Public elementary, junior or senior high
P.S. 129 Patricia Larkin
128-02 7 AVENUE · BIN 4096774
💬 Discuss this project
1933Year Built
4Stories
W1Building Class
R2AZoning
171,435 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 90,000 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 20 docs
Floor 30Under Construction1 filing · 20 docs
Floor 29Under Construction1 filing · 20 docs
Floor 28Under Construction1 filing · 20 docs
Floor 27Under Construction1 filing · 20 docs
Floor 26Under Construction1 filing · 20 docs
Floor 25Under Construction1 filing · 20 docs
Floor 24Under Construction1 filing · 20 docs
Floor 23Under Construction1 filing · 20 docs
Floor 22Under Construction1 filing · 20 docs
Floor 21Under Construction1 filing · 20 docs
Floor 20Under Construction1 filing · 20 docs
Floor 19Under Construction1 filing · 20 docs
Floor 18Under Construction1 filing · 20 docs
Floor 17Under Construction1 filing · 20 docs
Floor 16Under Construction1 filing · 20 docs
Floor 15Under Construction1 filing · 20 docs
Floor 14Under Construction1 filing · 20 docs
Floor 13Under Construction1 filing · 20 docs
Floor 12Under Construction1 filing · 20 docs
Floor 11Under Construction1 filing · 20 docs
Floor 10Under Construction1 filing · 20 docs
Floor 9Under Construction1 filing · 20 docs
Floor 8Under Construction1 filing · 20 docs
Floor 7Under Construction1 filing · 20 docs
Floor 6Under Construction1 filing · 20 docs
Floor 5Under Construction1 filing · 20 docs
Floor 4Under Construction1p · 1 filing · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
Sub-BasementUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY PUBLIC SCHOOL109/01/2026
NYC SCHOOL CONSTRUCTION2308/20/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1803/22/2026
DOE PS 129 040703/22/2026
TECHNICO CONSTRUCTION SER503/22/2026
DOE P.S. 129803/22/2026
DOE 040103/22/2026
DOE P.S. 129 TRANSPORTABL103/22/2026
P.S. 129 DOE1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME GROUP/SALAS O'BRIEN108/21/2026
IGOR SHIMANOVSKIY104/22/2026
AK CONSULTING SERVICES, INC802/09/2026
NYCSCA309/24/2025
NYC SCA111/25/2024
NYC SCHOOL CONSTRUCTION AUTHORITY111/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1603/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIDELIS CONTRACTING INCGeneral Contractor1108/20/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
MNBC ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351108/21/2026
UNIVERSAL TESTING AND INS400704/22/2026
Building Lifecycle
All (126)Filed (15)Permit Issued (9)Violation (60)Objection (16)Special Inspection (26)
08/21/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE GYMNASIUM.
Q01437601-I1
08/19/2026
Permit issued — Sidewalk Shed
Q01267751-I1-SH
08/14/2026
Violation issued (ECB, open)
Unknown
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
07/28/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
07/28/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
07/28/2026
Special inspection requirement — Final
Asma Hashmi
05/19/2026
Permit issued — Sidewalk Shed
Q01267751-I1-SH
04/22/2026
Filed — Alteration
Provide 1 new gravity ventilator on the roof # 1.
Q01115462-P2
02/19/2026
Permit issued — Sidewalk Shed
Q01267751-I1-SH
02/18/2026
Permit issued — Structural
Q01115462-I1-GC-CX
02/18/2026
Permit issued — General Construction
Q01115462-S4-GC
02/13/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Other
02/09/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01267751-P1
02/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01267749-P1
02/06/2026
Filed — Alteration
Q01267760-P1
02/06/2026
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01287174-P1
01/29/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/12/2025
Permit issued — Protection and Mechanical Methods
Q01287174-I1-PMM
11/12/2025
Permit issued — Supported Scaffold
Q01267760-I1-SF
11/03/2025
Permit issued — Sidewalk Shed
Q01267751-I1-SH
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, closed)
Construction
10/27/2025
Objection resolved — Addressed
10/24/2025
Permit issued — Construction Fence
Q01267749-I1-FN
10/21/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Other
10/10/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01287174-I1
10/03/2025
Objection resolved — Addressed
09/30/2025
Special inspection requirement — Final
NELSON LOPEZ
09/30/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
09/30/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
09/30/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
09/30/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/30/2025
Special inspection requirement — Masonry
NELSON LOPEZ
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
09/25/2025
Objection raised — Other
09/25/2025
Objection raised — Other
09/24/2025
Filed — Alteration
Q01267760-I1
09/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01267749-I1
09/24/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 129Q AT 128-02 7 AVENUE, QUEENS IN CONJUNCTION WITH ALT# Q01115462 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01267751-I1
09/24/2025
Filed — Alteration
Provide 1 new gravity ventilator on the roof # 1.
Q01115462-P1
09/24/2025
Special inspection requirement — Final
NELSON LOPEZ
09/24/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
09/24/2025
Special inspection requirement — Masonry
NELSON LOPEZ
09/24/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
09/24/2025
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
09/24/2025
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
01/22/2025
Objection resolved — Addressed
01/10/2025
Objection resolved — Addressed
01/10/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedFIDELIS CONTRACTING INC08/19/2026
DOB NOWSidewalk ShedPermit IssuedFIDELIS CONTRACTING INC05/19/2026
DOB NOWSidewalk ShedPermit IssuedFIDELIS CONTRACTING INC02/19/2026
DOB NOWStructuralPermit IssuedFIDELIS CONTRACTING INC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedFIDELIS CONTRACTING INC02/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFIDELIS CONTRACTING INC11/12/2025
DOB NOWSupported ScaffoldPermit IssuedFIDELIS CONTRACTING INC11/12/2025
DOB NOWSidewalk ShedPermit IssuedFIDELIS CONTRACTING INC11/03/2025
DOB NOWConstruction FencePermit IssuedFIDELIS CONTRACTING INC10/24/2025
BISSPISSUEDA & F FIRE PROTECTION CO08/29/2023
BISMHISSUEDR.A.M.S. MECHANICAL INC04/03/2023
BISOTISSUEDTECHNICO CONSTRUCTION03/30/2023
BISOTISSUEDTECHNICO CONSTRUCTION03/30/2023
BISOTISSUEDNYCSCA03/03/2023
BISOTISSUEDTECHNICO CONSTRUCTION02/22/2023
BISOTISSUEDTECHNICO CONSTRUCTION02/22/2023
BISPLISSUEDVITAL PLUMBING, INC07/14/2022
BISSPISSUEDA & F FIRE PROTECTION CO06/16/2022
BISMHISSUEDR.A.M.S. MECHANICAL INC03/31/2022
BISMHISSUEDR.A.M.S. MECHANICAL INC03/07/2022
BISOTISSUEDTECHNICO CONSTRUCTION02/25/2022
BISOTISSUEDTECHNICO CONSTRUCTION02/24/2022
BISOTISSUEDTECHNICO CONSTRUCTION02/17/2022
BISOTISSUEDTECHNICO CONSTRUCTION02/17/2022
BISEQISSUEDTECHNICO CONSTRUCTION08/10/2021
BISPLISSUEDVITAL PLUMBING, INC07/13/2021
BISSPISSUEDA & F FIRE PROTECTION CO06/22/2021
BISMHISSUEDR.A.M.S. MECHANICAL INC03/17/2021
BISOTISSUEDTECHNICO CONSTRUCTION02/18/2021
BISOTISSUEDTECHNICO CONSTRUCTION02/18/2021
BISEQISSUEDTECHNICO CONSTRUCTION09/11/2020
BISSPISSUEDA & F FIRE PROTECTION CO07/21/2020
BISPLISSUEDVITAL PLUMBING, INC07/21/2020
BISPLISSUEDVITAL PLUMBING, INC07/02/2020
BISOTISSUEDGRAMERCY GROUP, INC07/02/2020
BISPLISSUEDVITAL PLUMBING, INC07/02/2020
BISOTISSUEDGRAMERCY GROUP, INC07/02/2020
BISOTISSUEDGRAMERCY GROUP, INC07/02/2020
BISMHISSUEDGRAMERCY GROUP, INC07/02/2020
BISMHISSUEDR.A.M.S. MECHANICAL INC03/31/2020
+ 19 more permits on file
1 project · most recent 04/22/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026Permit IssuedFIDELIS CONTRACTING INCVentilation Systems
Ventilation
1 project · most recent 04/22/2026
Storm
FiledStatusContractorScope
04/22/2026——Storm
16 projects · most recent 06/09/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
06/09/2026Permit IssuedPRINCE ELECTRIC CORP.General Wiring
06/05/2026CompletePACIFIC ELEC'L CONTR'G IN—
05/21/2026Permit IssuedLIT MODE ELECL CONTG INC—
05/21/2026Permit IssuedLIT MODE ELECL CONTG INC—
05/21/2026Permit IssuedLIT MODE ELECL CONTG INC—
05/06/2026CompleteA & S ELECTRIC INC.—
03/28/2026Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
01/28/2026CompleteCHARAN ELEC'L ENTERP'S IN—
10/31/2025Permit IssuedLIT MODE ELECL CONTG INC—
04/30/2024Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
09/08/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/02/2022CompleteMNBC ELECTRICAL CORPGeneral Wiring
03/13/2019CompleteCHARAN ELEC'L ENTERP'S IN—
11/05/2018CompleteBZ ELECTRIC, INCHVAC Wiring
07/16/2018Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
1 project · most recent 04/22/2026
Concrete Masonry
FiledStatusContractorScope
04/22/2026Permit IssuedFIDELIS CONTRACTING INCConcrete, Masonry
2 projects · most recent 02/09/2026
Sidewalk Shed Fence
FiledStatusContractorScope
02/09/2026Permit IssuedFIDELIS CONTRACTING INCSidewalk Shed
02/06/2026Permit IssuedFIDELIS CONTRACTING INCFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/28/2026Energy Code Compliance InspectionsAsma Hashmiprogress
07/28/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
07/28/2026Post-installed AnchorsAsma Hashmispecial
07/28/2026Mechanical SystemsAsma Hashmispecial
07/28/2026FinalAsma Hashmiprogress
01/29/2026Post-installed AnchorsNELSON LOPEZspecial
09/30/2025FinalNELSON LOPEZprogress
09/30/2025Structural Steel - WeldingNELSON LOPEZspecial
09/30/2025Structural Steel - DetailsNELSON LOPEZspecial
09/30/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
09/30/2025Post-installed AnchorsNELSON LOPEZspecial
09/30/2025MasonryNELSON LOPEZspecial
09/30/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
09/24/2025FinalNELSON LOPEZprogress
09/24/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
09/24/2025MasonryNELSON LOPEZspecial
09/24/2025Post-installed AnchorsNELSON LOPEZspecial
09/24/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
09/24/2025Structural Steel - DetailsNELSON LOPEZspecial
09/24/2025Structural Steel - WeldingNELSON LOPEZspecial
12/27/2024Fire-Resistance Rated ConstructionNELSON LOPEZprogress
11/20/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/20/2024Post-installed AnchorsNELSON LOPEZspecial
11/20/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
09/23/2024Mechanical SystemsNELSON LOPEZspecial
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 129, QueensEducation—
Project Q01287174 Alteration · Permit Entire · 10/10/2025
Project Q01267749 Alteration · Permit Entire · 09/24/2025
Project Q01267751 Alteration · Permit Entire · 09/24/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/22/2026Q01437601-I1Request digital key ↗
08/18/2026Q01267760-P1Request digital key ↗
08/18/2026Q01267760-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits1
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/03/2016401260782Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/24/2026Q01437601-P1Open ↗
08/22/2026Q01437601-I1Open ↗
08/18/2026Q01267760-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026Q01115462-S1Open ↗
08/28/2026Q01115462-P1Open ↗
08/28/2026Q01115462-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026Q01115462-S1Open ↗
08/28/2026Q01115462-P1Open ↗
08/23/2026Q01115462-S4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/13/2026Q01267751-P1Open ↗
08/13/2026Q01267749-P1Open ↗
08/13/2026Q01267749-P2Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/24/2026Q01437601-P1Open ↗
08/22/2026Q01437601-I1Open ↗
08/18/2026Q01267760-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/13/2026Q01115462-S2Open ↗
08/13/2026Q01267749-P2Open ↗
08/13/2026Q01267751-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/12/2018401260782Open ↗
11/30/2017401260782Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/14/2026Q01115462-S4Open ↗
08/14/2026Q01115462-I1Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/13/2026Q01267760-P1Open ↗
08/13/2026Q01115462-P1Open ↗
08/13/2026Q01267749-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026Q01115462-I1Open ↗
08/13/2026Q01115462-P1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026Q01115462-S1Open ↗