← Back
BuildNYC
Home for indigent children, aged, homeless
Vista on 5th
1261 5TH AVENUE · BIN 1085970
💬 Discuss this project
1998Year Built
14Stories
N2Building Class
R9Zoning
130,000 sfGross Floor Area
127Units
LL97 CoveredRent Stabilized8 Active Violations 6 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Home for indigent children, aged, homeless · 11,101 sf lot · 11.71 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade restoration work1 filing
RoofSprint1p · 2 filings · 20 docs
Floor 1Sprint1p · 1 filing · 3 docs
CellarVista On 5th CORP.1p · 1 filing · 20 docs
Site & exteriorSidewalk shed installation2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vista on 5th1410/06/2026
G.A. Windows, Inc. D/B/A/ Adler Win703/22/2026
SFDS Development503/21/2026
All Saints Housing403/21/2026
Lott Community Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADS & Y410/05/2026
Bitopi Consultants107/31/2023
Arquitectura Varela105/25/2023
Scherer Design Group101/29/2020
Baileys Engineering104/10/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
AK Consulting Services203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hydrotac ServicesPlumbing610/04/2026
Everest ScaffoldingScaffold403/21/2026
Access Solutions GroupScaffold203/21/2026
Associated Electric Cont of NElectrical203/21/2026
Dziekan KazimierzGeneral Contractor103/21/2026
K & R Electric CoElectrical103/21/2026
Valntino ConstructionGeneral Contractor107/08/2026
Classic Consulting GroupScaffold107/08/2026
Hydrotac ServicesGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADS & Y3783206/15/2026
Howard L Zimmerman Architects1712107/31/2023
Scherer Design Group6303101/29/2020
Building Lifecycle
All (123)Filed (8)Permit Issued (11)Signed Off (2)Facade (FISP) (11)Violation (60)Inspection (3)Objection (10)Special Inspection (18)
10/05/2026
Filed — Alteration
REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01206858-P4
10/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/15/2026
Filed — Alteration
REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01206858-P1
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — Maintenance information
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — Heating Systems
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
SIDERIS CARAMINTZOS
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — Maintenance information
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — Heating Systems
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SIDERIS CARAMINTZOS
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SIDERIS CARAMINTZOS
06/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/18/2026
Permit issued — Boiler Equipment
M01206858-I1-BE
05/18/2026
Permit issued — Plumbing
M01206858-S1-PL
11/04/2025
Violation issued (HPD, open)
B
11/04/2025
Violation issued (HPD, open)
B
09/11/2025
Permit issued — Plumbing
M01206858-S1-PL
09/11/2025
Permit issued — Boiler Equipment
M01206858-I1-BE
04/23/2025
Permit issued — Plumbing
M01206858-S1-PL
04/23/2025
Permit issued — Boiler Equipment
M01206858-I1-BE
04/18/2025
Filed — Alteration
REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01206858-S1
04/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
SIDERIS CARAMINTZOS
04/11/2025
Filed — Alteration
REPLACE GAS PIPING FROM THE LADWIG VALVE TO THE (NEW) REPLACED BOILER 3 (B3). BOILER WORK TYPE FOR B3 WAS FILED UNDER JOB # M01206858-I1. NO CHANGE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01206858-I1
02/06/2025
Violation issued (HPD, open)
C
01/11/2025
Violation issued (HPD, closed)
C
11/22/2024
Violation issued (HPD, closed)
I
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
C
05/26/2024
Cycle 9 facade report signed — SAFE
02/20/2024
Cycle 9 facade report submitted
02/12/2024
Cycle 9 facade inspection completed
01/26/2024
Signed off — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00893519-I1
01/23/2024
Violation issued (HPD, open)
C
10/13/2023
Permit issued — General Construction
M00893519-I1-GC
08/01/2023
Permit issued — Sidewalk Shed
M00881211-I1-SH
07/31/2023
Filed — Alteration
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00893519-I1
05/26/2023
Permit issued — Sidewalk Shed
M00881211-I1-SH
05/25/2023
Filed — Alteration
M00881211-I1
11/10/2022
Violation issued (ECB, open)
Local Law
03/08/2022
Violation issued (HPD, closed)
A
04/19/2021
Violation issued (HPD, closed)
A
09/29/2020
Cycle 8 facade report submitted
08/13/2020
Cycle 8 facade inspection completed
04/14/2020
Violation issued (ECB, open)
Local Law
01/30/2020
Objection raised — 1998-AN AC 28-103.14.1-TPPN-98
01/30/2020
Objection resolved — Addressed
01/30/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
01/30/2020
Objection resolved — Addressed
01/30/2020
Objection raised — 1998-AN BC 501.3-Building Code
01/30/2020
Objection resolved — Addressed
01/30/2020
Objection raised — 2014-AN BC 1704-Building Code-
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offHydrotac Services05/18/2026
DOB NOWPlumbingPermit IssuedHydrotac Services05/18/2026
DOB NOWPlumbingPermit IssuedTorr Mechanical09/11/2025
DOB NOWBoiler EquipmentSigned-offTorr Mechanical09/11/2025
DOB NOWPlumbingPermit IssuedTorr Mechanical04/23/2025
DOB NOWBoiler EquipmentSigned-offHydrotac Services04/23/2025
DOB NOWGeneral ConstructionSigned-offValntino Construction10/13/2023
DOB NOWSidewalk ShedPermit IssuedAccess Solutions Group08/01/2023
DOB NOWSidewalk ShedPermit IssuedClassic Consulting Group05/26/2023
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/26/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/11/2018
BISOTISSUEDAdler Windows05/10/2018
BISOTISSUEDThe Metro Group03/08/2018
BISPLISSUEDNational Mechanical Services Plumbing02/13/2018
BISPLISSUEDTPC II Contractors09/19/2012
BISEQISSUEDSteel Industries12/01/2011
BISPLISSUEDTPC II Contractors09/13/2011
BISOTISSUEDNew Life Mason & Water08/23/2011
BISEQISSUEDSteel Insustries12/23/2010
BISPLISSUEDTPC II Contractors08/31/2010
BISOTISSUEDFrank Corigliano Contracting02/19/2002
BIS—ISSUEDFrank Corigliano Contractor08/24/2000
BISSPISSUEDConnor Managemnet Group06/13/2000
BISPLISSUEDBlau Mechnl01/20/2000
BISEQISSUEDFrank Corigliano Contractor11/22/1999
BISFPISSUEDFire Command Ico11/12/1999
BISEQISSUEDFrank Corigliano Contractor08/10/1999
BIS—ISSUEDFrank Corigliano Contractor08/10/1999
BISEQISSUEDUnited Hoisting Co04/20/1999
BISEQISSUEDUnited Hoisting Co04/02/1999
BISEQISSUEDUnited Hoisting Co04/02/1999
BISSDISSUEDConnor Managemnet Group03/22/1999
BISEQISSUEDUnited Hoisting03/09/1999
BISEQISSUEDUnited Hoisting Co03/09/1999
BISPLISSUEDBlau Mechnl01/22/1999
BISEQISSUEDFrank Corigliano Contractor12/23/1998
BIS—ISSUEDFrank Corigliano Contractor09/17/1998
BISEQISSUEDFrank Corigliano Contractor09/17/1998
1 project · most recent 10/05/2026
Gas
FiledStatusContractorScope
10/05/2026Signed-offHydrotac ServicesGas
5 projects · most recent 06/24/2023
General Wiring
FiledStatusContractorScope
06/24/2023Permit IssuedRichard Neu—
06/13/2023CompleteE-J Electric Installation CoGeneral Wiring
06/08/2023CompleteE-J Electric Installation CoGeneral Wiring
06/29/2022CompleteBig City Electrical SolutionsGeneral Wiring
04/06/2018CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/05/2026Tenant Protection Plan Compliance—special
09/30/2026Tenant Protection Plan Compliance—special
06/15/2026HVAC-R and service water heating equipmentSIDERIS CARAMINTZOSenergy_progress
06/15/2026HVAC-R and service water heating system controlsSIDERIS CARAMINTZOSenergy_progress
06/15/2026HVAC-R and service water piping design and insulationSIDERIS CARAMINTZOSenergy_progress
06/15/2026Maintenance informationSIDERIS CARAMINTZOSenergy_progress
06/15/2026Heating SystemsSIDERIS CARAMINTZOSspecial
06/15/2026Tenant Protection Plan ComplianceSIDERIS CARAMINTZOSspecial
06/15/2026Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
06/12/2026Maintenance informationSIDERIS CARAMINTZOSenergy_progress
06/12/2026HVAC-R and service water piping design and insulationSIDERIS CARAMINTZOSenergy_progress
06/12/2026HVAC-R and service water heating system controlsSIDERIS CARAMINTZOSenergy_progress
06/12/2026Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
06/12/2026Heating SystemsSIDERIS CARAMINTZOSspecial
06/12/2026Tenant Protection Plan ComplianceSIDERIS CARAMINTZOSspecial
06/12/2026HVAC-R and service water heating equipmentSIDERIS CARAMINTZOSenergy_progress
04/17/2025Tenant Protection Plan ComplianceSIDERIS CARAMINTZOSspecial
04/09/2018FinalPAUL BAILEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SprintTelecom siteFloor 1, Roof
Project M00292139 Alteration · Approved · 01/29/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/06/2026M00033549-I1Request digital key ↗
08/31/2026M00881211-I1Request digital key ↗
08/29/2026M00893519-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00292139-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION15
05/11/2018123193631Open ↗
03/09/2018123193640Open ↗
03/08/2018123193640Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
01/24/2018123193631Open ↗
01/24/2018123193640Open ↗
10/12/2012120390576Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
05/11/2018123193631Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026M00033549-I1Open ↗
08/25/2026M01206858-I1Open ↗
08/25/2026M01206858-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01206858-I1Open ↗
09/23/2026M01206858-I1Open ↗
09/23/2026M01206858-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00033549-I1Open ↗
09/05/2026M00292139-I1Open ↗
08/31/2026M00881211-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/25/2011120784552Open ↗
01/03/2011120565780Open ↗
08/16/2010120436849Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/25/2011120784552Open ↗
01/03/2011120565780Open ↗
08/16/2010120436849Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
12/20/2012120390576Open ↗
11/28/2012120390576Open ↗
11/28/2012120390576Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/12/2012120390576Open ↗
06/24/2010120390576Open ↗
06/24/2010120390576Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/24/2018123193640Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
01/24/2018123193640Open ↗
08/25/2011120784552Open ↗
▸BISTenant Protection Plan and Notes1
01/24/2018123193631Open ↗
▸DOB NOWTenant Protection Plan1
08/15/2026M00292139-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
01/03/2011120565780Open ↗
08/16/2010120436849Open ↗
06/24/2010120390576Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
08/25/2011120784552Open ↗
12/07/2007110037059Open ↗
12/06/2007110037059Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
05/11/2018123193631Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
12/30/2013120436849Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/25/2011120784552Open ↗
01/03/2011120565780Open ↗
08/16/2010120436849Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/24/2026M01206858-P1Open ↗
08/13/2026M00881211-I1Open ↗
08/13/2026M01206858-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/27/2012120784552Open ↗
▸BISSHED LETTER1
01/23/2012120565780Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
01/24/2018123193631Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
01/24/2018123193631Open ↗
01/24/2018123193640Open ↗
08/25/2011120784552Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/01/2019123193631Open ↗
03/01/2019123193640Open ↗
02/14/2018123193640Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/09/2011120390576Open ↗
08/09/2011120390576Open ↗
08/09/2011120390576Open ↗
Showing 3 of 4 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
01/24/2018123193640Open ↗