| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01347425 ↗ | 1132 OAK POINT AVENUE BRONX | Full Demolition | Permit Issued | 02/20/2026 | 09/18/2026 | Design ANCORA ENGINEERING, PLLC Owner OAK POINT AVENUE GL LLC Filer EXPEDITE DEM INC | Mechanical means will assist with demolition of structure |
| X01420239 ↗ | 1132 OAK POINT AVENUE BRONX | Alteration | Permit Issued | 06/29/2026 | 08/24/2026 | Design ANCORA ENGINEERING, PLLC Owner OAK POINT AVENUE GL LLC | THE PLANS ENCLOSED DEPICT THE PARTIAL MASONRY WALL REMOVAL OF THE 2 STORY BUILDING(S) LOCATED AT 1132 OAKPOINT AVENUE, BRONX NEW YORK, 10474… |
| M01175764 ↗ | 854 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/26/2025 | 08/12/2026 | Design PETER PENNOYER ARCHITECTS Filer METROPOLIS GROUP INC | REMOVE HVAC EQUIPMENT AND PIPING ON FLOORS CEL THROUGH 05. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00961270 ↗ | 521 WEST 37 STREET MANHATTAN | Full Demolition | Permit Issued | 03/14/2024 | 07/22/2026 | Use of Mechanical Demolition Equipment as per plans filed herewith. This application is filed in conjunction with DM M00961270-I1. | |
| B00139781 ↗ | 100 FERRIS STREET BROOKLYN | Alteration | Permit Issued | 03/11/2019 | 07/17/2026 | Design ANCORA ENGINEERING, PLLC Owner EXPEDITE DEM INC Filer EXPEDITE DEM INC | installation of construction fence to protect site. |
| X01399339 ↗ | 450 HUTCHINSON RVR PKWY BRONX | Full Demolition | Permit Issued | 05/15/2026 | 07/16/2026 | Filer EXPEDITE DEM INC | mechanical equipment will be used to demolish structure from exterior and placed on grade. |
| Name | Projects together | Most recent |
|---|---|---|
| M.F. GIORDANO ENGINEERING, PLLC | 22 | 06/23/2026 |
| HOWARD I SHAPIRO & ASSOCIATES | 19 | 06/11/2026 |
| PLAN B ENGINEERING | 19 | 03/14/2025 |
| ANCORA ENGINEERING, PLLC | 18 | 07/09/2026 |
| SANDEEP GUNNALA ENGINEERING PLLC | 10 | 02/22/2024 |
| ARRAY ARCHITECTS | 7 | 03/19/2025 |
| JAROS BAUM & BOLLES | 6 | 09/23/2024 |
| HIGHRISE GROUP NYC, INC | 5 | 11/19/2019 |
| HIRANI | 3 | 06/16/2023 |
| NYC DEP | 3 | 12/07/2021 |
| TETRA TECH, INC. | 3 | 09/12/2024 |
| THE LIRO GROUP | 3 | 06/26/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 11/02/2022 |
| YSRAEL A. SEINUK, P.C. | 2 | 11/28/2023 |
| BEYER BLINDER BELLE | 1 | 05/10/2024 |
| CES ENGINEERING LLC | 1 | 02/26/2026 |
| PETER PENNOYER ARCHITECTS | 1 | 02/26/2026 |
| William J. Frank Engineering, P.C. | 1 | 10/17/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CONSIGLI CONSTRUCTION CO | 2 | 03/19/2025 |
| TUTOR PERINI CORPORATION | 2 | 03/14/2025 |
| JRM CONSTRUCTION MGMT LLC | 1 | 02/26/2026 |
| PADILLA CONSTRUCTION SERV | 1 | 05/12/2023 |
| SKANSKA USA BUILDING, INC | 1 | 01/12/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| DDC | 17 | 06/26/2025 |
| NEW YORK PRESBYTERIAN HOSPITAL | 15 | 03/19/2025 |
| NYC ECONOMIC DEVELOPMENT CORP | 6 | 08/06/2024 |
| SECOND AVE SOLOW DEV CORP | 5 | 02/22/2024 |
| HUDSON YARDS DEVELOPMENT CORPORATIO | 4 | 06/11/2026 |
| NEW YORK CITY DEPARTMENT OF ENVIRON | 4 | 06/27/2018 |
| NEW YORK CITY DEPT. OF ENVIRONMENTA | 3 | 09/12/2024 |
| EXPEDITE DEM INC | 2 | 07/07/2020 |
| FEDEX GROUND | 2 | 01/12/2023 |
| NYC DEPARTMENT OF TRANSPORTATION | 2 | 05/31/2024 |
| OAK POINT AVENUE GL LLC | 2 | 07/09/2026 |
| OWNERS REP | 2 | 11/02/2022 |
| QUEENS BALLPARK COMPANY | 2 | 06/23/2026 |
| SOLOW REALTY & DEVELOPMEN | 2 | 03/14/2019 |
| Arthur Kill Power LLC | 1 | 01/19/2024 |
| GRAMERCY GROUP, INC. | 1 | 06/03/2021 |
| HUDSON SQUARE REALTY, LLC | 1 | 09/16/2019 |
| KING STREET PROPERTIES | 1 | 08/28/2019 |
| LENDLEASE | 1 | 07/14/2021 |
| Met Tower Owner | 1 | 12/05/2019 |
| NATIONAL GRID | 1 | 01/07/2025 |
| R. A. COHEN | 1 | 06/02/2021 |
| THORNHAM MANAGEMENT LIMITED | 1 | 02/26/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| EXPEDITE DEM INC | 26 | 07/06/2026 |
| JAM CONSULTANTS, INC. | 17 | 06/26/2025 |
| MUNICIPAL EXPEDITING INC | 13 | 03/19/2025 |
| A1 EXPEDITING SERVICE CORP. | 11 | 07/09/2026 |
| HOWARD I. SHAPIRO & ASSOCIATES | 8 | 06/11/2026 |
| HIGHRISE GROUP NYC, INC | 5 | 05/10/2023 |
| AE DESIGN SOLUTION INC. | 2 | 11/02/2022 |
| RPO INC. | 2 | 10/17/2024 |
| BELFIORE DEVELOPMENT GROUP | 1 | 04/14/2021 |
| METROPOLIS GROUP INC | 1 | 02/26/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01347425 ↗ | 1132 OAK POINT AVENUE BRONX | Full Demolition | Permit Issued | 02/20/2026 | 09/18/2026 | Design ANCORA ENGINEERING, PLLC Owner OAK POINT AVENUE GL LLC Filer EXPEDITE DEM INC | Mechanical means will assist with demolition of structure |
| X01420239 ↗ | 1132 OAK POINT AVENUE BRONX | Alteration | Permit Issued | 06/29/2026 | 08/24/2026 | Design ANCORA ENGINEERING, PLLC Owner OAK POINT AVENUE GL LLC | THE PLANS ENCLOSED DEPICT THE PARTIAL MASONRY WALL REMOVAL OF THE 2 STORY BUILDING(S) LOCATED AT 1132 OAKPOINT AVENUE, BRONX NEW YORK, 10474… |
| M01175764 ↗ | 854 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/26/2025 | 08/12/2026 | Design PETER PENNOYER ARCHITECTS Filer METROPOLIS GROUP INC | REMOVE HVAC EQUIPMENT AND PIPING ON FLOORS CEL THROUGH 05. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00961270 ↗ | 521 WEST 37 STREET MANHATTAN | Full Demolition | Permit Issued | 03/14/2024 | 07/22/2026 | Use of Mechanical Demolition Equipment as per plans filed herewith. This application is filed in conjunction with DM M00961270-I1. | |
| B00139781 ↗ | 100 FERRIS STREET BROOKLYN | Alteration | Permit Issued | 03/11/2019 | 07/17/2026 | Design ANCORA ENGINEERING, PLLC Owner EXPEDITE DEM INC Filer EXPEDITE DEM INC | installation of construction fence to protect site. |
| X01399339 ↗ | 450 HUTCHINSON RVR PKWY BRONX | Full Demolition | Permit Issued | 05/15/2026 | 07/16/2026 | Filer EXPEDITE DEM INC | mechanical equipment will be used to demolish structure from exterior and placed on grade. |
| Q01418832 ↗ | 123-01 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 06/23/2026 | 07/15/2026 | Owner QUEENS BALLPARK COMPANY | Use of equipment listed to process debris on ground as per plans filed herewith. |
| Q01409302 ↗ | 123-01 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 06/16/2026 | 07/08/2026 | Owner QUEENS BALLPARK COMPANY | FILING HEREWITH REMOVAL OF SIGNAGE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED UNDER MPP Project-00000… |
| X00618365 ↗ | LAFAYETTE AVENUE BRONX | New Building | Permit Issued | 11/10/2021 | 06/23/2026 | Design NYC DEP | Construction of three (3) new unenclosed adjacent elevated concrete platforms supported by concrete columns on individual pile caps. The pla… |
| X00631080 ↗ | LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 12/07/2021 | 06/23/2026 | Design NYC DEP | Demolition and reconstruction of the top-level (roof) and the subfloors of the pumping station structure. Work also includes replacement st… |
| X01404679 ↗ | 450 HUTCHINSON RVR PKWY BRONX | Alteration | Permit Issued | 06/03/2026 | 06/08/2026 | Filer EXPEDITE DEM INC | installation of construction fence to protect site, during full demolition. |
| X01400453 ↗ | 538 HUTCHINSON RIVER PARKWAY BRONX | Alteration | Permit Issued | 05/15/2026 | 05/18/2026 | Filer EXPEDITE DEM INC | construction fence to protect site during entire project |
| M00849935 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/02/2024 | 04/01/2026 | Design TETRA TECH, INC. | Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbin… |
| M00849947 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 04/22/2024 | 03/05/2026 | Design TETRA TECH, INC. | Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon ent… |
| M00872417 ↗ | 417 CANAL STREET MANHATTAN | Alteration | Permit Issued | 05/09/2024 | 03/05/2026 | Design TETRA TECH, INC. | Filing to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel r… |
| M01033609 ↗ | 535 WEST 38 STREET MANHATTAN | Full Demolition | Permit Issued | 05/01/2024 | 02/02/2026 | Conversion of existing elevator shaft to debris chute as per plans filed herewith. | |
| M00974121 ↗ | 522 WEST 38 STREET MANHATTAN | Full Demolition | Permit Issued | 03/14/2024 | 01/21/2026 | Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1. | |
| M01250561 ↗ | 522 WEST 38 STREET MANHATTAN | Alteration | Permit Issued | 07/21/2025 | 01/16/2026 | — | Partial and interior demolition of 11 story building as per plans filed herewith. |
| X01123696 ↗ | LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 10/17/2024 | 12/05/2025 | Filer RPO INC. | THE PROPOSED MODIFICATIONS TO THE EXISTING CONSTRUCTION FENCE IS FILED IN CONJUNCTION WITH APPLICATION #220719337 TO SATISFY CONDITION #2 OF… |
| B01162692 ↗ | 406 VARICK AVENUE | Full Demolition | Signed-off | 01/07/2025 | 10/31/2025 | Owner NATIONAL GRID Filer EXPEDITE DEM INC | mechanical means to assist with demolition of two story structure. |
| 220719337BIS | LAFAYETTE AVENUE BRONX | — | ISSUED | 12/16/2024 | 08/20/2025 | — | — |
| M01005541 ↗ | 522 WEST 37 STREET MANHATTAN | Full Demolition | Signed-off | 05/21/2024 | 07/14/2025 | Use of Mechanical Demolition Equipment as per plans filed herewith. This application is filed in conjunction with M01005541-I1. | |
| M00672650 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Permit Issued | 02/03/2022 | 06/25/2025 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence … |
| M00672697 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 02/03/2022 | 06/24/2025 | Design PLAN B ENGINEERING | Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence … |
| B01202563 ↗ | 652 KENT AVENUE BROOKLYN | Alteration | Permit Issued | 04/03/2025 | 05/16/2025 | THE ENCLOSED PLANS ILLUSTRATE THE SCOPE, SEQUENCE, AND MEANS AND METHODS FOR THE COMPLETE DEMOLITION OF THE MASONRY FENCE AND CONCRETE MASON… | |
| M00900002 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2025 | 04/28/2025 | INSTALLATION OF TEMPORARY BRACING TO SUPPORT EXISTING TUNNEL TO REMAIN, FILED IN CONJUNCTION WITH FULL DM-123917299. | |
| M00947625 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2023 | 02/04/2025 | PARTIAL DEMOLITION AT THE EXISTING 2-STORY SECTION (ANNEX) OF THE EXISTING 7-STORY BUILDING (SERVICE BUILDING), INCLUDING REMOVAL OF NON-STR… | |
| M01154934 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 12/23/2024 | 12/31/2024 | — | Magni Placement to assist in lifting demolition equipment and materials in conjunction with Demolition job# 123917299 . This applications in… |
| Q00937649 ↗ | 32-11 HARPER STREET QUEENS | Full Demolition | Signed-off | 09/27/2023 | 10/07/2024 | Filer EXPEDITE DEM INC | full demolition of one story structure aka Building B-Arterial Storage, using full mechanical means. |
| Q00937653 ↗ | 32-11 HARPER STREET QUEENS | Full Demolition | Signed-off | 10/31/2023 | 10/07/2024 | full demolition of one story structure aka bldg C-Fleet Storage, using mechanical means | |
| M01107483 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 09/25/2024 | 09/27/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | SOE - Berming and Bracing work as shown on plan set filed herewith. No change in use, egress, or occupancy under this application. In conju… |
| 123917299BIS | 180 FT WASHINGTON AVENUE MANHATTAN | — | ISSUED | 09/20/2024 | 09/20/2024 | — | EQ |
| Q00937648 ↗ | 32-11 HARPER STREET QUEENS | Full Demolition | Signed-off | 09/26/2023 | 09/10/2024 | Filer EXPEDITE DEM INC | mechanical means equipment will be used in accordance with approved demolition plans. |
| B00934868 ↗ | 472 2 AVENUE BROOKLYN | Full Demolition | Signed-off | 11/07/2023 | 08/11/2024 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical means to assist with site demolition |
| M01030004 ↗ | 125 WALKER STREET MANHATTAN | Alteration | Signed-off | 04/16/2024 | 08/01/2024 | Design PLAN B ENGINEERING | Non- Structural exterior wall removal and infill as shown on drawings filed herewith. No change in use, egress, or occupancy under this appl… |
| M01006848 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 05/01/2024 | 07/12/2024 | Design THE LIRO GROUP Owner DDC Filer JAM CONSULTANTS, INC. | Infills for windows, doors, and bridges, interior non load bearing removals in cellar as shown on drawings filed herewith. No change in … |
| M00938938 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 07/09/2024 | Design ARRAY ARCHITECTS | USE OF MECHANICAL EQUIPMENT FOR INTERIOR DEMOLITION, FILED SEPARATELY UNDER M00938938-S2. |
| M00938943 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 07/09/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: HVAC removals throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupan… |
| X01033977 ↗ | 2131 HART STREET BRONX | Alteration | Signed-off | 05/10/2024 | 07/08/2024 | Design BEYER BLINDER BELLE | Filing for removal of interior finishes, wood and shingle, roof systems, wood framing, and stairs and the protection and salvage of select b… |
| 123908511BIS | 10 WEST 57 STREET MANHATTAN | — | ISSUED | 06/06/2023 | 06/28/2024 | — | EQ |
| 123908520BIS | 10 WEST 57 STREET MANHATTAN | — | ISSUED | 05/31/2023 | 06/28/2024 | — | EQ |
| 123908539BIS | 6 WEST 57 STREET MANHATTAN | — | ISSUED | 05/31/2023 | 06/28/2024 | — | EQ |
| 123916478BIS | 145-125 WHITE STREET MANHATTAN | — | ISSUED | 04/02/2024 | 06/26/2024 | — | — |
| 123916487BIS | 145-125 WHITE STREET MANHATTAN | — | ISSUED | 04/17/2023 | 06/26/2024 | — | — |
| B00934520 ↗ | 472 2 AVENUE BROOKLYN | Full Demolition | Signed-off | 01/24/2024 | 06/25/2024 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | use of mechanical means to be used in accordance with approved full demolition plans. |
| B00934538 ↗ | 472 2 AVENUE BROOKLYN | Full Demolition | Signed-off | 11/09/2023 | 06/25/2024 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | full demolition of one story structure aka as building B-J2, using hand held and mechanical means. |
| B00934556 ↗ | 472 2 AVENUE BROOKLYN | Full Demolition | Signed-off | 11/24/2023 | 06/25/2024 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | full demolition of one story structure aka building C-N2, using hand held and mechanical means. |
| B01021852 ↗ | 472 2 AVENUE BROOKLYN | Full Demolition | Signed-off | 03/26/2024 | 06/25/2024 | Design ANCORA ENGINEERING, PLLC Filer EXPEDITE DEM INC | mechanical means to assist with demolition in accordance with approved DM plans. |
| M00817189 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 03/13/2023 | 06/21/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | SOE work as shown on drawing filed herewith. No change in use, egress, or occupancy under this application. Filed in conjunction with full d… |
| M01052523 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 05/23/2024 | 06/21/2024 | Design PLAN B ENGINEERING | Filing for scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. |
| M08004381 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 12/09/2022 | 06/21/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Tel… |
| M08004404 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 11/22/2022 | 06/21/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Tel… |
| M08008639 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 12/28/2022 | 06/21/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | Temp bracing and vertical shoring work as shown on drawings filed herewith. No change in use, egress or occupancy under this application. |
| M08008646 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 03/08/2024 | 06/21/2024 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | South Tower Shoring/Bracing as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. |
| S00977561 ↗ | VICTORY BOULEVARD STATEN ISLAND | Full Demolition | Permit Issued | 01/11/2024 | 06/11/2024 | Owner Arthur Kill Power LLC Filer EXPEDITE DEM INC | construction fence will be placed to protect during full demolition |
| M01023207 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2024 | 05/20/2024 | INSTALLATION OF GIN POLE FOR MATERIAL LIFTING DURING DEMOLITION, FILED SEPARATELY. | |
| M00920932 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/28/2024 | Design ARRAY ARCHITECTS Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on floors 4-8 of Eye Research, in the existing building. No change… |
| M00921008 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/28/2024 | Design ARRAY ARCHITECTS Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 4th floor of Eye Institute, in the existing hospital building. … |
| M00938734 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 03/28/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: HVAC ductwork removals on floors 4-8 of Eye Research, in the existing building. No change to use, egress or occupa… |
| M00938877 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 03/28/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: HVAC ductwork removals on 4th floor of Eye Institute, in the existing hospital building. No change to zoning, use,… |
| M00835379 ↗ | 6 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 03/07/2023 | 03/19/2024 | INSTALLATION OF TEMPORARY 8' HIGH CONSTRUCTION FENCE | |
| M00837149 ↗ | 10 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 03/07/2023 | 03/19/2024 | INSTALLATION OF 8' HIGH TEMPORARY CONSTRUCTION FENCE | |
| M00837155 ↗ | 10 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 03/07/2023 | 03/19/2024 | INSTALLATION OF TEMPORARY 8' HIGH CONSTRUCTION FENCE | |
| M00938909 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 03/06/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: HVAC removals on 7th & 9th floor of Eye Institute, in the existing building. No change to zoning, use, egress or o… |
| M00938927 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 03/06/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: HVAC removals on 8th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupa… |
| M00921035 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/05/2024 | Design ARRAY ARCHITECTS Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 6th floor of Eye Institute, in the existing building. No change… |
| M00921047 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/05/2024 | Design ARRAY ARCHITECTS Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 7th & 9th floor of Eye Institute, in the existing building. No … |
| M00921057 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 03/05/2024 | Design ARRAY ARCHITECTS Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 8th floor of Eye Institute, in the existing building. No change… |
| M00938894 ↗ | 180 FT WASHINGTON AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2023 | 03/05/2024 | Design JAROS BAUM & BOLLES Filer MUNICIPAL EXPEDITING INC | EYE INST. INTERIOR DEMO; HVAC removals on 6th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupan… |
| B00884657 ↗ | 452 THOMAS S BOYLAND STREET BROOKLYN | Full Demolition | Signed-off | 07/19/2023 | 01/05/2024 | Filer EXPEDITE DEM INC | mechanical means filing to use machines during full demolition of structure |
| M00947399 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 12/15/2023 | 12/19/2023 | Design PLAN B ENGINEERING | Soft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as show… |
| X00846422 ↗ | 774 EAST GUN HILL ROAD BRONX | Full Demolition | Signed-off | 04/06/2023 | 11/02/2023 | Filer EXPEDITE DEM INC | full demolition of one story structure using hand held, and mechanical means to assist. |
| X00846434 ↗ | 774 EAST GUN HILL ROAD BRONX | Full Demolition | Signed-off | 04/25/2023 | 11/02/2023 | Filer EXPEDITE DEM INC | full demolition of accessory structure using hand held and mechanical to assist |
| X00872994 ↗ | 774 EAST GUN HILL ROAD BRONX | Alteration | Signed-off | 05/12/2023 | 10/30/2023 | MECHANICAL EQUIPMENT FOR PARTIAL DEMO OF STEEL BLEACHERS PER PLANS | |
| B00849758 ↗ | 51 COMMERCIAL STREET BROOKLYN | Full Demolition | Signed-off | 06/12/2023 | 09/11/2023 | Filer EXPEDITE DEM INC | mechanical means permit in conjunction with full demolition permit |
| B00910547 ↗ | 452 THOMAS S BOYLAND STREET BROOKLYN | Alteration | Signed-off | 08/08/2023 | 09/08/2023 | THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE AND MEANS FOR THE USE HAND HELD MEANS WITH MECHANICAL EQUIPMENT ASSISTANCE AS SHOWN ON PLANS.… | |
| X00898213 ↗ | 1040 EDGEWATER ROAD BRONX | Full Demolition | Signed-off | 08/10/2023 | 09/07/2023 | Filer EXPEDITE DEM INC | installation of construction fence for emergency work at concrete Plant park |
| B00849729 ↗ | 51 COMMERCIAL STREET BROOKLYN | Full Demolition | Signed-off | 06/09/2023 | 09/01/2023 | Filer EXPEDITE DEM INC | mechanical means permit to be used in conjunction with full demolition permit. |
| 220746325BIS | 2131 HART STREET BRONX | — | ISSUED | 08/09/2023 | 08/09/2023 | — | EQ |
| B00847527 ↗ | 3050 WEST 21 STREET BROOKLYN | Full Demolition | Signed-off | 05/08/2023 | 07/18/2023 | Design HIRANI Filer EXPEDITE DEM INC | Mechanical means filing in conjunction with full demolition. Machines will be used to assist with demolition. |
| M00698550 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 03/18/2022 | 06/22/2023 | Design THE LIRO GROUP Owner DDC Filer JAM CONSULTANTS, INC. | Removal and installation of non-load bearing partition walls, doors, etc. for court house improvement work as shown on drawings filed herewi… |
| M00737010 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 06/17/2022 | 06/22/2023 | Design YSRAEL A. SEINUK, P.C. Owner DDC Filer JAM CONSULTANTS, INC. | Structural work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application. |
| M00737075 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/22/2023 | Design THE LIRO GROUP Owner DDC Filer JAM CONSULTANTS, INC. | GC work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application. |
| M00760589 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 06/22/2022 | 06/22/2023 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | ST filing required for Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscap… |
| M00760639 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 06/22/2022 | 06/22/2023 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | ST filing required for Partial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscap… |
| M08001427 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 09/12/2022 | 06/22/2023 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | Foundation work for support of temporary sidewalk shed as shown on drawings filed herewith. No change in use, egress, or occupancy under thi… |
| M08004411 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 11/30/2022 | 06/22/2023 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | Soft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as show… |
| M08004418 ↗ | 145-125 WHITE STREET MANHATTAN | Alteration | Signed-off | 12/12/2022 | 06/22/2023 | Design PLAN B ENGINEERING Owner DDC Filer JAM CONSULTANTS, INC. | Filing for AES scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. |
| B00879656 ↗ | 51 COMMERCIAL STREET BROOKLYN | Alteration | Permit Issued | 06/07/2023 | 06/15/2023 | Removal of parapet and upper exterior brick, as per plans filed herewith. | |
| Q00611485 ↗ | 55-90 48 STREET QUEENS | Alteration | Signed-off | 10/19/2021 | 06/12/2023 | Design PLAN B ENGINEERING Owner FEDEX GROUND Filer RPO INC. | Filing to use existing 12' high chain-link fence as construction fence for new building application #Q00538865 as per Section 3307.7 Excepti… |
| M00862542 ↗ | 10 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 05/16/2023 | 06/08/2023 | INSTALLATION OF TEMPORARY WINCH, CHUTE, AND PLATFORM IN ASSOCIATION WITH FULL BULDING DEMOLITION UNDER SEPARATE JOB# | |
| M00862657 ↗ | 6 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 05/16/2023 | 06/08/2023 | INSTALLATION OF TEMPORARY WINCH, CHUTE, AND PLATFORM IN ASSOCIATION WITH FULL BULDING DEMOLITION UNDER SEPARATE JOB# | |
| M00658290 ↗ | 10 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 01/19/2022 | 05/01/2023 | Filer HIGHRISE GROUP NYC, INC | Interior demolition to remove all non-structural partition walls, drop ceilings, and flooring for entire structure from cellar to 10th floor |
| M00658294 ↗ | 10 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 01/19/2022 | 05/01/2023 | Filer HIGHRISE GROUP NYC, INC | Interior demolition to remove all non-structural partition walls, drop ceilings, and flooring for entire structure from cellar to 12th floor |
| M00658666 ↗ | 6 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 01/19/2022 | 05/01/2023 | Filer HIGHRISE GROUP NYC, INC | Interior demolition of existing partition walls, drop ceiling, and floor finishing in cellar and on floors 001 thru 011 as per drawings |
| X00485343 ↗ | LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 04/14/2021 | 04/27/2023 | Design NYC DEP | LEGALIZATION OF THE EXISTING BULKHEAD ON THE GROUND LEVEL AND THE EXISTING PUMPING STATION AT SUB-FLOOR LEVELS |
| B00850941 ↗ | 51 COMMERCIAL STREET BROOKLYN | Alteration | Signed-off | 04/11/2023 | 04/19/2023 | Filer EXPEDITE DEM INC | installation of construction fence to protect site, during full demolition under DOBNOW job #'s: B00849729 & B00849758 |
| 322099929BIS | 439 MASPETH AVE BROOKLYN | — | ISSUED | 10/19/2022 | 10/19/2022 | — | EQ |
| 322099885BIS | 226 NEVINS STREET BROOKLYN | — | ISSUED | 09/06/2022 | 10/14/2022 | — | EQ |
| 322099894BIS | 228 NEVINS STREET BROOKLYN | — | ISSUED | 08/15/2022 | 10/14/2022 | — | EQ |