← Back
Old law tenement
126 EAST 24 STREET
MANHATTAN · Gramercy · BIN 1018061
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
C6-2AZoning
28,397 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Old law tenement · Owner of record: SUPREME COMPANY I LLC · 7,692 sf lot · 3.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUPREME COMPANY I LLC803/22/2026
SUPREME COMPANY 1403/21/2026
SUPREME COMPANY ONE203/21/2026
BERDAR EQUITUES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MULLEN PALANDRANI ARCHITECTS512/20/2023
NEW YORK ENGINEERING ASSOC., P.C.107/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS303/21/2026
MPA203/21/2026
NEW YORK ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME CONSTRUCTION & RESTGeneral Contractor303/21/2026
REAZ MOHAMMEDElectrical203/21/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
CC CONTROLLED PLBG CO.,INPlumbing107/08/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
DEMETRIOS NIONAKISElectrical103/21/2026
ZARA PLUMBING CORPPlumbing107/08/2026
ARCH CONSTRUCTION CO.,INC.General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MULLEN PALANDRANI ARCHITE4786312/20/2023
RYAN SPECIAL ENGINEERING2018308/29/2023
NEW YORK ENGINEERING ASSO851107/25/2022
Building Lifecycle
All (58)Filed (6)Permit Issued (6)Signed Off (5)Violation (15)Inspection (4)Objection (6)Special Inspection (16)
04/01/2024
Signed off — Alteration
MINOR PLUMBING CONNECTION TO THE NEW TOILET, SINK AND DISHWASHER. MINOR GAS CONNECTION TO THE NEW GAS RANGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00896718-S1
04/01/2024
Signed off — Alteration
MINOR PLUMBING CONNECTION TO THE NEW TOILET, SINK AND DISHWASHER. MINOR GAS CONNECTION TO THE NEW GAS RANGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00896718-I1
03/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2023
Filed — Alteration
MINOR PLUMBING CONNECTION TO THE NEW TOILET, SINK AND DISHWASHER. MINOR GAS CONNECTION TO THE NEW GAS RANGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00896718-P1
12/18/2023
Permit issued — Plumbing
M00896718-S1-PL
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Mullen
12/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2023
Permit issued — General Construction
M00896718-I1-GC
09/12/2023
Objection raised — Admin
09/12/2023
Objection resolved — Addressed
09/12/2023
Objection raised — Scope
09/12/2023
Objection resolved — Addressed
09/12/2023
Objection raised — Admin
09/12/2023
Objection resolved — Addressed
08/29/2023
Filed — Alteration
MINOR PLUMBING CONNECTION TO THE NEW TOILET, SINK AND DISHWASHER. MINOR GAS CONNECTION TO THE NEW GAS RANGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00896718-S1
07/20/2023
Filed — Alteration
MINOR PLUMBING CONNECTION TO THE NEW TOILET, SINK AND DISHWASHER. MINOR GAS CONNECTION TO THE NEW GAS RANGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00896718-I1
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/27/2023
Special inspection requirement — Final
Peter Mullen
06/27/2023
Special inspection requirement — Lighting in dwelling units
Peter Mullen
06/27/2023
Special inspection requirement — Insulation placement and R values
Peter Mullen
02/13/2023
Signed off — Alteration
REPLACE BOILER AND REINSTALL EXISTING BURNER. REMOVE 4000 GALLON OIL TANK. JOB RUNNING ON GAS ONLY.
M00742853-I1
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2022
Violation issued (HPD, closed)
I
11/02/2022
Violation issued (HPD, closed)
I
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2022
Permit issued — Boiler Equipment
M00742853-I1-BE
07/25/2022
Filed — Alteration
REPLACE BOILER AND REINSTALL EXISTING BURNER. REMOVE 4000 GALLON OIL TANK. JOB RUNNING ON GAS ONLY.
M00742853-I1
05/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
05/23/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
05/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
05/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
05/23/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
02/15/2022
Violation issued (HPD, closed)
A
09/25/2020
Signed off — Alteration
Install new plumbing fixtures as per plans herewith. Construction plans to be filed separately.
M00212632-I1
09/18/2020
Signed off — Alteration
Install new inline centrifugal fan and 2 toilets exhaust grill.
M00212770-I1
03/02/2020
Permit issued — Mechanical Systems
M00212770-I1-MS
01/30/2020
Permit issued — Plumbing
M00212632-I1-PL
01/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2019
Permit issued — Plumbing
M00212632-I1-PL
09/09/2019
Filed — Alteration
Install new plumbing fixtures as per plans herewith. Construction plans to be filed separately.
M00212632-I1
09/09/2019
Filed — Alteration
Install new inline centrifugal fan and 2 toilets exhaust grill.
M00212770-I1
08/19/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Mullen
08/19/2019
Special inspection requirement — Mechanical Systems
Peter Mullen
08/19/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Mullen
08/19/2019
Special inspection requirement — Final
Peter Mullen
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC12/18/2023
DOB NOWGeneral ConstructionSigned-offPRIME CONSTRUCTION & REST10/16/2023
DOB NOWBoiler EquipmentSigned-offCC CONTROLLED PLBG CO.,IN07/29/2022
DOB NOWMechanical SystemsSigned-offARCH CONSTRUCTION CO.,INC03/02/2020
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING01/30/2020
DOB NOWPlumbingSigned-offWILLIAM GRAND09/26/2019
BIS—ISSUEDBALKAN CONSTRUCTION LLC11/09/2021
BISPLISSUEDMASTER 2 PLBG & HTG INC12/16/2020
BIS—ISSUEDBALKAN CONSTRUCTION LLC10/26/2020
BISOTISSUEDARCH CONSTRUCTION CO.,INC.09/19/2019
BIS—ISSUEDBALKAN CONSTRUCTION LLC08/27/2019
BIS—ISSUEDBALKAN CONSTRUCTION LLC05/30/2019
BIS—ISSUEDBALKAN CONSTRUCTION LLC03/08/2019
BISOTISSUEDC C CONTROLLED COMBUSTION07/25/2016
BISFBISSUEDC C CONTROLLED COMBUSTION07/22/2016
BISPLISSUEDADVANTAGE PLBG & MECH.COR06/22/2016
BISOTISSUEDARCH CONSTRUCTION CO.,INC.06/15/2016
BISPLISSUEDADVANTAGE PLBG & MECH.COR11/02/2015
BISMHISSUEDARCH CONSTRUCTION CO.,INC.11/02/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.10/28/2015
BISPLISSUEDCC CONTROLLED PLBG CO INC09/23/2015
BISOTISSUEDC C CONTROLLED COMBUSTION09/23/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR09/16/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR09/16/2015
BISMHISSUEDARCH CONSTRUCTION CO.,INC.09/10/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.09/10/2015
BISOTISSUEDARCH CONSTRUCTION CO. INC06/05/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR06/03/2015
BISMHISSUEDARCH CONSTRUCTION CO.,INC.05/15/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR05/08/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.05/05/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR03/17/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR03/17/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.03/11/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.03/11/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR02/11/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.02/03/2015
BISPLISSUEDADVANTAGE PLBG & MECH.COR01/23/2015
BISOTISSUEDARCH CONSTRUCTION CO.,INC.12/30/2014
BISMHISSUEDARCH CONSTRUCTION CO.,INC.12/02/2014
+ 16 more permits on file
4 projects · most recent 12/20/2024
General Wiring Boiler Controls
FiledStatusContractorScope
12/20/2024CompleteTHE METRO GROUP ELECTRIC10 meters, 10 new_meters
02/01/2024CompleteNION ELECTRIC CORPGeneral Wiring
01/04/2023Permit IssuedKRAFT ELECTRIC CORPBoiler Controls
03/24/2021CompleteFOCUS ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/18/2023Fire-Resistant Penetrations and JointsPeter Mullenspecial
12/18/2023Tenant Protection Plan Compliance—special
06/29/2023Tenant Protection Plan ComplianceWilliam Ryanspecial
06/27/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/27/2023FinalPeter Mullenprogress
06/27/2023Lighting in dwelling unitsPeter Mullenenergy_progress
06/27/2023Insulation placement and R valuesPeter Mullenenergy_progress
05/23/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
05/23/2022Heating SystemsLOUIS ARENAspecial
05/23/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
05/23/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
05/23/2022Maintenance informationLOUIS ARENAenergy_progress
08/19/2019Fire-Resistant Penetrations and JointsPeter Mullenspecial
08/19/2019Mechanical SystemsPeter Mullenspecial
08/19/2019Fire-Resistant Penetrations and JointsPeter Mullenspecial
08/19/2019FinalPeter Mullenprogress
▾Documents — 435 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/02/2026M00742853-I1Request digital key ↗
08/28/2026M00896718-P1Request digital key ↗
08/28/2026M00896718-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00212770-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00212632-I1Request digital key ↗
▸Applications & Permits84
▸BISWORK PERMIT APPLICATION49
12/18/2019123537020Open ↗
09/19/2019123818397Open ↗
08/28/2019123537020Open ↗
Showing 3 of 49 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION34
02/27/2026123537020Open ↗
03/14/2022123537020Open ↗
03/11/2022123537020Open ↗
Showing 3 of 34 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/20/2021123537020Open ↗
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
09/11/2019123818397Open ↗
03/08/2019123537020Open ↗
12/19/2018123537020Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00742853-I1Open ↗
09/02/2026M00212770-I1Open ↗
09/02/2026M00212770-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026M00896718-S1Open ↗
08/13/2026M00896718-I1Open ↗
08/13/2026M00212770-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M00742853-I1Open ↗
09/02/2026M00212770-I1Open ↗
08/28/2026M00896718-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/19/2018123537020Open ↗
12/19/2018123537020Open ↗
06/20/2016122713162Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/19/2018123537020Open ↗
06/20/2016122713162Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/22/2015140406317Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/22/2015140406317Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment42
▸BISSELF-CERT PLUMBING NOTICE19
01/04/2016122530083Open ↗
12/30/2015122469685Open ↗
12/21/2015122491446Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
12/19/2018123537020Open ↗
09/01/2016122713162Open ↗
06/20/2016122713162Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/22/2015140406317Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
06/08/2016140406317Open ↗
04/20/2016140406317Open ↗
04/18/2016140406317Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/25/2022123537020Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
09/11/2019123818397Open ↗
02/08/2019123537020Open ↗
06/20/2016122713162Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00212770-I1Open ↗
08/13/2026M00212632-I1Open ↗
▸BISSTREET TREE CHECKLIST1
12/19/2018123537020Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
09/11/2019123818397Open ↗
12/19/2018123537020Open ↗
06/20/2016122713162Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00742853-I1Open ↗
08/13/2026M00212632-I1Open ↗
08/13/2026M00212770-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00896718-I1Open ↗
08/13/2026M00896718-S1Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance66
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
09/11/2019123818397Open ↗
03/08/2019123537020Open ↗
12/19/2018123537020Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS17
02/05/2022123537020Open ↗
10/13/2020123818397Open ↗
05/24/2017122713162Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/05/2022123537020Open ↗
02/05/2022123537020Open ↗
02/05/2022123537020Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 2ND REVIEW1
06/05/2015122201599Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/22/2015140406317Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/25/2024123537020Open ↗
▸BISLIGHTING CONTROLS1
11/21/2024123537020Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/25/2024123537020Open ↗
▸BISINTERIOR LIGHTING POWER1
11/21/2024123537020Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00742853-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00742853-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/25/2024123537020Open ↗
11/25/2024123537020Open ↗
11/25/2024123537020Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/25/2024123537020Open ↗
▸BISMECHANICAL SYSTEMS1
11/25/2024123537020Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
10/13/2020123818397Open ↗
05/24/2017122713162Open ↗
04/12/2017140406317Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
02/27/2026123537020Open ↗
03/11/2022123537020Open ↗
03/01/2022123537020Open ↗
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT42
02/01/2022123537020Open ↗
10/13/2020123818397Open ↗
09/11/2019123818397Open ↗
Showing 3 of 42 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT13
06/20/2016122713162Open ↗
09/18/2015122491446Open ↗
09/18/2015122469685Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/18/2024123537020Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET20
09/11/2019123818397Open ↗
12/19/2018123537020Open ↗
12/19/2018123537020Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION13
06/17/2021123537020Open ↗
09/11/2019123818397Open ↗
12/19/2018123537020Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM1
10/10/2019104910401Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2015140406317Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/12/2017140406317Open ↗
04/12/2017140406317Open ↗
04/12/2017140406317Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
12/19/2018123537020Open ↗