← Back
BuildNYC
Gas or electric utility
127-11 FARMERS BOULEVARD
QUEENS · St. Albans · BIN 4594611
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Gas or electric utility · Owner of record: Brooklyn Union Gas Company · 127,346 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNational GridUnder Construction28p · 5 filings · 16 docs
Floor 1National Grid, National Grid Jamaica Training CenterUnder Construction57p · 13 filings · 12 docs
MezzanineNational Grid1 filing · 12 docs
CellarNational Grid Jamaica Training Center, National Grid4p · 2 filings · 12 docs
Site & exteriorNational Grid, National Grid Jamaica Training CenterUnder Construction2p · 3 filings · 9 docs
Filed — no permit issued1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
National Grid4410/16/2026
Brooklyn Union Gas Co403/21/2026
Keyspan Energy Co303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA Design Group803/21/2026
Tower503/21/2026
KM Associates of New York503/21/2026
Milrose Consultants203/21/2026
Meridian Code Consultants203/21/2026
K & M Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Matco ServiceGeneral Contractor403/21/2026
Clune Construction CoGeneral Contractor408/16/2026
Par Plumbing CoPlumbing307/08/2026
R.W. Dake & CoGeneral Contractor304/09/2026
Abco-Peerless SprinklerFire Protection207/08/2026
Cross Check MechanicalPlumbing206/28/2026
James E FitzgeraldGeneral Contractor208/14/2026
H.M. Hughes CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tower Consulting Engineering7310310/15/2026
Goldman Copeland Associates2826303/09/2026
All City Engineering7115512/11/2025
AK Engineering678410/28/2025
Crosscheck Inspection Services544204/28/2022
Building Lifecycle
All (208)Filed (33)Permit Issued (19)Signed Off (5)Violation (46)Inspection (8)Objection (67)Special Inspection (30)
10/15/2026
Filed — New Building
new curb cut
Q01327543-P1
09/23/2026
Objection resolved — Resolved
09/17/2026
Filed — Alteration
Q01404980-I1
08/24/2026
Objection raised — Other
08/14/2026
Permit issued — General Construction
Q01331579-I1-GC
08/13/2026
Permit issued — General Construction
Q01360798-I1-GC
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/04/2026
Objection raised — Other
07/28/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/09/2026
Filed — Alteration
Q01360798-I1
07/08/2026
Objection resolved — Addressed
07/08/2026
Objection resolved — Addressed
06/25/2026
Special inspection requirement — Post-installed Anchors
HAMZA MURTAZA
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/14/2026
Special inspection requirement — Maintenance information
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/06/2026
Permit issued — General Construction
Q01265396-I1-GC
05/06/2026
Special inspection requirement — Sprinkler Systems
DANIEL COLOMBINI
05/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/29/2026
Permit issued — Sprinklers
Q01157571-I1-EW-SP
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Objection raised — Other
04/21/2026
Filed — New Building
new curb cut
Q01327543-S9
04/21/2026
Filed — New Building
new curb cut
Q01327543-Z1
04/21/2026
Objection raised — Admin
04/21/2026
Objection raised — Admin
04/21/2026
Objection raised — Admin
04/15/2026
Objection raised — Admin
04/15/2026
Objection raised — Admin
04/15/2026
Objection raised — Plumbing
04/15/2026
Objection raised — Scope
04/15/2026
Objection raised — Admin
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/14/2026
Objection raised — Plumbing
04/14/2026
Objection raised — Admin
04/14/2026
Objection raised — Other
04/14/2026
Objection raised — Plumbing
04/14/2026
Special inspection requirement — Final
Robert Pompo
04/13/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR THE INSTALLATION OF EV CHARGING STATIONS, INCLUDING CONDUIT RUNS, FOUNDATIONS, BOLLARDS, AND ASSOCIATED SITE WORK, AS PER DRAWINGS FILED HEREWITH.
Q01331579-P1
04/10/2026
Special inspection requirement — Final
Robert Pompo
04/01/2026
Filed — New Building
new curb cut
Q01327543-S6
04/01/2026
Special inspection requirement — Protection of exposed foundation insulation
04/01/2026
Special inspection requirement — Air barrier continuity plan testing
04/01/2026
Special inspection requirement — Structural Cold-Formed Steel
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedClune Construction Co08/14/2026
DOB NOWGeneral ConstructionPermit IssuedJames E Fitzgerald08/13/2026
DOB NOWGeneral ConstructionPermit IssuedJames E Fitzgerald05/06/2026
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler04/29/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co03/12/2026
DOB NOWStructuralPermit IssuedR.W. Dake & Co03/11/2026
DOB NOWMechanical SystemsPermit IssuedR.W. Dake & Co03/11/2026
DOB NOWGeneral ConstructionPermit IssuedR.W. Dake & Co03/11/2026
DOB NOWBoiler EquipmentPermit IssuedCross Check Mechanical03/10/2026
DOB NOWGeneral ConstructionPermit IssuedClune Construction Co02/03/2026
DOB NOWPlumbingSigned-offPar Plumbing Co10/29/2025
DOB NOWBoiler EquipmentPermit IssuedCross Check Mechanical10/14/2025
DOB NOWSprinklersPermit IssuedAbco-Peerless Sprinkler05/13/2025
DOB NOWPlumbingSigned-offPar Plumbing Co07/28/2022
DOB NOWMechanical SystemsSigned-offClune Construction Co06/09/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/01/2022
DOB NOWGeneral ConstructionSigned-offHM Hughes Co02/16/2022
DOB NOWMechanical SystemsPermit IssuedMatco Service09/10/2021
DOB NOWMechanical SystemsSigned-offMatco Service04/23/2021
BISMHISSUEDSJS Construction Co08/01/2017
BIS—ISSUEDGoing Sign & Servicing Co12/22/2008
BISPLISSUEDJohnny's P&H Contracting03/05/2007
BISOTISSUEDKeyspan02/20/2007
BISOTISSUEDLarry E.tyree11/22/1996
BISPLISSUEDBrennan Brothers Co11/16/1994
BISFPISSUEDSafety Consultant10/27/1994
BISOTISSUEDS. Digiacomo & Son03/22/1994
BISPLISSUEDMost Plumbing and Heating01/31/1994
BISOTISSUEDVacheron Horizon04/24/1992
BIS—ISSUEDIngram & Greene02/06/1992
BIS—ISSUEDVacheron Horizon11/26/1990
3 projects · most recent 10/15/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026——Heating and Air Conditioning Systems
Heat / Cool
03/09/2026——Ventilation Systems—
08/27/2021Permit IssuedMatco ServiceAir Conditioning Systems, Heating Systems—
1 project · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Permit IssuedAbco-Peerless Sprinkler384 heads
3 projects · most recent 10/15/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
10/15/2026——Gas, Storm, Water/Sanitary
10/28/2025Permit IssuedPar Plumbing CoGas, Water/Sanitary
11/03/2021——Gas
3 projects · most recent 04/24/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/24/2026Permit IssuedSRM Electrical ServiceHVAC Wiring
04/02/2026Permit IssuedC.M. Richey Electrical ContractingGeneral Wiring
03/27/2025CompleteSchlesinger Elect'l ContractingGeneral Wiring
1 project · most recent 10/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/15/2026——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Fail-Final Boiler Equipment InspectionFailView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
06/25/2026Post-installed AnchorsHAMZA MURTAZAspecial
05/22/2026Structural Stability – Alterations of existing buildings—special
05/18/2026Structural Stability – Alterations of existing buildings—special
05/14/2026Maintenance information—energy_progress
05/06/2026Sprinkler SystemsDANIEL COLOMBINIspecial
05/05/2026Duct leakage testing, insulation and design—energy_progress
04/24/2026Energy Code Compliance Inspections—progress
04/14/2026FinalRobert Pompoprogress
04/10/2026FinalRobert Pompoprogress
04/01/2026Air barrier — testing —energy_progress
04/01/2026Air barrier continuity plan testing—energy_progress
04/01/2026Vestibules—energy_progress
04/01/2026Protection of exposed foundation insulation—energy_progress
04/01/2026Post-installed Anchors—special
04/01/2026Structural Cold-Formed Steel—special
03/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationHAMZA MURTAZAspecial
03/27/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
03/26/2026Fenestration air leakage—energy_progress
03/26/2026Air barrier - visual inspection—energy_progress
03/26/2026Fenestration areas—energy_progress
03/26/2026Insulation placement and R values—energy_progress
03/26/2026Fenestration and door U-factor and product ratings—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 78.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
National GridOfficeCellar, Floor 1, Mezzanine, Roof
Project Q01360798 Alteration · Permit Entire · 07/09/2026
Project Q01354276 Alteration · Approved · 03/09/2026
Project Q01327543 New Building · Plan Examiner Review · 02/25/2026
Project Q01331579 Alteration · Permit Entire · 12/22/2025
Project Q01157571 Alteration · Permit Entire · 01/23/2025
Project Q00672025 Alteration · LOC Issued · 04/28/2022
Project Q00672031 Alteration · LOC Issued · 04/06/2022
Project Q00672016 Alteration · LOC Issued · 03/23/2022
Project Q00591980 Alteration · LOC Issued · 10/14/2021
Project Q01285431 Alteration · Permit Entire · 10/27/2025
National Grid Jamaica Training CenterEducationCellar, Floor 1
Project Q01240626 Alteration · Permit Entire · 07/07/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch31
10/13/2026Q01404980-I1Request digital key ↗
08/27/2026Q00576605-I1Request digital key ↗
08/27/2026Q00591980-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00465069-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
02/04/2021440526575Open ↗
01/29/2021440526575Open ↗
01/15/2021410205629Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
08/03/2017421528154Open ↗
12/22/2008410205629Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01327543-I1Open ↗
08/13/2026Q01327543-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature34
10/13/2026Q01404980-I1Open ↗
08/26/2026Q00672025-I1Open ↗
08/18/2026Q01285431-S3Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q00603685-I1Open ↗
09/02/2026Q01331579-I1Open ↗
09/01/2026Q01285431-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/09/2026Q01327543-S7Open ↗
10/09/2026Q01327543-S7Open ↗
09/23/2026Q00603685-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
07/24/2017421528154Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/24/2019440526575Open ↗
07/24/2017421528154Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2017421528154Open ↗
12/15/2008410205629Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2019440526575Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/15/2008410205629Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/24/2019440526575Open ↗
▸Trade Schedules & Equipment16
▸BISEQUIPMENT USE PERMITS13
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01327543-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/18/2026Q00603685-S1Open ↗
08/18/2026Q00603685-I1Open ↗
08/17/2026Q01157571-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/26/2026Q00672025-I1Open ↗
08/18/2026Q01285431-I1Open ↗
08/18/2026Q01285431-S2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/15/2008410205629Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
07/24/2017421528154Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/14/2018421528154Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00465069-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/27/2021440526575Open ↗
02/01/2021410205629Open ↗
01/24/2019440526575Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/01/2022440526575Open ↗
▸BISSOIL REPORT1
01/24/2019440526575Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/01/2021410205629Open ↗
03/14/2018421528154Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/15/2008410205629Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00591980-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/01/2021410205629Open ↗
01/24/2019440526575Open ↗
03/14/2018421528154Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET2
07/24/2017421528154Open ↗
12/15/2008410205629Open ↗
▸BISADDITIONAL INFORMATION2
02/04/2021440526575Open ↗
01/15/2021410205629Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2019440526575Open ↗
▸BISBOROUGH INTAKE FORM1
03/14/2018421528154Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01327543-S8Open ↗
08/17/2026Q01327543-I1Open ↗
08/17/2026Q01327543-S6Open ↗
▸DOB NOWSite Survey: Initial3
08/17/2026Q01327543-S6Open ↗
08/17/2026Q01327543-S8Open ↗
08/13/2026Q01327543-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01327543-I1Open ↗