← Back
Special Inspection Agency
MULLEN PALANDRANI ARCHITE
Special Inspection Agency
3 projects with open permitsMANHATTAN · 13
7 buildings
19
Total Filings
13
Projects on File
7
Buildings Worked
3
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month13 projects all-time
0123Sep '19 · 2Oct '19 · 1Mar '20 · 2Sep '20 · 1Mar '21 · 2Nov '21 · 1Jan '22 · 1Feb '22 · 1Jan '23 · 1Jul '23 · 12020202120222023
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit323%
Signed off1077%
By project type
Alteration13
Most active buildings
All buildings →
126 EAST 24 STREETMANHATTAN · latest 12/18/2023
3 projects
310 EAST 19 STREETMANHATTAN · 1 open · latest 06/29/2021
3 projects
135 CENTRAL PARK WESTMANHATTAN · latest 01/10/2022
2 projects
1306 1 AVENUEMANHATTAN · 1 open · latest 01/27/2022
2 projects
257 WEST 39 STREETMANHATTAN · 1 open · latest 02/05/2021
1 projects
657 2 AVENUEMANHATTAN · latest 05/03/2022
1 projects
Key relationships
Everyone →
Design firms
Filing representatives
Owners
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00896718 ↗126 EAST 24 STREET
MANHATTAN
AlterationSigned-off07/20/202312/18/2023RENOVATE APT 1-D INCLUDING NEW PARTITION LAYOUT TO CREATE A THIRD BEDROOM. NEW KITCHEN CABINETS, APPLIANCES, AND FINISHES THROUGHOUT. NO CHA…
M00804316 ↗213 EAST 84 STREET
MANHATTAN
AlterationSigned-off01/09/202303/22/2023INTERIOR RENOVATION IN APT 2A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00672357 ↗657 2 AVENUE
MANHATTAN
AlterationSigned-off02/11/202205/03/2022Minor Renovation to 410sqft commercial space including: installation of a new floor slab, raised to a height to comply with handicap entranc…
M00662680 ↗1306 1 AVENUE
MANHATTAN
AlterationSigned-off01/21/202201/27/2022
Filer MPA
RELOCATION OF BATHROOM AND 3 BATHROOM FIXTURES & INSTALL FIN TUBE HEATING AT DOOR TO TERRACE.
M00204890 ↗135 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off03/03/202001/10/2022INSTALLATION HVAC SYSTEM WITH CONDENSING UNITS AT ROOF AND BATHROOM, KITCHEN AND DRYER EXHAUST AS INDICATED ON PLANS FILED HEREWITH.
M00571760 ↗1306 1 AVENUE
MANHATTAN
AlterationPermit Issued11/02/202101/07/2022
Filer MPA
RE-CONFIGURE APT 2S TO PROVIDE TENANT ACCESS TO EXISTING 2ND FLOOR ACCESSORY PASSIVE RECREATION AREA. RE-LOCATE EXISTING EXHAUST DUCTWORK T…
Counts cover all 13 projects (13 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MULLEN PALANDRANI ARCHITECTS1312/20/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PRIME CONSTRUCTION & REST212/20/2023
TARCON GENERAL CONTRACTIN211/02/2021
ZARA PLUMBING CORP204/26/2021
ACCURATE MECH INDSTRS INC101/21/2022
ACCURATE MECHANICAL INC112/15/2021
ARCH CONSTRUCTION CO.,INC109/09/2019
ARIANA CONTRACTING INC112/20/2023
EMPIRE MECHANICAL SVCS*103/18/2021
MASTER 2 PLBG & HTG INC104/25/2022
TIDAL PLUMBING & HTG LLC103/15/2021
TOP DOG PLBG & HTG CORP110/08/2019
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
First & 73 LLC101/09/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MPA301/21/2022
CLARKE CONSTRUCTION CONSULTANTS212/20/2023
13 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 13Open permit 3Signed off 10
13 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M00896718 ↗126 EAST 24 STREET
MANHATTAN
AlterationSigned-off07/20/202312/18/2023RENOVATE APT 1-D INCLUDING NEW PARTITION LAYOUT TO CREATE A THIRD BEDROOM. NEW KITCHEN CABINETS, APPLIANCES, AND FINISHES THROUGHOUT. NO CHA…
M00804316 ↗213 EAST 84 STREET
MANHATTAN
AlterationSigned-off01/09/202303/22/2023INTERIOR RENOVATION IN APT 2A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00672357 ↗657 2 AVENUE
MANHATTAN
AlterationSigned-off02/11/202205/03/2022Minor Renovation to 410sqft commercial space including: installation of a new floor slab, raised to a height to comply with handicap entranc…
M00662680 ↗1306 1 AVENUE
MANHATTAN
AlterationSigned-off01/21/202201/27/2022
Filer MPA
RELOCATION OF BATHROOM AND 3 BATHROOM FIXTURES & INSTALL FIN TUBE HEATING AT DOOR TO TERRACE.
M00204890 ↗135 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off03/03/202001/10/2022INSTALLATION HVAC SYSTEM WITH CONDENSING UNITS AT ROOF AND BATHROOM, KITCHEN AND DRYER EXHAUST AS INDICATED ON PLANS FILED HEREWITH.
M00571760 ↗1306 1 AVENUE
MANHATTAN
AlterationPermit Issued11/02/202101/07/2022
Filer MPA
RE-CONFIGURE APT 2S TO PROVIDE TENANT ACCESS TO EXISTING 2ND FLOOR ACCESSORY PASSIVE RECREATION AREA. RE-LOCATE EXISTING EXHAUST DUCTWORK T…
M00203836 ↗135 CENTRAL PARK WEST
MANHATTAN
AlterationSigned-off03/03/202009/27/2021
Contractor ANTHONY DISABATO
Install new plumbing fixtures as per plans and in coordination with DOB Job# 123710243.
M00462430 ↗310 EAST 19 STREET
MANHATTAN
AlterationSigned-off03/15/202106/29/2021New Plumbing riser for cold water and hot water for 4 Clothes washers, waste stack for drainage of 4 laundry receptors.
M00463858 ↗310 EAST 19 STREET
MANHATTAN
AlterationSigned-off03/18/202104/14/2021
Filer MPA
Install mechanical exhaust system for 4 clothes dryers.
M00331616 ↗310 EAST 19 STREET
MANHATTAN
AlterationPermit Issued09/18/202004/13/2021
Filer MPA
MODIFY PLUMBING RISER DIAGRAM TO RETAIN CERTAIN EXISTING PLUMBING FITTINGS
M00241165 ↗257 WEST 39 STREET
MANHATTAN
AlterationPermit Issued10/08/201902/05/2021REMOVE 2 FIXTURES BATHROOM AT 7TH FL. (EAST) AND 7TH FL. (WEST), AND INSTALL (1) COMMERCIAL SINK AT 7TH FL. (EAST) AND (1) COMMERCIAL SINK A…
M00212770 ↗126 EAST 24 STREET
MANHATTAN
AlterationSigned-off09/09/201903/02/2020Install new inline centrifugal fan and 2 toilets exhaust grill.
M00212632 ↗126 EAST 24 STREET
MANHATTAN
AlterationSigned-off09/09/201901/30/2020
Contractor WILLIAM GRAND
Install new plumbing fixtures as per plans herewith. Construction plans to be filed separately.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
126 EAST 24 STREET ↗312/20/2023
213 EAST 84 STREET ↗101/09/2023
657 2 AVENUE ↗204/25/2022
1306 1 AVENUE ↗201/21/2022
135 CENTRAL PARK WEST ↗512/15/2021
310 EAST 19 STREET ↗504/26/2021
257 WEST 39 STREET ↗110/08/2019
▾Special Inspection Requirements — 42
DateRequirementBuildingInspectorRole
12/18/2023Tenant Protection Plan Compliance126 EAST 24 STREET—special
12/18/2023Fire-Resistant Penetrations and Joints126 EAST 24 STREETPeter Mullenspecial
12/27/2022Insulation placement and R values213 EAST 84 STREETPeter Mullenenergy_progress
12/27/2022Lighting in dwelling units213 EAST 84 STREETPeter Mullenenergy_progress
12/26/2022Final213 EAST 84 STREETPeter Mullenprogress
12/26/2022Energy Code Compliance Inspections213 EAST 84 STREETPeter Mullenprogress
12/26/2022Fire-Resistant Penetrations and Joints213 EAST 84 STREETPeter Mullenspecial
04/21/2022Fire-Resistant Penetrations and Joints657 2 AVENUEPeter Mullenspecial
04/21/2022Energy Code Compliance Inspections657 2 AVENUEPeter Mullenprogress
12/16/2021Energy Code Compliance Inspections135 CENTRAL PARK WESTPeter Mullenprogress
12/16/2021Fire-Resistant Penetrations and Joints135 CENTRAL PARK WESTPeter Mullenspecial
08/09/2021Lighting controls1306 1 AVENUEPeter Mullenenergy_progress
08/09/2021Interior lighting power1306 1 AVENUEPeter Mullenenergy_progress
08/09/2021Fire-Resistance Rated Construction1306 1 AVENUEPeter Mullenprogress
08/09/2021Energy Code Compliance Inspections1306 1 AVENUEPeter Mullenprogress
08/09/2021Fire-Resistant Penetrations and Joints1306 1 AVENUEPeter Mullenspecial
08/05/2021Final1306 1 AVENUEPeter Mullenprogress
08/05/2021Mechanical Systems1306 1 AVENUEPeter Mullenspecial
04/29/2021HVAC insulation and sealing 310 EAST 19 STREETPeter Mullenenergy_progress
04/29/2021Fire-Resistant Penetrations and Joints310 EAST 19 STREETPeter Mullenspecial
02/10/2021Duct leakage testing, insulation and design310 EAST 19 STREETPeter Mullenenergy_progress
02/01/2021Final310 EAST 19 STREETPeter Mullenprogress
02/01/2021Mechanical Systems310 EAST 19 STREETPeter Mullenspecial
12/24/2020Fire-Resistant Penetrations and Joints135 CENTRAL PARK WESTPeter Mullenspecial
10/06/2019Fire-Resistant Penetrations and Joints257 WEST 39 STREETPeter Mullenspecial
10/06/2019Energy Code Compliance Inspections257 WEST 39 STREETPeter Mullenprogress
08/19/2019Fire-Resistant Penetrations and Joints126 EAST 24 STREETPeter Mullenspecial
08/19/2019Fire-Resistant Penetrations and Joints126 EAST 24 STREETPeter Mullenspecial
08/19/2019Final126 EAST 24 STREETPeter Mullenprogress
08/19/2019Mechanical Systems126 EAST 24 STREETPeter Mullenspecial
08/05/2019Energy Code Compliance Inspections135 CENTRAL PARK WESTWilliam Ryanprogress
08/03/2019HVAC and service water heating system controls 135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019Mechanical Systems135 CENTRAL PARK WESTWilliam Ryanspecial
08/03/2019Fire-Resistant Penetrations and Joints135 CENTRAL PARK WESTPeter Mullenspecial
08/03/2019Final135 CENTRAL PARK WESTPeter Mullenprogress
08/03/2019Duct leakage testing 135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019HVAC insulation and sealing 135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019HVAC and service water heating equipment 135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019Permanent certificate135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019Maintenance information135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019Electrical motors135 CENTRAL PARK WESTWilliam Ryanenergy_progress
08/03/2019Shutoff dampers135 CENTRAL PARK WESTWilliam Ryanenergy_progress
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch - Plumbing9
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch8
09/03/2026M00662680-I1 · 1306 1 AVENUERequest digital key ↗
09/02/2026M00672357-P1 · 657 2 AVENUERequest digital key ↗
09/02/2026M00672357-I1 · 657 2 AVENUERequest digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
▸DOB NOWPlans/Sketch - Plumbing Legalization1
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
09/05/2026M00204890-I1 · 135 CENTRAL PARK WESTOpen ↗
08/13/2026M00203836-I1 · 135 CENTRAL PARK WESTOpen ↗
08/13/2026M00203836-P3 · 135 CENTRAL PARK WESTOpen ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature29
09/05/2026M00331616-I1 · 310 EAST 19 STREETOpen ↗
09/02/2026M00212770-I1 · 126 EAST 24 STREETOpen ↗
08/31/2026M00804316-I1 · 213 EAST 84 STREETOpen ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00204890-I1 · 135 CENTRAL PARK WESTOpen ↗
09/04/2026M00331616-I1 · 310 EAST 19 STREETOpen ↗
09/04/2026M00331616-P2 · 310 EAST 19 STREETOpen ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/05/2026M00331616-I1 · 310 EAST 19 STREETOpen ↗
09/02/2026M00212770-I1 · 126 EAST 24 STREETOpen ↗
09/02/2026M00212770-I1 · 126 EAST 24 STREETOpen ↗
Showing 3 of 17 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan10
09/05/2026M00204890-I1 · 135 CENTRAL PARK WESTOpen ↗
08/13/2026M00331616-P2 · 310 EAST 19 STREETOpen ↗
08/13/2026M00331616-P1 · 310 EAST 19 STREETOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026M00241165-I1 · 257 WEST 39 STREETOpen ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/05/2026M00204890-I1 · 135 CENTRAL PARK WESTOpen ↗
09/04/2026M00331616-P1 · 310 EAST 19 STREETOpen ↗
09/04/2026M00331616-I1 · 310 EAST 19 STREETOpen ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00896718-S1 · 126 EAST 24 STREETOpen ↗
08/13/2026M00896718-I1 · 126 EAST 24 STREETOpen ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.5
09/05/2026M00204890-I1 · 135 CENTRAL PARK WESTOpen ↗
08/13/2026M00463858-I1 · 310 EAST 19 STREETOpen ↗
08/13/2026M00571760-I1 · 1306 1 AVENUEOpen ↗
Showing 3 of 5 on file for this type