| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00896718 ↗ | 126 EAST 24 STREET MANHATTAN | Alteration | Signed-off | 07/20/2023 | 12/18/2023 | Design MULLEN PALANDRANI ARCHITECTS Contractor ARIANA CONTRACTING INC | RENOVATE APT 1-D INCLUDING NEW PARTITION LAYOUT TO CREATE A THIRD BEDROOM. NEW KITCHEN CABINETS, APPLIANCES, AND FINISHES THROUGHOUT. NO CHA… |
| M00804316 ↗ | 213 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 01/09/2023 | 03/22/2023 | Design MULLEN PALANDRANI ARCHITECTS Owner First & 73 LLC Contractor PRIME CONSTRUCTION & REST | INTERIOR RENOVATION IN APT 2A. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00672357 ↗ | 657 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2022 | 05/03/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor MASTER 2 PLBG & HTG INC | Minor Renovation to 410sqft commercial space including: installation of a new floor slab, raised to a height to comply with handicap entranc… |
| M00662680 ↗ | 1306 1 AVENUE MANHATTAN | Alteration | Signed-off | 01/21/2022 | 01/27/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor ACCURATE MECH INDSTRS INC Filer MPA | RELOCATION OF BATHROOM AND 3 BATHROOM FIXTURES & INSTALL FIN TUBE HEATING AT DOOR TO TERRACE. |
| M00204890 ↗ | 135 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/03/2020 | 01/10/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor TARCON GENERAL CONTRACTIN | INSTALLATION HVAC SYSTEM WITH CONDENSING UNITS AT ROOF AND BATHROOM, KITCHEN AND DRYER EXHAUST AS INDICATED ON PLANS FILED HEREWITH. |
| M00571760 ↗ | 1306 1 AVENUE MANHATTAN | Alteration | Permit Issued | 11/02/2021 | 01/07/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor TARCON GENERAL CONTRACTIN Filer MPA | RE-CONFIGURE APT 2S TO PROVIDE TENANT ACCESS TO EXISTING 2ND FLOOR ACCESSORY PASSIVE RECREATION AREA. RE-LOCATE EXISTING EXHAUST DUCTWORK T… |
| Name | Projects together | Most recent |
|---|---|---|
| MULLEN PALANDRANI ARCHITECTS | 13 | 12/20/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| PRIME CONSTRUCTION & REST | 2 | 12/20/2023 |
| TARCON GENERAL CONTRACTIN | 2 | 11/02/2021 |
| ZARA PLUMBING CORP | 2 | 04/26/2021 |
| ACCURATE MECH INDSTRS INC | 1 | 01/21/2022 |
| ACCURATE MECHANICAL INC | 1 | 12/15/2021 |
| ARCH CONSTRUCTION CO.,INC | 1 | 09/09/2019 |
| ARIANA CONTRACTING INC | 1 | 12/20/2023 |
| EMPIRE MECHANICAL SVCS* | 1 | 03/18/2021 |
| MASTER 2 PLBG & HTG INC | 1 | 04/25/2022 |
| TIDAL PLUMBING & HTG LLC | 1 | 03/15/2021 |
| TOP DOG PLBG & HTG CORP | 1 | 10/08/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| First & 73 LLC | 1 | 01/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| MPA | 3 | 01/21/2022 |
| CLARKE CONSTRUCTION CONSULTANTS | 2 | 12/20/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00896718 ↗ | 126 EAST 24 STREET MANHATTAN | Alteration | Signed-off | 07/20/2023 | 12/18/2023 | Design MULLEN PALANDRANI ARCHITECTS Contractor ARIANA CONTRACTING INC | RENOVATE APT 1-D INCLUDING NEW PARTITION LAYOUT TO CREATE A THIRD BEDROOM. NEW KITCHEN CABINETS, APPLIANCES, AND FINISHES THROUGHOUT. NO CHA… |
| M00804316 ↗ | 213 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 01/09/2023 | 03/22/2023 | Design MULLEN PALANDRANI ARCHITECTS Owner First & 73 LLC Contractor PRIME CONSTRUCTION & REST | INTERIOR RENOVATION IN APT 2A. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00672357 ↗ | 657 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2022 | 05/03/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor MASTER 2 PLBG & HTG INC | Minor Renovation to 410sqft commercial space including: installation of a new floor slab, raised to a height to comply with handicap entranc… |
| M00662680 ↗ | 1306 1 AVENUE MANHATTAN | Alteration | Signed-off | 01/21/2022 | 01/27/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor ACCURATE MECH INDSTRS INC Filer MPA | RELOCATION OF BATHROOM AND 3 BATHROOM FIXTURES & INSTALL FIN TUBE HEATING AT DOOR TO TERRACE. |
| M00204890 ↗ | 135 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/03/2020 | 01/10/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor TARCON GENERAL CONTRACTIN | INSTALLATION HVAC SYSTEM WITH CONDENSING UNITS AT ROOF AND BATHROOM, KITCHEN AND DRYER EXHAUST AS INDICATED ON PLANS FILED HEREWITH. |
| M00571760 ↗ | 1306 1 AVENUE MANHATTAN | Alteration | Permit Issued | 11/02/2021 | 01/07/2022 | Design MULLEN PALANDRANI ARCHITECTS Contractor TARCON GENERAL CONTRACTIN Filer MPA | RE-CONFIGURE APT 2S TO PROVIDE TENANT ACCESS TO EXISTING 2ND FLOOR ACCESSORY PASSIVE RECREATION AREA. RE-LOCATE EXISTING EXHAUST DUCTWORK T… |
| M00203836 ↗ | 135 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 03/03/2020 | 09/27/2021 | Design MULLEN PALANDRANI ARCHITECTS Contractor ANTHONY DISABATO | Install new plumbing fixtures as per plans and in coordination with DOB Job# 123710243. |
| M00462430 ↗ | 310 EAST 19 STREET MANHATTAN | Alteration | Signed-off | 03/15/2021 | 06/29/2021 | Design MULLEN PALANDRANI ARCHITECTS Contractor TIDAL PLUMBING & HTG LLC | New Plumbing riser for cold water and hot water for 4 Clothes washers, waste stack for drainage of 4 laundry receptors. |
| M00463858 ↗ | 310 EAST 19 STREET MANHATTAN | Alteration | Signed-off | 03/18/2021 | 04/14/2021 | Design MULLEN PALANDRANI ARCHITECTS Contractor EMPIRE MECHANICAL SVCS* Filer MPA | Install mechanical exhaust system for 4 clothes dryers. |
| M00331616 ↗ | 310 EAST 19 STREET MANHATTAN | Alteration | Permit Issued | 09/18/2020 | 04/13/2021 | Design MULLEN PALANDRANI ARCHITECTS Contractor G.M.A. PLUMBING & HEATING Filer MPA | MODIFY PLUMBING RISER DIAGRAM TO RETAIN CERTAIN EXISTING PLUMBING FITTINGS |
| M00241165 ↗ | 257 WEST 39 STREET MANHATTAN | Alteration | Permit Issued | 10/08/2019 | 02/05/2021 | Design MULLEN PALANDRANI ARCHITECTS Contractor TOP DOG PLBG & HTG CORP | REMOVE 2 FIXTURES BATHROOM AT 7TH FL. (EAST) AND 7TH FL. (WEST), AND INSTALL (1) COMMERCIAL SINK AT 7TH FL. (EAST) AND (1) COMMERCIAL SINK A… |
| M00212770 ↗ | 126 EAST 24 STREET MANHATTAN | Alteration | Signed-off | 09/09/2019 | 03/02/2020 | Design MULLEN PALANDRANI ARCHITECTS Contractor ARCH CONSTRUCTION CO.,INC | Install new inline centrifugal fan and 2 toilets exhaust grill. |
| M00212632 ↗ | 126 EAST 24 STREET MANHATTAN | Alteration | Signed-off | 09/09/2019 | 01/30/2020 | Design MULLEN PALANDRANI ARCHITECTS Contractor WILLIAM GRAND | Install new plumbing fixtures as per plans herewith. Construction plans to be filed separately. |
| Building | Filings | Most Recent |
|---|---|---|
| 126 EAST 24 STREET ↗ | 3 | 12/20/2023 |
| 213 EAST 84 STREET ↗ | 1 | 01/09/2023 |
| 657 2 AVENUE ↗ | 2 | 04/25/2022 |
| 1306 1 AVENUE ↗ | 2 | 01/21/2022 |
| 135 CENTRAL PARK WEST ↗ | 5 | 12/15/2021 |
| 310 EAST 19 STREET ↗ | 5 | 04/26/2021 |
| 257 WEST 39 STREET ↗ | 1 | 10/08/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 12/18/2023 | Tenant Protection Plan Compliance | 126 EAST 24 STREET | — | special |
| 12/18/2023 | Fire-Resistant Penetrations and Joints | 126 EAST 24 STREET | Peter Mullen | special |
| 12/27/2022 | Insulation placement and R values | 213 EAST 84 STREET | Peter Mullen | energy_progress |
| 12/27/2022 | Lighting in dwelling units | 213 EAST 84 STREET | Peter Mullen | energy_progress |
| 12/26/2022 | Final | 213 EAST 84 STREET | Peter Mullen | progress |
| 12/26/2022 | Energy Code Compliance Inspections | 213 EAST 84 STREET | Peter Mullen | progress |
| 12/26/2022 | Fire-Resistant Penetrations and Joints | 213 EAST 84 STREET | Peter Mullen | special |
| 04/21/2022 | Fire-Resistant Penetrations and Joints | 657 2 AVENUE | Peter Mullen | special |
| 04/21/2022 | Energy Code Compliance Inspections | 657 2 AVENUE | Peter Mullen | progress |
| 12/16/2021 | Energy Code Compliance Inspections | 135 CENTRAL PARK WEST | Peter Mullen | progress |
| 12/16/2021 | Fire-Resistant Penetrations and Joints | 135 CENTRAL PARK WEST | Peter Mullen | special |
| 08/09/2021 | Lighting controls | 1306 1 AVENUE | Peter Mullen | energy_progress |
| 08/09/2021 | Interior lighting power | 1306 1 AVENUE | Peter Mullen | energy_progress |
| 08/09/2021 | Fire-Resistance Rated Construction | 1306 1 AVENUE | Peter Mullen | progress |
| 08/09/2021 | Energy Code Compliance Inspections | 1306 1 AVENUE | Peter Mullen | progress |
| 08/09/2021 | Fire-Resistant Penetrations and Joints | 1306 1 AVENUE | Peter Mullen | special |
| 08/05/2021 | Final | 1306 1 AVENUE | Peter Mullen | progress |
| 08/05/2021 | Mechanical Systems | 1306 1 AVENUE | Peter Mullen | special |
| 04/29/2021 | HVAC insulation and sealing | 310 EAST 19 STREET | Peter Mullen | energy_progress |
| 04/29/2021 | Fire-Resistant Penetrations and Joints | 310 EAST 19 STREET | Peter Mullen | special |
| 02/10/2021 | Duct leakage testing, insulation and design | 310 EAST 19 STREET | Peter Mullen | energy_progress |
| 02/01/2021 | Final | 310 EAST 19 STREET | Peter Mullen | progress |
| 02/01/2021 | Mechanical Systems | 310 EAST 19 STREET | Peter Mullen | special |
| 12/24/2020 | Fire-Resistant Penetrations and Joints | 135 CENTRAL PARK WEST | Peter Mullen | special |
| 10/06/2019 | Fire-Resistant Penetrations and Joints | 257 WEST 39 STREET | Peter Mullen | special |
| 10/06/2019 | Energy Code Compliance Inspections | 257 WEST 39 STREET | Peter Mullen | progress |
| 08/19/2019 | Fire-Resistant Penetrations and Joints | 126 EAST 24 STREET | Peter Mullen | special |
| 08/19/2019 | Fire-Resistant Penetrations and Joints | 126 EAST 24 STREET | Peter Mullen | special |
| 08/19/2019 | Final | 126 EAST 24 STREET | Peter Mullen | progress |
| 08/19/2019 | Mechanical Systems | 126 EAST 24 STREET | Peter Mullen | special |
| 08/05/2019 | Energy Code Compliance Inspections | 135 CENTRAL PARK WEST | William Ryan | progress |
| 08/03/2019 | HVAC and service water heating system controls | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | Mechanical Systems | 135 CENTRAL PARK WEST | William Ryan | special |
| 08/03/2019 | Fire-Resistant Penetrations and Joints | 135 CENTRAL PARK WEST | Peter Mullen | special |
| 08/03/2019 | Final | 135 CENTRAL PARK WEST | Peter Mullen | progress |
| 08/03/2019 | Duct leakage testing | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | HVAC insulation and sealing | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | HVAC and service water heating equipment | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | Permanent certificate | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | Maintenance information | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | Electrical motors | 135 CENTRAL PARK WEST | William Ryan | energy_progress |
| 08/03/2019 | Shutoff dampers | 135 CENTRAL PARK WEST | William Ryan | energy_progress |