| Owner | Filings | Most Recent |
|---|---|---|
| Jones Lang Lasalle | 507 | 03/22/2026 |
| RXR PROPERTY MANAGEMENT | 268 | 07/08/2026 |
| RXR REALTY | 137 | 09/13/2026 |
| RXR | 13 | 07/08/2026 |
| UBS FINANCIAL | 10 | 07/08/2026 |
| PLATINUM SERVICES NY | 7 | 07/08/2026 |
| C & K 1285 OWNER LLC | 1 | 03/22/2026 |
| MANHATTAN | 1 | 03/22/2026 |
| TRI-STAR CONSTRUCTION COR | 1 | 03/22/2026 |
| AMERICON CONSTRUCTION | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GENSLER | 22 | 07/29/2026 |
| ROBERT DERECTOR ASSOCIATES | 10 | 07/29/2026 |
| MG ENGINEERING D.P.C. | 3 | 06/25/2026 |
| COSENTINI ASSOCIATES | 27 | 06/04/2026 |
| JAROS BAUM & BOLLES | 5 | 02/26/2026 |
| SOCOTEC, INC. | 1 | 01/13/2026 |
| TITAN ENGINEERS PC | 1 | 12/19/2025 |
| TAN ENGINEERING PC | 5 | 12/18/2025 |
| SEVERUD ASSOCIATES | 5 | 12/12/2025 |
| CLIFFORD DIAS, PE, PC | 12 | 12/10/2025 |
| TED MOUDIS ASSOCIATES | 1 | 07/29/2025 |
| RICHARD PUSWALD PE | 5 | 06/05/2025 |
| VERDERAME-CALE ARCHITECTURE | 1 | 02/06/2025 |
| A-SQUARED | 3 | 02/04/2025 |
| MURDOCH ENGINEERING | 1 | 01/27/2025 |
| ALAN FELD | 1 | 09/06/2024 |
| BUILDING STUDIO ARCHITECTS | 1 | 06/07/2024 |
| THORNTON TOMASETTI | 1 | 05/31/2024 |
| GOLDMAN COPELAND ASSOCIATES | 7 | 04/08/2024 |
| HALSEY MCCORMACK HELMER INC | 2 | 02/16/2024 |
| CHIPMAN DESIGN ARCHITECTURE GROUP P | 1 | 08/07/2023 |
| FMC ENGINEERING, PC | 11 | 12/29/2022 |
| DIAZ ARCHITECTS INC.,PA | 5 | 06/30/2022 |
| KARBON ENGINEERING SERVICES, LLC | 1 | 05/12/2022 |
| THE VSA GROUP | 1 | 12/14/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 170 | 03/21/2026 |
| RIZZO GROUP | 15 | 03/21/2026 |
| ANZALONE ARCHITECTURE | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| ROBERT R BISACCIA | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 10 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| UNIVERSAL SIGNS SERVICE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HENEGAN CONSTRUCTION CO., | General Contractor | 24 | 07/08/2026 |
| RXR CONSTRUCTION SERV LLC | General Contractor | 14 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 14 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 14 | 07/08/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 11 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 10 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 9 | 08/26/2026 |
| JAMES E FITZGERALD INC | General Contractor | 8 | 07/08/2026 |
| AMBASSADOR CONSTRUCTION C | General Contractor | 8 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 8 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 7 | 08/21/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 7 | 07/08/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 4 | 07/08/2026 |
| SATO CONSTRUCTION CO.INC | General Contractor | 4 | 03/21/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 4 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 4 | 07/08/2026 |
| A. BONADUCE, INC | General Contractor | 4 | 07/08/2026 |
| BOWER, JOHN | Fire Protection | 3 | 03/21/2026 |
| CITY/SUBURBAN PLBG CORP | Plumbing | 2 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 2 | 08/25/2026 |
| AIRPROS, INC | General Contractor | 2 | 04/09/2026 |
| HARBOUR MECHANICAL CORP | General Contractor | 2 | 03/21/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 2 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 15 | 07/29/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 42 | 07/23/2026 |
| SOCOTEC ENGINEERING | 4983 | 3 | 06/25/2026 |
| MEP INSPECTIONS, INC | 1102 | 5 | 02/26/2026 |
| TAN ENGINEERING, P.C. | 1291 | 5 | 12/18/2025 |
| METROSPEC SIA | 6420 | 1 | 09/06/2024 |
| CONSULTING AND TESTING SE | 6152 | 2 | 04/08/2024 |
| HITECH MANAGEMENT | 778 | 12 | 12/29/2022 |
| SPECIAL INSPECTION SERVIC | 1200 | 10 | 06/24/2022 |
| ENVIRONMENTAL CODE CONSUL | 5516 | 4 | 05/29/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 08/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/17/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/13/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 04/21/2026 |
| DOB NOW | Plumbing | Permit Issued | MACCARONE PLUMBING INC | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 03/31/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 03/25/2026 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 01/23/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 01/22/2026 |
| DOB NOW | Plumbing | Signed-off | LAB PLBG & HTG CO INC | 01/14/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 12/30/2025 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 12/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 12/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 10/23/2025 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 09/26/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 09/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AIRPROS, INC | 09/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 09/08/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 09/03/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 08/22/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 08/11/2025 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 08/05/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/25/2025 |
| DOB NOW | Sprinklers | Signed-off | PREFERRED SPKLR AND MECH | 07/23/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/23/2025 |
| DOB NOW | Plumbing | Signed-off | PREFERRED MECHANICAL INC | 07/23/2025 |
| DOB NOW | Plumbing | Signed-off | LAWRENCE J. LEVINE | 07/10/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 07/10/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 07/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/08/2025 |
| DOB NOW | Sprinklers | Signed-off | PREFERRED MECHANICAL INC | 07/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/08/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/07/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/07/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/18/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 06/11/2025 |
| DOB NOW | Supported Scaffold | Signed-off | EAGLE SCAFFOLDING SVCS IN | 06/05/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/17/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Above Air SCW-005 600 CFM · Wshp ×2 MC-004 500 CFM · Wshp ×1 MCW-007 1,350 CFM · Wshp ×1 SCW-005S5-7-0000H-EC-00-ED0-SA 1,600 CFM · Crac Unit ×2 MCW-004S5-7-MG000-EC-00-UF1-XS 500 CFM · Crac Unit ×1 MCW-007S5-7-MG000-EC-00-UF1-XS 1,350 CFM · Crac Unit ×1 Heat / Cool Climatemaster SC-12 400 CFM · Wshp ×27 SC-18 600 CFM · Wshp ×11 SC-48 1,600 CFM · Wshp ×8 SC-36 1,200 CFM · Wshp ×5 SC-24 800 CFM · Wshp ×2 SC-30 1,000 CFM · Wshp ×2 |
| 09/19/2025 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation |
| 09/06/2023 | — | — | Associated Ducts and Piping | — |
| 06/03/2022 | Permit Issued | HENEGAN CONSTRUCTION CO., | Others | Other N/A N/A ×1 |
| 05/29/2021 | Permit Issued | JAMES E FITZGERALD INC | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 07/15/2026 | Signed-off | PAR FIRE PROTECTION LLC | 1,958 heads |
| 06/04/2026 | Signed-off | PAR FIRE PROTECTION LLC | 867 heads |
| 09/19/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 36 heads |
| 06/11/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 48 heads |
| 06/03/2022 | — | — | 426 heads |
| 05/29/2021 | Permit Issued | PAR FIRE PROTECTION LLC | 6 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 07/15/2026 | Signed-off | LAB PLBG & HTG CO INC | Water/Sanitary |
| 07/01/2026 | — | — | Water/Sanitary |
| 06/25/2026 | Permit Issued | MACCARONE PLUMBING INC | Storm, Water/Sanitary |
| 06/04/2026 | Signed-off | PREFERRED MECHANICAL INC | Water/Sanitary |
| 09/19/2025 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 06/03/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/28/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 07/13/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 07/13/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 01/15/2026 | Permit Issued | FOREST ELECTRIC CORP. | 2 meters |
| 12/15/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 12/15/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 10/10/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 08/01/2025 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 07/18/2025 | Complete | P.E. STONE INC | General Wiring |
| 07/08/2025 | Complete | PRECISION ELECL CONT CORP | General Wiring |
| 04/01/2025 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 02/18/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | — |
| 11/20/2024 | Complete | ALLRAN ELECTRIC OF NY LLC | — |
| 03/18/2024 | Complete | MATROS AUTOMATED ELEC'L C | General Wiring |
| 03/08/2024 | Complete | MATROS AUTOMATED ELEC'L C | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/19/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Steel |
| 12/12/2025 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/31/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/08/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/05/2026 | Pass-Final Construction Permit Withdrawal | Pass | View ↗ |
| 05/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/02/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/16/2025 | Fail-Final SP - Up to 3 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/27/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/27/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/20/2026 | Shutoff dampers | Ari Kamo | energy_progress |
| 07/20/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 07/20/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 07/20/2026 | Maintenance information | Ari Kamo | energy_progress |
| 07/20/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 07/20/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 07/20/2026 | Lighting controls | Ari Kamo | energy_progress |
| 07/20/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/20/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 07/20/2026 | Final | Ari Kamo | progress |
| 07/20/2026 | Mechanical Systems | Ari Kamo | special |
| 07/16/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/16/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/16/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/29/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/18/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/18/2026 | Mechanical Systems | Ari Kamo | special |
| 06/18/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 06/18/2026 | Final | Ari Kamo | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Latham & Watkins | Office | Cellar, Floors 1, 3, 8, 12–16, 30 | Project M01408897 Project M01405729 Project M01277977 Project M01277943 Project M01277962 Project M01277988 Project M01277993 Project M01277983 Project M01277971 |
| Mizuho | Office | Floors 9, 10 | Project M01250552 |
| UBS | Unknown | Floors 11, 12, Roof | Project M01220926 Project M01230051 Project M00610277 Project M00578511 |
| UBS Broadcast Studio | Unknown | Floor 12 | Project M01219008 |
| UBS Financial Services | Office | Floors 15, 16, 18, 19 | Project M01170943 Project M01170958 Project M00515967 Project M00516069 Project M00220665 Project M00220685 Project M00220730 |
| Paul, Weiss | Office | Floors 2, 20, 25, 30, 34 | Project M01134750 Project M01134746 Project M00801830 Project M00331335 Project M00331370 Project M00331407 Project M00232437 |
| Chopt Creative Salad | Restaurant / Food Service | Floor 1 | Project M01168529 |
| Naya | Restaurant / Food Service | Floor 1 | Project M01107241 Project M01107253 Project M01107258 |
| OCS | Office | Floor 5 | Project M00979382 Project M00979398 |
| Omnicom Creative Studio | Office | Floor 5 | Project M00979365 |
| UBS Group | Office | Floor 12 | Project M00622512 |
| Biolumina | Office | Floors 4–7 | Project M00496542 Project M00496620 |
| Omnicom Group | Office | Floors 4–7 | Project M00496516 |
| UBS Medical | Medical / Healthcare | Cellar | Project M00496820 |
| Landry's | Restaurant / Food Service | Cellar | Project M00328611 Project M00347835 |
| Mastro's Steakhouse | Restaurant / Food Service | Cellar | Project M00347783 |