128 CENTRAL PARK SOUTH
MANHATTAN · BIN 1023758
💬 Discuss this project
1925Year Built
16Stories
D4Building Class
R10HZoning
90,425 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized18 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 128 Central Park Owners · 7,675 sf lot · 11.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 13Unit 13A, Unit 13B1 filing
Floor 12
Floor 11Unit 11B3p · 1 filing · 4 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 5A, Unit 5B, Unit 5CD28p · 7 filings · 20 docs
Floor 4
Floor 3Unit 3C1p · 2 filings · 9 docs
Floor 2
Floor 1
CellarSprinkler heads installationUnder Construction2p · 1 filing · 7 docs
Site & exteriorScaffolding installation12p · 5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
128 Central PK Owners5603/22/2026
128 Cent Park Owners Corp C/O de803/21/2026
128 Centra303/21/2026
R.A. Cohen & Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wettling Architects211/04/2026
New Age210/20/2026
Luke Licalzi, P.E.905/31/2024
Rad Design & Architecture302/17/2023
Ammor Architecture308/22/2022
Paul Perdek, Professional Engineering505/04/2022
Hamann Engineering102/10/2021
Green Design103/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service1003/21/2026
Belair903/21/2026
Quick Filing of NY303/21/2026
JM Zoning603/21/2026
Big Orange Expediting203/21/2026
Quick Filing303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E S Concept ConstructionGeneral Contractor804/08/2026
Certified of N YGeneral Contractor503/21/2026
Nova Construction ServiceScaffold407/08/2026
HLP ContractingGeneral Contractor303/21/2026
Create Renovation & Desigspecialty_contractor303/21/2026
Alklem PlumbingFire Protection208/18/2026
Foschi ConstructionGeneral Contractor203/21/2026
Everest ScaffoldingScaffold203/21/2026
Bsue Stone PartnersGeneral Contractor203/21/2026
Hydro MechanicalPlumbing207/08/2026
Chartwell BuildersGeneral Contractor203/21/2026
JDT General ConstructionGeneral Contractor103/21/2026
MZZ ConstructionGeneral Contractor103/21/2026
MZZ WaldolowskiGeneral Contractor103/21/2026
Rockledge ScaffGeneral Contractor103/21/2026
Rockledge ScaffoldGeneral Contractor103/21/2026
Tirbeca BuildGeneral Contractor103/21/2026
Total Structural ConceptsGeneral Contractor103/21/2026
Zale ContractingGeneral Contractor103/21/2026
Amd AssociatesPlumbing103/21/2026
AMNPlumbing103/21/2026
Aquatech PumbPlumbing103/21/2026
Bernard Jablon PlumbingPlumbing103/21/2026
Cape PlumbingPlumbing103/21/2026
DPH Plumbing & HeatingPlumbing103/21/2026
Maximum PlumbingPlumbing103/21/2026
Three Hills Plumbing & HeatingPlumbing103/21/2026
Z W Plumbing & HeatingPlumbing103/21/2026
Royal HVAC Systemsspecialty_contractor107/08/2026
Bent MechanicalPlumbing107/08/2026
Blaze Plumbing & HeatingPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Otec Plumbing & Heating ServicesPlumbing107/08/2026
Optimal ElectricElectrical103/21/2026
Amsterdam ElectricElectrical103/21/2026
Blue Water BuildersGeneral Contractor103/21/2026
Create Renovation & DesignGeneral Contractor107/08/2026
Etna ContractingGeneral Contractor103/21/2026
Eva ConstructionGeneral Contractor103/21/2026
Everest ScaffoldingGeneral Contractor103/21/2026
9J BuilderGeneral Contractor107/29/2008
9J BuildersGeneral Contractor112/17/2008
ABC Interior Exterior ServiceGeneral Contractor109/24/2014
Albert MendozaGeneral Contractor206/08/2018
A & M Warshaw Plumbing & HeatingPlumbing209/15/2016
Angelo AndrewPlumbing109/15/2011
Armtech Plumbing SystemsPlumbing109/21/2007
BNJ ConstructionGeneral Contractor708/01/2019
Central Air ConditioningGeneral Contractor110/26/2016
Coriolis EffectPlumbing112/16/2014
Craftman ConstructionGeneral Contractor208/03/2004
Dba Derya ConstructionGeneral Contractor103/10/1998
DelucGeneral Contractor111/19/2004
DJM NYCGeneral Contractor110/27/2016
Edge General ContractingGeneral Contractor109/08/2005
Flytiger Plumbing & HeatingPlumbing108/06/2008
F & N SolutionsGeneral Contractor109/13/2016
Fred Smith P&HPlumbing106/19/2013
Gateway Plumbing & HeatingPlumbing106/02/1999
GTX Construction AssociatesGeneral Contractor208/05/2015
Gurri InstallationGeneral Contractor109/24/2013
Igx ConstructrionGeneral Contractor106/19/2007
Infrastructure Repair ServicesGeneral Contractor108/16/2017
Isogon InterumGeneral Contractor109/18/2003
Isseks BrothersGeneral Contractor110/06/2000
J. Caiazzo P & HPlumbing111/01/2005
L.L.G. Plumbing & HeatingPlumbing111/02/2017
Marlande HeatingGeneral Contractor109/21/2023
Master P/HPlumbing111/09/2007
Master PLB and HeatingPlumbing107/15/2014
Master Plumbing & HeatingPlumbing112/26/2001
Mishkin ContractingGeneral Contractor110/05/1999
Modular MetalsGeneral Contractor105/10/2010
New York Plumbing & HeatingPlumbing109/27/2013
Nova Construction ServiceGeneral Contractor212/30/2021
Nova PLG & HeatingPlumbing105/04/1998
Nulite Heating, PLGB & Fuel OilPlumbing107/25/2006
NY Interior ConstructionGeneral Contractor106/13/2000
Orbit Plumbing & HeatingPlumbing211/11/2015
Pali Building RestorationGeneral Contractor205/13/2013
Perfect Plumbing & HeatingPlumbing106/14/2000
Peter Miceli PlumbingPlumbing105/12/2010
Pinnacle Plumbing & HeatingPlumbing106/29/2000
Plumbing & Heating DoctorPlumbing108/18/2015
P.S.I. MechanicalPlumbing207/19/2016
Rabor ContractingGeneral Contractor108/21/2014
Royal HVAC SystemsGeneral Contractor105/22/2018
Spring ScaffoldingGeneral Contractor109/15/2003
Spring ScaffoldingGeneral Contractor207/03/2012
Vella InteriorsGeneral Contractor106/19/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746210/20/2026
Jon Libasci3068905/31/2024
Rad Design & Architecture2082302/17/2023
Ammor Architecture3054110/08/2021
Hamann Engineering4949102/10/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/04/2026
Filed — Alteration
PLUMBING WORK ON APT 13A AND 13B RENOVATION/COMBINATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01472671-S2
11/04/2026
Filed — Alteration
PLUMBING WORK ON APT 13A AND 13B RENOVATION/COMBINATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01472671-I1
11/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/20/2026
Filed — Alteration
INSTALL SPRINKLER HEADS OFF EXISTING SPRINKLER/STANDPIPE SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01257158-P1
251 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedAlklem Plumbing08/17/2026
DOB NOWSprinklersPermit IssuedAlklem Plumbing07/14/2026
DOB NOWPlumbingSigned-offBlaze Plumbing & Heating12/04/2023
DOB NOWPlumbingSigned-offOtec Plumbing & Heating Services12/01/2023
DOB NOWGeneral ConstructionSigned-offE S Concept Construction10/30/2023
DOB NOWGeneral ConstructionSigned-offE S Concept Construction10/18/2023
DOB NOWPlumbingSigned-offSuper Plumbers07/07/2023
DOB NOWGeneral ConstructionSigned-offE S Concept Construction06/09/2023
DOB NOWPlumbingSigned-offBent Mechanical03/24/2023
DOB NOWGeneral ConstructionSigned-offCreate Renovation & Desig03/10/2023
DOB NOWMechanical SystemsPermit IssuedCreate Renovation & Desig03/09/2023
DOB NOWPlumbingSigned-offHydro Mechanical02/22/2022
DOB NOWPlumbingSigned-offHydro Mechanical11/09/2021
DOB NOWGeneral ConstructionSigned-offHLP Contracting11/03/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedNova Construction Service07/22/2021
DOB NOWSupported ScaffoldPermit IssuedNova Construction Service07/22/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedNova Construction Service06/11/2021
DOB NOWSidewalk ShedPermit IssuedNova Construction Service06/11/2021
DOB NOWMechanical SystemsSigned-offRoyal HVAC Systems02/11/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/03/2020
BISOTISSUEDMarlande Heating09/21/2023
BISFSISSUEDMarlande Heating09/14/2023
BISOTISSUEDEtna Contracting05/11/2022
BISOTISSUEDEtna Contracting04/12/2022
BISOTISSUEDNova Construction Service12/30/2021
BISOTISSUEDNova Construction Service11/11/2021
BISMHISSUEDBNJ Construction08/01/2019
BISOTISSUEDBNJ Construction07/11/2019
BISOTISSUEDBNJ Construction05/08/2019
BISPLISSUEDDPH Plumbing & Heating03/05/2019
BISOTISSUEDBNJ Construction10/25/2018
BISOTISSUEDJDT General Construction09/19/2018
BISMHISSUEDAlbert Mendoza06/08/2018
BISPLISSUEDV.A.L. Plumbing & Heating05/24/2018
BISMHISSUEDRoyal HVAC Systems05/22/2018
BISOTISSUEDJDT General Construction05/17/2018
BISPLISSUEDZ.W. Plumbing & Heating01/10/2018
BISPLISSUEDL.L.G. Plumbing & Heating11/02/2017
BISOTISSUEDAlbert Mendoza08/18/2017
BISOTISSUEDInfrastructure Repair Service08/16/2017
+ 30 more permits on file
1 project · most recent 11/04/2026
Air Conditioning Systems
FiledStatusContractorScope
11/04/2026——Air Conditioning Systems
1 project · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026Permit IssuedAlklem Plumbing—
1 project · most recent 11/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/04/2026——Gas, Water/Sanitary
16 projects · most recent 02/03/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
02/03/2026CompleteAmsterdam ElectricHVAC Wiring
01/23/2025CompleteNY City ElectricGeneral Wiring
05/09/2024Permit IssuedOptimal ElectricGeneral Wiring
05/01/2024CompleteOptimal ElectricGeneral Wiring
03/22/2023CompleteE & M Electrical NYGeneral Wiring
03/09/2023CompleteLina Electric—
08/16/2022CompleteTactical ElectricGeneral Wiring
06/10/2021CompleteTop Shelf Electric—
01/20/2021Permit IssuedEis Electric Corp DbaGeneral Wiring
02/25/2020CompleteBorowide Elect'l Contractors—
08/08/2019Permit IssuedKwong Ming ElectricHVAC Wiring
05/20/2019Permit IssuedArb ElectricHVAC Wiring
05/25/2018Permit IssuedY.S. ElectricGeneral Wiring
01/02/2018CompleteEis Electric Corp DbaGeneral Wiring
01/02/2018CompleteResponse Electric—
2 projects · most recent 05/04/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/04/2022Permit IssuedNova Construction ServiceScaffold
06/11/2021Permit IssuedNova Construction ServiceSidewalk Shed
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
11/04/2026Tenant Protection Plan Compliance—special
10/09/2026Standpipe SystemsStephen Shishkospecial
10/09/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
10/09/2026Tenant Protection Plan ComplianceStephen Shishkospecial
10/09/2026Final—progress
10/09/2026Sprinkler SystemsStephen Shishkospecial
10/09/2026Tenant Protection Plan Compliance—special
07/16/2025Sprinkler SystemsStephen Shishkospecial
07/16/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/16/2025Standpipe SystemsStephen Shishkospecial
07/16/2025Tenant Protection Plan ComplianceStephen Shishkospecial
06/03/2024Energy Code Compliance Inspectionsjon libasciprogress
06/03/2024Fire-Resistant Penetrations and Jointsjon libascispecial
04/25/2024Fire-Resistant Penetrations and Jointsjon libascispecial
04/25/2024Energy Code Compliance Inspectionsjon libasciprogress
04/24/2024Energy Code Compliance Inspectionsjon libasciprogress
04/24/2024Fire-Resistant Penetrations and Jointsjon libascispecial
03/21/2024Lighting controlsjon libascienergy_progress
03/21/2024Fire-Resistance Rated Constructionjon libasciprogress
03/21/2024FinalPAUL SELETSKYprogress
03/21/2024Lighting in dwelling unitsjon libascienergy_progress
03/21/2024Interior lighting powerjon libascienergy_progress
03/21/2024Energy Code Compliance Inspectionsjon libasciprogress
03/21/2024Fire-Resistant Penetrations and Jointsjon libascispecial
03/11/2024FinalPAUL SELETSKYprogress
Latest 25 of 41.
863 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account