 1250 LORING AVENUE BROOKLYN | Alteration | Signed-off | 09/29/2022 | 05/21/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR ONE (1) STORY UTILITY BUILDING FOR HEAT PUMPS AS PER THE PLANS FILED HEREWITH. |
| B00782515 ↗ | 1250 LORING AVENUE BROOKLYN | New Building | Permit Issued | 09/28/2022 | 04/11/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | CONSTRUCTION OF ONE (1) STORY UTILITY BUILDING #1 AS PER THE PLANS FILED HEREWITH. (PINK) |
| B00726571 ↗ | 2628 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 08/11/2022 | 04/07/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| B00740170 ↗ | 318 DUMONT AVENUE BROOKLYN | New Building | Permit Issued | 08/11/2022 | 04/02/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | CONSTRUCTION OF ONE (1) STORY UTILITY BUILDING #1 AS PER THE PLANS FILED HEREWITH. (TILDEN) |
| B00740260 ↗ | 320 DUMONT AVENUE BROOKLYN | New Building | Permit Issued | 08/11/2022 | 04/02/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | CONSTRUCTION OF ONE (1) STORY UTILITY BUILDING #2 AS PER THE PLANS FILED HEREWITH. (TILDEN) |
| B00741477 ↗ | 350 DUMONT AVENUE BROOKLYN | New Building | Permit Issued | 08/11/2022 | 04/02/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | CONSTRUCTION OF ONE (1) STORY UTILITY BUILDING #3 AS PER THE PLANS FILED HEREWITH. |
| B00741527 ↗ | 352 DUMONT AVENUE BROOKLYN | New Building | Permit Issued | 08/12/2022 | 04/02/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | CONSTRUCTION OF ONE (1) STORY UTILITY BUILDING #4 AS PER THE PLANS FILED HEREWITH. |
| B00725828 ↗ | 263 LIVONIA AVENUE BROOKLYN | Alteration | Permit Issued | 06/27/2022 | 04/01/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | general construction work as per plans filed herewith. no change to use, egress or occupancy |
| B00748989 ↗ | 318 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2022 | 04/01/2025 | Design SILMAN | STRUCTURAL WORK FOR PROPOSED HEAT PUMP BUILDING #1 AS PER PLANS FILED HEREWITH. |
| B00749021 ↗ | 320 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2022 | 04/01/2025 | Design SILMAN | STRUCTURAL WORK FOR PROPOSED HEAT PUMP BUILDING #2 AS PER PLANS FILED HEREWITH. |
| B00749053 ↗ | 350 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2022 | 04/01/2025 | Design SILMAN | STRUCTURAL WORK FOR PROPOSED HEAT PUMP BUILDING #3 AS PER PLANS FILED HEREWITH. |
| B00749085 ↗ | 352 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2022 | 04/01/2025 | Design SILMAN | STRUCTURAL WORK FOR PROPOSED HEAT PUMP BUILDING #4 AS PER PLANS FILED HEREWITH. |
| B00749104 ↗ | 318 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 09/20/2022 | 04/01/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR ONE (1) STORY UTILITY BUILDING #1 FOR HEAT PUMPS AS PER THE PLANS FILED HEREWITH. |
| B00749136 ↗ | 320 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 09/20/2022 | 04/01/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR ONE (1) STORY UTILITY BUILDING #2 FOR HEAT PUMPS AS PER THE PLANS FILED HEREWITH. |
| B00749185 ↗ | 350 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 09/20/2022 | 04/01/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR ONE (1) STORY UTILITY BUILDING #3 FOR HEAT PUMPS AS PER THE PLANS FILED HEREWITH. |
| B00749203 ↗ | 352 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 09/20/2022 | 04/01/2025 | Design GENESYS ENGINEERING | MECHANICAL WORK FOR ONE (1) STORY UTILITY BUILDING #4 FOR HEAT PUMPS AS PER THE PLANS FILED HEREWITH. |
| B00779138 ↗ | 318 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/19/2022 | 04/01/2025 | Design GENESYS ENGINEERING | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PROPOSED NEW BUILDING AT 318 DUMONT AVENUE |
| B00779150 ↗ | 350 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/19/2022 | 04/01/2025 | Design GENESYS ENGINEERING | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PROPOSED NEW BUILDING AT 350 DUMONT AVENUE |
| B00779153 ↗ | 352 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/19/2022 | 04/01/2025 | Design GENESYS ENGINEERING | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PROPOSED NEW BUILDING AT 352 DUMONT AVENUE |
| B07995512 ↗ | 350 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 09/20/2022 | 04/01/2025 | Design YU & ASSOCIATES | SITE CIVIL WORK FOR NYCHA TILDEN PROPOSED NEW BUILDING AT 350 DUMONT AVENUE |
| B00732003 ↗ | 2628 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 08/11/2022 | 03/28/2025 | Design GENESYS ENGINEERING | mechanical system modification steam for installation hot water system for NYCHA pink building #7 as per plans filed herewith. no change to … |
| B00705043 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 03/31/2022 | 03/27/2025 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| B00733313 ↗ | 1258 LORING AVENUE BROOKLYN | Alteration | Signed-off | 07/06/2022 | 03/26/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| B00733269 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 07/06/2022 | 03/25/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M00770896 ↗ | 181 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 09/22/2022 | 03/25/2025 | Design SILMAN Owner DASNY | STRUCTURAL STEEL FRAMING WORK FOR CITY COLLEGE OF NEW YORK MARSHAK HALL AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00704961 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 04/01/2022 | 03/24/2025 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| B00705027 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 03/31/2022 | 03/24/2025 | Design GENESYS ENGINEERING | Installation of construction trailer as per plans filed herewith |
| B00710090 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 04/13/2022 | 03/24/2025 | Design GENESYS ENGINEERING | installation of temporary construction chain link fence as per plans filed herewith |
| B00733229 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 08/11/2022 | 03/24/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| B00733239 ↗ | 2628 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 08/11/2022 | 03/24/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| B00733259 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 07/06/2022 | 03/24/2025 | Design AHUJA PARTNERSHIP ARCHITECTS | GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| B00772320 ↗ | 2700 LINDEN BOULEVARD BROOKLYN | Alteration | Signed-off | 07/14/2022 | 03/24/2025 | Design GENESYS ENGINEERING | installation of temporary construction trailer at pink houses |
| B00732159 ↗ | 1210 LORING AVENUE BROOKLYN | Alteration | Signed-off | 07/13/2022 | 03/21/2025 | Design GENESYS ENGINEERING | mechanical system modification steam for installation hot water system for NYCHA pink building #14 as per plans filed herewith. no change to… |