| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01360798 ↗ | MERRICK BOULEVARD QUEENS | Alteration | Permit Issued | 07/09/2026 | 08/13/2026 | Design EPIQ ENGINEERING Contractor JAMES E FITZGERALD INC | Installation of pre-fabricated platform. No change in use, egress, or occupancy. |
| M00714093 ↗ | 132 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 06/23/2022 | 07/22/2026 | Design TOWER CONSULTING ENGINEERS Owner KPG FUNDS Contractor EXPERT FIRE SPRINKLER,LLC | Modification of existing sprinkler, standpipe, and plumbing systems as per plans filed with. No change of use and or egress involved. |
| M01360259 ↗ | 229 7 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 04/29/2026 | — | Design TOWER CONSULTING ENGINEERS Owner GREYSTAR | — |
| B01360752 ↗ | 8424 DITMAS AVENUE BROOKLYN | Alteration | Permit Issued | 04/01/2026 | 04/09/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner NATIONAL GRID Contractor SIRINA FIRE PROT CORP | Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existi… |
| B01288027 ↗ | 6301 8 AVENUE BROOKLYN | Alteration | Permit Issued | 09/29/2025 | 03/18/2026 | Design TOWER CONSULTING ENGINEERS Owner FEI LONG MARKET, INC. Contractor BELLEROSE PLBG & HEATING | Alterations to existing sprinkler system. No change in use, egress, or occupancy. |
| B01162692 ↗ | 406 VARICK AVENUE | Full Demolition | Signed-off | 01/07/2025 | 10/31/2025 | Owner NATIONAL GRID Contractor GRAMERCY GROUP, INC Filer EXPEDITE DEM INC | mechanical means to assist with demolition of two story structure. |
| Name | Projects together | Most recent |
|---|---|---|
| TOWER CONSULTING ENGINEERS | 9 | 05/07/2026 |
| MURTAZA & KHOKHAR CONSULTING | 5 | 05/03/2023 |
| MG ENGINEERING D.P.C. | 3 | 09/26/2023 |
| STV INCORPORATED | 3 | 03/13/2025 |
| GOLDMAN COPELAND ASSOCIATES | 2 | 04/01/2026 |
| CONCORD CONSULTING ENGINEERING PC | 1 | 01/29/2025 |
| EPIQ ENGINEERING | 1 | 07/09/2026 |
| FORMAT ARCHITECTURE OFFICE, PLLC | 1 | 03/29/2022 |
| H2M ARCHITECTS AND ENGINEERS | 1 | 03/13/2026 |
| M-ENGINEERING NEW YORK, LLC | 1 | 09/24/2025 |
| M.F. GIORDANO ENGINEERING, PLLC | 1 | 01/07/2025 |
| MEYERS+ASSOCIATES ARCHITECTURE | 1 | 09/24/2025 |
| NASIR J, KHANZADA LLC | 1 | 02/21/2024 |
| OPERA STUDIO ARCHITECTURE, LLC | 1 | 01/29/2025 |
| STANTEC | 1 | 03/21/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| INFINITY CONTRACTING SERV | 3 | 03/21/2025 |
| V.H.I CONSTRUCTION CORP | 3 | 05/03/2023 |
| AP PLUMBING & HVAC LLC | 2 | 02/21/2024 |
| QWEST CONTRACTING CORP | 2 | 03/29/2022 |
| ALLPRO GENERAL CNTRTING C | 1 | 08/23/2022 |
| BEDROCK PLBG. & HTG., INC | 1 | 03/29/2022 |
| CAPITOL FIRE SPRINKLER CO | 1 | 09/26/2023 |
| CLUNE CONSTRUCTION CO LP | 1 | 03/13/2026 |
| COUCOUKS LLC | 1 | 06/29/2021 |
| CROSSFIELD P & H CORP | 1 | 03/02/2023 |
| DPH PLUMBING & HTG CORP | 1 | 06/23/2022 |
| EARLY PLBG & HTG INC | 1 | 01/29/2025 |
| EARLY PLUMBING & HTG INC | 1 | 01/29/2025 |
| EXPERT FIRE SPRINKLER,LLC | 1 | 06/23/2022 |
| FOOS FIRE NY LLC | 1 | 07/12/2024 |
| G.P. MECHANICAL CORP | 1 | 06/23/2022 |
| GEORGE BRESLAW PLBNG LLC | 1 | 01/08/2024 |
| GP MECH SERVICES INC | 1 | 06/23/2022 |
| GRAMERCY GROUP, INC | 1 | 01/07/2025 |
| GREAT AMERICAN CONSTR SER | 1 | 08/25/2021 |
| HIGH QUALITY CONSTRUCTION | 1 | 08/25/2021 |
| JAMES E FITZGERALD INC | 1 | 07/09/2026 |
| K.W.MCINTOSH CONSTRUCTION | 1 | 01/29/2025 |
| KYMECH INDUSTRIES INC | 1 | 02/21/2024 |
| MASTER CONSTRUCTION CO IN | 1 | 10/28/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| GLACIER GLOBAL PARTNERS LLC | 3 | 03/29/2022 |
| NATIONAL GRID | 3 | 04/01/2026 |
| FEI LONG MARKET, INC. | 2 | 05/07/2026 |
| 52 HAVEMEYER LLC | 1 | 01/29/2025 |
| CUSHMAN & WAKEFIELD | 1 | 07/12/2024 |
| GREYSTAR | 1 | 04/29/2026 |
| KPG FUNDS | 1 | 06/23/2022 |
| WILLMORE STATE INC | 1 | 05/26/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 3 | 03/29/2022 |
| CONVERSANO ASSOCIATES, INC. | 2 | 03/13/2025 |
| CROSSFIELD PLUMBING & HEATING CORP | 1 | 03/02/2023 |
| EXPEDITE DEM INC | 1 | 01/07/2025 |
| H2M ARCHITECTS + ENGINEERS | 1 | 03/13/2026 |
| NASIR J. KHANZADA LLC | 1 | 02/21/2024 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 09/24/2025 |
| PDG BUILDING CONSULTANTS LLC LLC | 1 | 04/29/2026 |
| TOWER CONSULTING ENGINEERS | 1 | 04/01/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01360798 ↗ | MERRICK BOULEVARD QUEENS | Alteration | Permit Issued | 07/09/2026 | 08/13/2026 | Design EPIQ ENGINEERING Contractor JAMES E FITZGERALD INC | Installation of pre-fabricated platform. No change in use, egress, or occupancy. |
| M00714093 ↗ | 132 WEST 14 STREET MANHATTAN | Alteration | Permit Issued | 06/23/2022 | 07/22/2026 | Design TOWER CONSULTING ENGINEERS Owner KPG FUNDS Contractor EXPERT FIRE SPRINKLER,LLC | Modification of existing sprinkler, standpipe, and plumbing systems as per plans filed with. No change of use and or egress involved. |
| M01360259 ↗ | 229 7 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 04/29/2026 | — | Design TOWER CONSULTING ENGINEERS Owner GREYSTAR | — |
| B01360752 ↗ | 8424 DITMAS AVENUE BROOKLYN | Alteration | Permit Issued | 04/01/2026 | 04/09/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner NATIONAL GRID Contractor SIRINA FIRE PROT CORP | Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existi… |
| B01288027 ↗ | 6301 8 AVENUE BROOKLYN | Alteration | Permit Issued | 09/29/2025 | 03/18/2026 | Design TOWER CONSULTING ENGINEERS Owner FEI LONG MARKET, INC. Contractor BELLEROSE PLBG & HEATING | Alterations to existing sprinkler system. No change in use, egress, or occupancy. |
| B01162692 ↗ | 406 VARICK AVENUE | Full Demolition | Signed-off | 01/07/2025 | 10/31/2025 | Owner NATIONAL GRID Contractor GRAMERCY GROUP, INC Filer EXPEDITE DEM INC | mechanical means to assist with demolition of two story structure. |
| B01288028 ↗ | 6301 8 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 09/29/2025 | — | Design TOWER CONSULTING ENGINEERS Owner FEI LONG MARKET, INC. | — |
| Q01054885 ↗ | 89-67 162 STREET QUEENS | Alteration | Permit Issued | 05/31/2024 | 06/26/2025 | Design H2M ARCHITECTS AND ENGINEERS Owner NATIONAL GRID Contractor CLUNE CONSTRUCTION CO LP | Evaluate and demolish existing stoop, sidewalk and ceiling of vault structure. Replace steel members and concrete slabs under severe structu… |
| M01035662 ↗ | 2238 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/05/2024 | 04/24/2025 | Design STV INCORPORATED Contractor INFINITY CONTRACTING SERV | PROVIDE NEW COOLING TOWER TO REPLACE THE EXISTING, INCLUDING APPURTENANCES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| X01192222 ↗ | 1307 FULTON AVENUE BRONX | Alteration | Signed-off | 03/21/2025 | 04/18/2025 | Design STANTEC Contractor INFINITY CONTRACTING SERV | Remove the existing chiller, install a new replacement chiller, repair any defective or missing pipe insulation, and install a new heat trac… |
| B00668957 ↗ | 52 HAVEMEYER STREET BROOKLYN | Alteration | Permit Issued | 02/10/2022 | 10/17/2024 | Owner 52 HAVEMEYER LLC Contractor EARLY PLBG & HTG INC | Subsequent application filed for installation of Wet Pipe Sprinkler System throughout. |
| B00699603 ↗ | 10 JAY STREET BROOKLYN | Alteration | Signed-off | 03/29/2022 | 10/08/2024 | Design MG ENGINEERING D.P.C. Contractor CAPITOL FIRE SPRINKLER CO | Sprinkler work filed in conjunction with office renovation on the first floor. |
| X01010484 ↗ | 1307 FULTON AVENUE BRONX | Alteration | Filed — no permit on record | 08/15/2024 | — | Design STV INCORPORATED | — |
| B00979252 ↗ | 80 4 STREET BROOKLYN | Alteration CO | Permit Issued | 01/18/2024 | 06/26/2024 | Design M-ENGINEERING NEW YORK, LLC Contractor MJM ASSOCIATES CONSTR LLC | Plumbing work on floors 001, Mez and Roof as indicated on plans |
| Q01006852 ↗ | 90-37 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 03/28/2024 | 05/09/2024 | Design STV INCORPORATED Contractor INFINITY CONTRACTING SERV | PROVIDE NEW AIR-COOLED CHILLER TO REPLACE THE EXISTING. |
| Q00492747 ↗ | 115-16 ROCKAWAY BEACH BLVD QUEENS | Alteration | Permit Issued | 08/25/2021 | 02/20/2024 | Design MURTAZA & KHOKHAR CONSULTING Contractor CROSSFIELD PLBG.&HTG.CORP | Modification and renovation of deli existing sprinkler and plumbing fixtures as per plans. |
| B00975691 ↗ | 70 CHESTER STREET BROOKLYN | Alteration | Permit Issued | 01/08/2024 | 02/02/2024 | Design GOLDMAN COPELAND ASSOCIATES Contractor GEORGE BRESLAW PLBNG LLC | A. CUT , CAP, AND ABANDON EXISTING SEGMENT OF DOMESTIC WATER DISTRIBUTION PIPING SERVING KITCHEN BURIED WITHIN SLAB. B. RE-ROUTE NEW DISTRIB… |
| Q00574534 ↗ | 115-16 ROCKAWAY BEACH BLVD QUEENS | Alteration | Permit Issued | 08/25/2021 | 01/24/2024 | Design MURTAZA & KHOKHAR CONSULTING Contractor HIGH QUALITY CONSTRUCTION | Modification and renovation of deli as per plans. |
| B08029821 ↗ | 2650 BATH AVENUE BROOKLYN | Alteration | Permit Issued | 10/28/2022 | 10/30/2023 | Design TOWER CONSULTING ENGINEERS Contractor MASTER CONSTRUCTION CO INC | Installation of new awning at the main front enterance. |
| Q00869528 ↗ | 57-14 37 AVENUE QUEENS | Alteration | Permit Issued | 05/03/2023 | 09/25/2023 | Design MURTAZA & KHOKHAR CONSULTING Contractor V.H.I CONSTRUCTION CORP | MEANS AND METHODS FOR SUPPORTING EXITING UNDERPINNING FILED UNDER NB APPLICATION # 410071238 AND FIXIING OUTSTANDING ISSUES CAUSED DUE TO PO… |
| Q00934434 ↗ | 88-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/18/2023 | 09/19/2023 | Design TOWER CONSULTING ENGINEERS Owner CUSHMAN & WAKEFIELD Contractor MANENGEERING BUREAU INC | Filing herewith addition/modification sprinkler work inside portion of the cellar floor. No change in use, egress, or occupancy. |
| Q00809838 ↗ | 88-49 179 PLACE QUEENS | Alteration | Signed-off | 01/13/2023 | 08/10/2023 | Design NASIR J, KHANZADA LLC Contractor CROSSFIELD PLBG.&HTG.CORP Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO INSTALL SPRINKLER SYSTEM FOR COMMUNITY RELIGIOUS FACILITY |
| B00866352 ↗ | 83 SHERMAN STREET BROOKLYN | Alteration | Signed-off | 04/27/2023 | 07/10/2023 | Design MURTAZA & KHOKHAR CONSULTING Contractor MID-STATE CONSTRUCTION C | INTERIOR RENOVATION AS ALTERATION TYPE 2 APPLICATION FOR CELLAR FLOOR AS PER PLANS FILED. NO CHANGE OF USE OR EGRESS IS INVOLVED UNDER THIS … |
| B00767569 ↗ | 2650 BATH AVENUE BROOKLYN | Alteration | Permit Issued | 08/23/2022 | 06/06/2023 | Design TOWER CONSULTING ENGINEERS Contractor ALLPRO GENERAL CNTRTING C | Interior renovation of existing basement and 1st floor as per plans filled with. No change in use, egress or occupancy involved. |
| M00740190 ↗ | 27 ELDRIDGE STREET MANHATTAN | Alteration | Signed-off | 05/26/2022 | 06/23/2022 | Design TOWER CONSULTING ENGINEERS Owner WILLMORE STATE INC Contractor V.H.I CONSTRUCTION CORP | PROPOSED DEMOLITION AND CONSTRCTION WORK TO ABATE DOB SUMMONS# 039058213Z TO RESTORE 2ND FLOOR CONDITION AS PER DEPARTMENT OF BUILDINGS RE… |
| B00699580 ↗ | 10 JAY STREET BROOKLYN | Alteration | Signed-off | 03/29/2022 | 04/20/2022 | Design MG ENGINEERING D.P.C. Contractor BEDROCK PLBG. & HTG., INC Filer JM ZONING, LLC. | Plumbing work filed in conjunction with interior office renovation on the first floor. |
| B00685966 ↗ | 10 JAY STREET BROOKLYN | Alteration | Signed-off | 03/29/2022 | 04/13/2022 | Contractor QWEST CONTRACTING CORP Filer JM ZONING, LLC. | Interior renovation of an existing office space on the first floor, no change in use, egress and occupancy |
| B00699593 ↗ | 10 JAY STREET BROOKLYN | Alteration | Permit Issued | 03/29/2022 | 04/13/2022 | Design MG ENGINEERING D.P.C. Contractor QWEST CONTRACTING CORP Filer JM ZONING, LLC. | Mechanical filed in conjunction with gc renovation for the 1st floor office space. |
| B00548870 ↗ | 83 SHERMAN STREET BROOKLYN | Alteration | Signed-off | 06/29/2021 | 01/14/2022 | Design MURTAZA & KHOKHAR CONSULTING Contractor V.H.I CONSTRUCTION CORP | INTERIOR RENOVATION AS ALTERATION TYPE 2 APPLICATION FOR MODIFICATION OF EXISTING KITHCHEN OPENING AS PER PLANS FILED WITH. NO CHANGE OF USE… |
| Building | Filings | Most Recent |
|---|---|---|
| MERRICK BOULEVARD ↗ | 1 | 07/09/2026 |
| 6301 8 AVENUE ↗ | 3 | 05/07/2026 |
| 229 7 AVENUE ↗ | 1 | 04/29/2026 |
| 8424 DITMAS AVENUE ↗ | 1 | 04/01/2026 |
| 89-67 162 STREET ↗ | 2 | 03/13/2026 |
| 1307 FULTON AVENUE ↗ | 2 | 03/21/2025 |
| 2238 5 AVENUE ↗ | 2 | 03/13/2025 |
| 406 VARICK AVENUE ↗ | 1 | 01/07/2025 |
| 90-37 PARSONS BOULEVARD ↗ | 3 | 11/20/2024 |
| 80 4 STREET ↗ | 2 | 08/12/2024 |
| 88-15 QUEENS BOULEVARD ↗ | 2 | 07/12/2024 |
| 88-49 179 PLACE ↗ | 5 | 02/21/2024 |
| 70 CHESTER STREET ↗ | 1 | 01/08/2024 |
| 10 JAY STREET ↗ | 5 | 09/26/2023 |
| 57-14 37 AVENUE ↗ | 1 | 05/03/2023 |
| 83 SHERMAN STREET ↗ | 2 | 04/27/2023 |
| 115-16 ROCKAWAY BEACH BLVD ↗ | 4 | 03/02/2023 |
| 52 HAVEMEYER STREET ↗ | 2 | 12/28/2022 |
| 2650 BATH AVENUE ↗ | 2 | 10/28/2022 |
| 132 WEST 14 STREET ↗ | 1 | 06/23/2022 |
| 27 ELDRIDGE STREET ↗ | 1 | 05/26/2022 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/20/2026 | Post-installed Anchors | 229 7 AVENUE | HAMZA MURTAZA | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | 229 7 AVENUE | HAMZA MURTAZA | special |
| 06/25/2026 | Post-installed Anchors | MERRICK BOULEVARD | HAMZA MURTAZA | special |
| 04/27/2026 | Fire-Resistant Penetrations and Joints | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 04/27/2026 | Sprinkler Systems | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 04/02/2026 | Structural Steel - Welding | 89-67 162 STREET | HAMZA MURTAZA | special |
| 04/02/2026 | Structural Steel - High Strength Bolting | 89-67 162 STREET | HAMZA MURTAZA | special |
| 04/02/2026 | Structural Stability – Alterations of existing buildings | 89-67 162 STREET | HAMZA MURTAZA | special |
| 04/02/2026 | Structural Steel - Details | 89-67 162 STREET | HAMZA MURTAZA | special |
| 04/02/2026 | Structural Cold-Formed Steel | 89-67 162 STREET | HAMZA MURTAZA | special |
| 04/02/2026 | Final | 89-67 162 STREET | HAMZA MURTAZA | progress |
| 03/05/2026 | Structural Cold-Formed Steel | 89-67 162 STREET | HAMZA MURTAZA | special |
| 03/05/2026 | Structural Stability – Alterations of existing buildings | 89-67 162 STREET | HAMZA MURTAZA | special |
| 03/05/2026 | Structural Steel - Details | 89-67 162 STREET | HAMZA MURTAZA | special |
| 03/05/2026 | Structural Steel - High Strength Bolting | 89-67 162 STREET | HAMZA MURTAZA | special |
| 03/05/2026 | Structural Steel - Welding | 89-67 162 STREET | HAMZA MURTAZA | special |
| 03/05/2026 | Final | 89-67 162 STREET | HAMZA MURTAZA | progress |
| 02/23/2026 | Tenant Protection Plan Compliance | 229 7 AVENUE | HAMZA MURTAZA | special |
| 02/17/2026 | Standpipe Systems | 8424 DITMAS AVENUE | DANIEL COLOMBINI | special |
| 02/17/2026 | Sprinkler Systems | 8424 DITMAS AVENUE | DANIEL COLOMBINI | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | 8424 DITMAS AVENUE | DANIEL COLOMBINI | special |
| 02/17/2026 | Post-installed Anchors | 8424 DITMAS AVENUE | HAMZA MURTAZA | special |
| 02/16/2026 | Sprinkler Systems | 229 7 AVENUE | HAMZA MURTAZA | special |
| 09/24/2025 | Fire-Resistant Penetrations and Joints | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 09/24/2025 | Fire-Resistant Penetrations and Joints | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 09/16/2025 | Sprinkler Systems | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 09/16/2025 | Sprinkler Systems | 6301 8 AVENUE | HAMZA MURTAZA | special |
| 12/02/2024 | Maintenance information | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 12/02/2024 | HVAC-R and service water piping design and insulation | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 12/02/2024 | HVAC-R and service water heating system controls | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 12/02/2024 | Energy Code Compliance Inspections | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | progress |
| 12/02/2024 | Final | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | progress |
| 12/02/2024 | Mechanical Systems | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | special |
| 12/02/2024 | Fire-Resistant Penetrations and Joints | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | special |
| 11/14/2024 | Fire-Resistant Penetrations and Joints | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | special |
| 11/14/2024 | Mechanical Systems | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | special |
| 11/14/2024 | Energy Code Compliance Inspections | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | progress |
| 11/14/2024 | Final | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | progress |
| 11/14/2024 | HVAC-R and service water piping design and insulation | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 11/14/2024 | HVAC-R and service water heating system controls | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 11/14/2024 | Maintenance information | 90-37 PARSONS BOULEVARD | HAMZA MURTAZA | energy_progress |
| 08/12/2024 | Post-installed Anchors | 80 4 STREET | HAMZA MURTAZA | special |
| 08/12/2024 | Fire-Resistant Penetrations and Joints | 80 4 STREET | HAMZA MURTAZA | special |
| 08/12/2024 | Sprinkler Systems | 80 4 STREET | HAMZA MURTAZA | special |
| 08/09/2024 | Fire-Resistant Penetrations and Joints | 80 4 STREET | HAMZA MURTAZA | special |
| 08/09/2024 | Post-installed Anchors | 80 4 STREET | HAMZA MURTAZA | special |
| 08/09/2024 | Sprinkler Systems | 80 4 STREET | HAMZA MURTAZA | special |
| 07/12/2024 | Fire-Resistant Penetrations and Joints | 88-15 QUEENS BOULEVARD | HAMZA MURTAZA | special |
| 07/12/2024 | Sprinkler Systems | 88-15 QUEENS BOULEVARD | HAMZA MURTAZA | special |
| 07/10/2024 | Sprinkler Systems | 88-15 QUEENS BOULEVARD | HAMZA MURTAZA | special |