← Back
BuildNYC
Hospital, sanitarium, mental institution
1250 1ST AVENUE
MANHATTAN · BIN 1045572
💬 Discuss this project
1948Year Built
12Stories
I1Building Class
C1-9Zoning
183,626 sfGross Floor Area
1Units
LL97 Covered1 Active Violation ▸FISP: SWARMP
Hospital, sanitarium, mental institution · Owner of record: Memorial Hosp for Cancer & Diseases · 20,083 sf lot · 9.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSprinkler system and piping modification1 filing
RoofMSKCC Design + Construction, Memorial Sloan Kettering CancerUnder Construction2p · 4 filings · 5 docs
BulkheadMSKCC Design + Construction1p · 1 filing · 5 docs
Floor 14SCHWARTZ 12th FLOOR LABORATORY RENOVATIONUnder Construction3p · 2 filings · 20 docs
Floor 13Memorial Sloan Kettering Cancer CenterUnder Construction6p · 3 filings · 20 docs
Floor 12SCHWARTZ 12th FLOOR LABORATORY RENOVATIONUnder Construction12p · 2 filings · 20 docs
Floor 11SCHWARTZ 12th FLOOR LABORATORY RENOVATIONUnder Construction2p · 1 filing · 20 docs
Floor 10Memorial Sloan Kettering Cancer Center7p · 2 filings · 16 docs
Floor 9
Floor 8Memorial Sloan Kettering Cancer Center15p · 5 filings
Floor 7Schwartz Laboratory Renovations9p · 2 filings
Floor 6Memorial Sloan Kettering Cancer Center1p · 2 filings · 20 docs
Floor 5Memorial Sloan Kettering Cancer Center3 filings · 7 docs
Floor 4Memorial Sloan Kettering Cancer Center3p · 8 filings · 14 docs
Floor 3Memorial Sloan Kettering Cancer Center3 filings · 7 docs
Floor 2Memorial Sloan Kettering Cancer Center11p · 5 filings · 17 docs
Floor 1Memorial Sloan Kettering Cancer Center1p · 4 filings
CellarMemorial Sloan Kettering Cancer Center1p · 1 filing
Sub-CellarMemorial Sloan Kettering Cancer CenterUnder Construction1 filing · 11 docs
Site & exteriorMSKCC Design + ConstructionUnder Construction7 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSKCC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Integrations410/02/2026
AKF Engineers3205/05/2026
Cany Architecture & Engineering209/29/2025
Efh Architecture608/19/2025
Silman208/19/2024
Tony Alfieri Architect206/18/2024
Tohfaz Uddin PE304/29/2024
Gensler410/11/2023
Jaros Baum & Bolles308/29/2023
FL&M Engineering Design & Inspection106/29/2023
David Schwartz RA312/10/2021
Jose L. Pena, P.E305/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO7803/21/2026
United Safety Consultants103/21/2026
Gillman Consulting1403/21/2026
Green Studio203/21/2026
Arsenal Building Consultants203/21/2026
A1 Expediting Service403/21/2026
P.wolfe Consultants403/21/2026
DC Turano803/21/2026
Louis Striar603/21/2026
Skyline Access103/21/2026
Sato Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JGN ConstructionGeneral Contractor6608/05/2026
Ashlar MechanicalFire Protection1207/08/2026
Spring ScaffoldingScaffold1208/01/2026
Consigli Construction CoGeneral Contractor707/08/2026
NJS Electrical ServicesElectrical603/21/2026
Lawrence J. LevineFire Protection603/21/2026
Alliance PlumbingPlumbing407/08/2026
Tristate Plumbing ServicesPlumbing407/08/2026
Par Plumbing CoPlumbing407/08/2026
York Scaffold EquipmentScaffold403/21/2026
J. Giarnella & Sons II, IScaffold303/21/2026
J. Giarnella & Sons II, IGeneral Contractor303/21/2026
Tru-Art Sign CoSign hanger307/08/2026
Current Fire ProtectionFire Protection307/08/2026
Par Fire ProtectionFire Protection207/08/2026
Lendlease (US) ConstructionGeneral Contractor207/08/2026
Amtex ElectricalElectrical203/21/2026
NJS Electrical ServicesElectrical103/22/2026
Adco ElectricalElectrical103/22/2026
Sato Construction CoGeneral Contractor107/10/2026
Rite-Way Internal RemovalGeneral Contractor107/08/2026
Cardoza PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Framework Engineering8217210/01/2026
Atlas ATC Engineering80112505/05/2026
Alan Margolin & Associates423209/29/2025
Bureau Veritas Na6902509/26/2025
Atlantic Engineeringlabor13811410/12/2021
Building Lifecycle
All (300)Filed (69)Permit Issued (80)Signed Off (37)Facade (FISP) (10)Violation (26)Inspection (42)Objection (6)Special Inspection (30)
10/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01393086-P1
10/01/2026
Filed — Alteration
INITIAL CD5 : FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING SPECIALTY CREW LETTER FOR CD5 APPLICTION M01286342 TO PERFORM ACM WORK UNDER FISP APPLICATION M01155563
M01286342-P1
10/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
10/01/2026
Special inspection requirement — Post-installed Anchors
JAMES NAPOLI
08/19/2026
Permit issued — Suspended Scaffold
M01286342-I1-SC
08/04/2026
Permit issued — Mechanical Systems
M01383240-I1-MS
07/31/2026
Permit issued — Sidewalk Shed
M01393086-I1-SH
07/08/2026
Permit issued — Structural
M01155563-I1-GC-CX
06/22/2026
Permit issued — Mechanical Systems
M01066514-S1-MS
06/22/2026
Permit issued — Structural
M01066514-S2-ST
06/18/2026
Signed off — Alteration
Modification/addition to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M08038295-I1
06/05/2026
Signed off — Alteration
Mechanical work on the 12th thru 14th floors. No change in occupancy, use or egress.
M01066514-I1
05/05/2026
Filed — Alteration
Provide exhaust connection for new lab equipment to be installed. Exhaust duct to run through rated wall and connect into existing exhaust system within mechanical room. No change in occupancy, use or egress.
M01383240-S1
05/05/2026
Filed — Alteration
Provide exhaust connection for new lab equipment to be installed. Exhaust duct to run through rated wall and connect into existing exhaust system within mechanical room. No change in occupancy, use or egress.
M01383240-I1
05/05/2026
Permit issued — Protection and Mechanical Methods
M01393086-S1-PMM
05/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01393086-I1
05/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01393086-S1
05/04/2026
Permit issued — Sidewalk Shed
M01393086-I1-SH
05/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
Jorge Santos
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Jorge Santos
05/01/2026
Special inspection requirement — Post-installed Anchors
Jorge Santos
04/06/2026
Special inspection requirement — Final
Jorge Santos
04/06/2026
Special inspection requirement — Mechanical Systems
Jorge Santos
03/13/2026
Signed off — Alteration
FILING FOR PLUMBING AND SPRINKLER WORK ON 10TH FLOOR (MSK SCHWARTZ U2002438).
M08044077-S2
02/17/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
02/17/2026
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
02/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/30/2026
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted. No change in egress, use, or occupancy. (Schwartz Phase 1)
M00894212-S4
01/30/2026
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted (Schwartz Phase 2). No change in egress, use or occupancy.
M00896323-S2
01/29/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
01/29/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
01/29/2026
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/25/2026
Permit issued — Sprinklers
M08044077-S2-PL
01/12/2026
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted. No change in egress, use, or occupancy. (Schwartz Phase 1)
M00894212-S3
01/06/2026
Signed off — Alteration
Filing for plumbing and sprinkler work. No change in egress, use or occupancy.
M00751957-S1
12/24/2025
Signed off — Alteration
FILING FOR PLUMBING AND SPRINKLER WORK ON 10TH FLOOR (MSK SCHWARTZ U2002438).
M08044077-I1
12/23/2025
Signed off — Alteration
FILING FOR PLUMBING AND SPRINKLER WORK ON 10TH FLOOR (MSK SCHWARTZ U2002438).
M08044077-S1
12/23/2025
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted (Schwartz Phase 2). No change in egress, use or occupancy.
M00896323-S1
12/23/2025
Signed off — Alteration
Filing for mechanical work on 7th floor (MSK U2002438). No change in egress, use or occupancy.
M00804365-I1
12/09/2025
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted. No change in egress, use, or occupancy. (Schwartz Phase 1)
M00894212-I1
12/09/2025
Signed off — Alteration
Filing for plumbing and sprinkler modifications as per plans submitted (Schwartz Phase 2). No change in egress, use or occupancy.
M00896323-I1
12/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/29/2025
Filed — Alteration
Filing for Facade Restoration work - FISP Cycle 9C Repairs as per plans. No change to Use, Egress or Occupancy.
M01155563-I1
09/29/2025
Special inspection requirement — Sprinkler Systems
IBRAHIM MOURAD
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/26/2025
Filed — Alteration
Modification/addition to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
M08038295-P3
09/18/2025
Permit issued — Suspended Scaffold
M01286342-I1-SC
09/16/2025
Special inspection requirement — Sprinkler Systems
IBRAHIM MOURAD
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
09/12/2025
Filed — Alteration
INITIAL CD5 : FISP REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING SPECIALTY CREW LETTER FOR CD5 APPLICTION M01286342 TO PERFORM ACM WORK UNDER FISP APPLICATION M01155563
M01286342-I1
09/12/2025
Special inspection requirement — Post-installed Anchors
JAMES NAPOLI
09/12/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JAMES NAPOLI
09/11/2025
Special inspection requirement — Post-installed Anchors
RONALD GRAPIN
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
09/11/2025
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
09/10/2025
Filed — Alteration
Mechanical work on the 12th thru 14th floors. No change in occupancy, use or egress.
M01066514-P2
09/10/2025
Filed — Alteration
Mechanical work on the 12th thru 14th floors. No change in occupancy, use or egress.
M01066514-P3
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSato Construction Co08/19/2026
DOB NOWMechanical SystemsPermit IssuedJGN Construction08/04/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/31/2026
DOB NOWStructuralPermit IssuedSato Construction Co07/08/2026
DOB NOWStructuralPermit IssuedJGN Construction06/22/2026
DOB NOWMechanical SystemsPermit IssuedJGN Construction06/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding05/05/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding05/04/2026
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe01/25/2026
DOB NOWSuspended ScaffoldPermit IssuedSato Construction Co09/18/2025
DOB NOWStructuralPermit IssuedJGN Construction07/21/2025
DOB NOWGeneral ConstructionSigned-offJGN Construction07/21/2025
DOB NOWMechanical SystemsPermit IssuedJGN Construction07/21/2025
DOB NOWMechanical SystemsSigned-offJGN Construction07/21/2025
DOB NOWGeneral ConstructionSigned-offJGN Construction07/21/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe07/08/2025
DOB NOWMechanical SystemsSigned-offJGN Construction06/26/2025
DOB NOWGeneral ConstructionSigned-offJGN Construction06/25/2025
DOB NOWMechanical SystemsPermit IssuedJGN Construction03/13/2025
DOB NOWPlumbingSigned-offPar Plumbing Co02/27/2025
DOB NOWSprinklersSigned-offLawrence J. Levine02/26/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co02/21/2025
DOB NOWMechanical SystemsSigned-offJGN Construction12/31/2024
DOB NOWMechanical SystemsSigned-offJGN Construction12/31/2024
DOB NOWGeneral ConstructionSigned-offJGN Construction12/31/2024
DOB NOWSprinklersSigned-offCurrent Fire Protection I12/30/2024
DOB NOWGeneral ConstructionSigned-offJGN Construction12/19/2024
DOB NOWStructuralPermit IssuedJGN Construction12/19/2024
DOB NOWSprinklersSigned-offAshlar Mechanical12/18/2024
DOB NOWPlumbingSigned-offTristate Plumbing Services10/17/2024
DOB NOWGeneral ConstructionSigned-offLendlease (US) Construction10/04/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding09/24/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co09/17/2024
DOB NOWPlumbingSigned-offTristate Plumbing Services09/16/2024
DOB NOWGeneral ConstructionSigned-offLendlease (US) Construction08/28/2024
DOB NOWStructuralPermit IssuedJGN Construction08/26/2024
DOB NOWGeneral ConstructionSigned-offJGN Construction08/26/2024
DOB NOWMechanical SystemsSigned-offJGN Construction07/26/2024
DOB NOWGeneral ConstructionSigned-offJGN Construction07/25/2024
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co07/22/2024
+ 60 more permits on file
3 projects · most recent 09/10/2025
Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
09/10/2025Permit IssuedJGN ConstructionHeating and Air Conditioning Systems
Heat / Cool
Iec CPY06 32,000 BTU · Fan Coil Indoor ×4
CPY12 32,000 BTU · Fan Coil Indoor ×4
CPY10 25,000 BTU · Fan Coil Indoor ×2
04/30/2025Signed-offJGN ConstructionAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Iec CPY10, CPY04, FXA10 18,950 CFM · Fan Coil Indoor ×54
Liebert PW017HC 14,000 CFM · Crac Unit ×8
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×2
08/29/2023Signed-offJGN ConstructionAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Carrier Modle #42VAD06HRJY5CYE8Y 26,000 CFM · Fan Coil Indoor ×8
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×2
4 projects · most recent 09/10/2025
Sprinkler System
FiledStatusContractorScope
09/10/2025Signed-offPar Fire Protection78 heads
04/30/2025Signed-offPar Fire ProtectionSprinkler System
08/29/2023Signed-offCurrent Fire Protection ISprinkler System
06/30/2022Signed-offAshlar Mechanical89 heads
6 projects · most recent 05/05/2026
Water/Sanitary Medical Gas
FiledStatusContractorScope
05/05/2026——Medical Gas
09/10/2025Signed-offPar Plumbing CoMedical Gas, Water/Sanitary
06/23/2025Signed-offAlliance PlumbingWater/Sanitary
04/30/2025Signed-offAlliance PlumbingMedical Gas, Water/Sanitary
08/29/2023Signed-offTristate Plumbing ServicesWater/Sanitary
06/30/2022——Water/Sanitary
17 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedTop Shelf Electric—
09/30/2024Permit IssuedAdco ElectricalGeneral Wiring
04/29/2024CompleteStanco System Electrical Cont—
09/21/2023CompleteNJS Electrical ServicesGeneral Wiring
11/02/2021CompleteHarley Electric CoGeneral Wiring
11/02/2021CompleteHarley Electric CoGeneral Wiring
04/08/2021CompleteTop Shelf Electric—
08/06/2020CompleteHarley Electric CoGeneral Wiring
02/24/2020CompleteE-J Electric Installation CoGeneral Wiring
09/17/2019Permit IssuedNJS Electrical ServicesGeneral Wiring
08/27/2019CompleteStanco System Electrical Cont—
04/18/2019Permit IssuedHarley Electric CoGeneral Wiring
04/18/2019Permit IssuedHarley Electric CoGeneral Wiring
10/31/2018Permit IssuedFred Geller ElectricalGeneral Wiring
10/09/2018CompleteFred Geller ElectricalGeneral Wiring
2 projects · most recent 09/29/2025
Steel Masonry Concrete
FiledStatusContractorScope
09/29/2025Permit IssuedSato Construction CoSteel, Masonry
09/10/2025Permit IssuedJGN ConstructionSteel, Concrete
1 project · most recent 10/02/2026
Sidewalk Shed
FiledStatusContractorScope
10/02/2026Permit IssuedSpring ScaffoldingSidewalk Shed
1 project · most recent 10/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/01/2026Permit IssuedSato Construction CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 42
DateTypeResultReport
02/17/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
02/17/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
02/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
01/29/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
01/29/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
07/16/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
07/16/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2024Certified Medical Gas - MG - PL - FinishCertifiedView ↗
Latest 25 of 42.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/01/2026Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
10/01/2026Post-installed AnchorsJAMES NAPOLIspecial
05/01/2026Post-installed AnchorsJorge Santosspecial
05/01/2026Energy Code Compliance InspectionsJorge Santosprogress
05/01/2026Duct leakage testing, insulation and designJorge Santosenergy_progress
04/06/2026Mechanical SystemsJorge Santosspecial
04/06/2026FinalJorge Santosprogress
09/29/2025Sprinkler SystemsIBRAHIM MOURADspecial
09/29/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/16/2025Sprinkler SystemsIBRAHIM MOURADspecial
09/16/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
09/12/2025Post-installed AnchorsJAMES NAPOLIspecial
09/12/2025Alternative Materials - OTCR Buildings Bulletin NumberJAMES NAPOLIspecial
09/11/2025Post-installed AnchorsRONALD GRAPINspecial
09/11/2025Sprinkler SystemsRONALD GRAPINspecial
09/11/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
09/05/2025Interior lighting powerRONALD GRAPINenergy_progress
09/05/2025Sprinkler SystemsRONALD GRAPINspecial
09/05/2025Post-installed AnchorsRONALD GRAPINspecial
09/05/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
09/05/2025Mechanical SystemsRONALD GRAPINspecial
09/05/2025Energy Code Compliance InspectionsRONALD GRAPINprogress
09/05/2025FinalRONALD GRAPINprogress
09/05/2025Lighting controlsRONALD GRAPINenergy_progress
09/05/2025Maintenance informationRONALD GRAPINenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Memorial Sloan Kettering Cancer CenterMedical / HealthcareSub-cellar, Cellar, Floors 1–6, 8, 10, 13, Roof
Project M01383240 Alteration · Permit Entire · 05/05/2026
Project M00882939 Alteration · Permit Entire · 06/23/2025
Project M01019284 Alteration · Permit Entire · 06/18/2024
Project M00833977 Alteration · LOC Issued · 10/30/2023
Project M00896323 Alteration · LOC Issued · 08/21/2023
Project M00894212 Alteration · LOC Issued · 07/18/2023
Project M08044077 Alteration · LOC Issued · 01/11/2023
Project M00502005 Alteration · LOC Issued · 04/16/2021
Project M00336790 Alteration · LOC Issued · 05/27/2020
Project M00336792 Alteration · LOC Issued · 05/27/2020
Project M00336804 Alteration · LOC Issued · 05/27/2020
Project M00346736 Alteration · LOC Issued · 05/08/2020
MSKCC Design + ConstructionMedical / HealthcareRoof
Project M01155563 Alteration · Permit Entire · 09/29/2025
Project M00898668 Alteration · LOC Issued · 08/11/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,758 on file (BIS + DOB NOW)
▸Plans & Drawings69
▸DOB NOWPlans/Sketch59
09/03/2026M00502005-I1Request digital key ↗
09/03/2026M00499907-I1Request digital key ↗
09/03/2026M00504694-I1Request digital key ↗
Showing 3 of 59 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/04/2026M00336804-I1Request digital key ↗
09/04/2026M00336792-I1Request digital key ↗
09/04/2026M00336790-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00293014-I1Request digital key ↗
09/05/2026M00346736-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00293014-I1Request digital key ↗
09/05/2026M00346736-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00296804-I1Request digital key ↗
09/05/2026M00346664-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00216834-I1Request digital key ↗
▸Applications & Permits311
▸BISPLAN / WORK APPROVAL APPLICATION165
02/13/2022123034448Open ↗
07/06/2021123237595Open ↗
05/24/2021123002062Open ↗
Showing 3 of 165 on file for this type
▸BISWORK PERMIT APPLICATION142
03/30/2023123872087Open ↗
06/09/2021123750958Open ↗
05/27/2021123750958Open ↗
Showing 3 of 142 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications490
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION256
03/30/2020123599374Open ↗
03/30/2020123599374Open ↗
03/11/2020121241389Open ↗
Showing 3 of 256 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature65
10/05/2026M01393086-P1Open ↗
09/05/2026M00346664-I1Open ↗
09/04/2026M00336804-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature53
10/05/2026M01286342-I1Open ↗
10/05/2026M01286342-I1Open ↗
10/05/2026M01286342-P1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/30/2026M00216834-I1Open ↗
09/02/2026M08044077-P1Open ↗
08/29/2026M00804365-P3Open ↗
Showing 3 of 50 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
03/11/2020121241389Open ↗
01/02/2020123845553Open ↗
Showing 2 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT20
07/10/2020140921581Open ↗
03/11/2020121241389Open ↗
03/11/2020121241389Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/10/2020140921581Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment115
▸BISSELF-CERT PLUMBING NOTICE38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE30
08/15/2019123344997Open ↗
Showing 1 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
07/12/2022123002062Open ↗
06/16/2022123423330Open ↗
01/08/2021121734007Open ↗
Showing 3 of 14 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos147
▸BISASBESTOS: CERTIFICATION (DEP ACP5)62
07/10/2020140921581Open ↗
03/11/2020121241389Open ↗
01/02/2020123845553Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report55
09/05/2026M00346664-I1Open ↗
09/04/2026M00336804-I1Open ↗
09/03/2026M00519592-I1Open ↗
Showing 3 of 55 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance90
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS51
03/11/2020121241389Open ↗
03/11/2020121241389Open ↗
01/02/2020123845553Open ↗
Showing 3 of 51 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS21
04/30/2021123845553Open ↗
04/29/2021121241389Open ↗
01/21/2021123372778Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
07/20/2021123237595Open ↗
04/29/2021121241389Open ↗
04/29/2021121241389Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00519592-I1Open ↗
09/03/2026M00519979-I1Open ↗
Showing 2 of 3 on file for this type
▸BISLIGHTING CONTROLS1
05/19/2021140921581Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/19/2021140921581Open ↗
▸BISINTERIOR LIGHTING POWER1
05/19/2021140921581Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY31
07/20/2021123237595Open ↗
07/20/2021123237595Open ↗
07/20/2021123237595Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/19/2021140921581Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/19/2021140921581Open ↗
▸Approvals, Objections & Sign-offs179
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST67
07/28/2022123002062Open ↗
07/20/2021123237595Open ↗
07/14/2021123750958Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter59
10/05/2026M01286342-P1Open ↗
09/05/2026M00346664-I1Open ↗
09/03/2026M00519592-P1Open ↗
Showing 3 of 59 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
03/09/2020121241389Open ↗
01/02/2020123845553Open ↗
Showing 2 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER2
06/09/2021123750958Open ↗
05/27/2021123750958Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership147
▸BISCOST AFFIDAVIT142
07/20/2021123237595Open ↗
05/10/2021123237586Open ↗
04/30/2021123845553Open ↗
Showing 3 of 142 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/21/2025123872087Open ↗
09/16/2022123423330Open ↗
07/12/2022123002062Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms121
▸BISEFILING COVER SHEET77
03/11/2020121241389Open ↗
03/11/2020121241389Open ↗
01/02/2020123845553Open ↗
Showing 3 of 77 on file for this type
▸BISADDITIONAL INFORMATION22
05/05/2020123845553Open ↗
03/13/2020123750958Open ↗
03/05/2020123750958Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM20
03/30/2023123872087Open ↗
06/09/2021123750958Open ↗
05/27/2021123750958Open ↗
Showing 3 of 20 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents38
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations3
10/05/2026M01286342-P1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
10/05/2026M01286342-P1Open ↗
Showing 1 of 3 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type