Five to six families
1279 ST JOHNS PLACE
BROOKLYN · BIN 3036782
💬 Discuss this project
1906Year Built
3Stories
C2Building Class
R6Zoning
6,396 sfGross Floor Area
6Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: BHMPW 1279 LLC · 3,167 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 36p · 1 filing · 3 docs
Floor 27p · 2 filings · 7 docs
Floor 16p · 1 filing · 3 docs
Basement2p · 2 filings · 7 docs
Sub-Basement6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEMCAP303/22/2026
BHMPW 1279 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/24/2014$701K—— → —$110/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EK ENGINEERING,P.C.210/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EK ENGINEERING, P.C.6883310/31/2022
Building Lifecycle
All (88)Filed (2)Permit Issued (1)Violation (60)Objection (24)Special Inspection (1)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
10/13/2023
Permit issued — Mechanical Systems
B00776705-I1-MS
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Objection raised — Admin
03/31/2023
Objection resolved — Addressed
03/31/2023
Objection raised — Mechanical
03/31/2023
Objection resolved — Addressed
03/24/2023
Violation issued (HPD, closed)
A
03/10/2023
Objection raised — Admin
03/10/2023
Objection resolved — Addressed
01/17/2023
Objection raised — Admin
01/17/2023
Objection resolved — Addressed
01/17/2023
Objection raised — Admin
01/17/2023
Objection resolved — Addressed
01/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD KAJA
11/13/2022
Objection raised — Scope
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Zoning
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Cost
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Scope
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Admin
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Cost
11/13/2022
Objection resolved — Addressed
11/13/2022
Objection raised — Scope
11/13/2022
Objection resolved — Addressed
11/07/2022
Violation issued (HPD, closed)
I
10/31/2022
Filed — Alteration
INSTALLATION OF SPLIT DX AC SYSTEMS FOR THE BUILDING. DESIGN INCLUDES INDOOR & OUTDOOR UNITS, REFRIDGERANT PIPING, CONSENDATE PIPING, PIPING SUPPORTS, FLUES AND ACCESSORIES AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B00776705-I1
10/31/2022
Filed — Alteration
DESIGN FOR THE REMOVAL OF 1 BOILER FOR THE BUILDING. DESIGN FOR PIPIN 6 GAS FIRED HOT WATER HEATERS, 6 GAS FIRED FURNACES, GAS PIPING, VALVES SUPPORTS, CONTROLS AND RELATED WORK AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS
B00776685-I1
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2019
Violation issued (HPD, closed)
I
06/25/2019
Violation issued (HPD, open)
B
05/03/2019
Violation issued (HPD, open)
A
05/03/2019
Violation issued (HPD, open)
B
05/03/2019
Violation issued (HPD, open)
A
10/19/2018
Violation issued (HPD, closed)
I
05/10/2018
Violation issued (HPD, open)
B
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2016
Violation issued (HPD, open)
C
05/25/2016
Violation issued (HPD, open)
A
05/25/2016
Violation issued (HPD, open)
A
05/25/2016
Violation issued (HPD, open)
A
05/25/2016
Violation issued (HPD, open)
A
05/25/2016
Violation issued (HPD, open)
B
05/25/2016
Violation issued (HPD, open)
A
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedWAXTEL LLC10/13/2023
BISPLISSUEDORION PLUMBING & HTG CORP01/23/2015
BISOTISSUEDIMPACT BUILDERS CORP12/04/2014
BISOTISSUEDIMPACT BUILDERS CORP11/20/2014
1 project · most recent 10/31/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/31/2022Permit IssuedWAXTEL LLCAir Conditioning Systems
Cooling
— Model# GSX13036 36,000 BTU · Condensing Unit ×6
1 project · most recent 10/31/2022
Gas
FiledStatusContractorScope
10/31/2022——Gas
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/07/2023Fire-Resistant Penetrations and JointsEDWARD KAJAspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/14/2026B00776685-I1Request digital key ↗
08/14/2026B00776705-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
02/13/2026340194239Open ↗
02/02/2026340194239Open ↗
11/03/2025340194239Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
01/26/2015340194239Open ↗
12/08/2014340194239Open ↗
11/20/2014340194239Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00776705-I1Open ↗
08/13/2026B00776685-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/17/2014340194239Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/17/2015340194239Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/17/2014340194239Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B00776685-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/17/2014340194239Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/15/2015340194239Open ↗
▸BISSCHEDULE B - PLUMBING1
11/17/2014340194239Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00776705-I1Open ↗
08/13/2026B00776685-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2014340194239Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/17/2015340194239Open ↗
12/17/2015340194239Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/17/2014340194239Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/17/2015340194239Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/17/2014340194239Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/17/2015340194239Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/17/2015340194239Open ↗
11/17/2014340194239Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/17/2014340194239Open ↗