| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01349325 ↗ | 29 EAST 20 STREET MANHATTAN | Alteration | Permit Issued | 01/29/2026 | 09/18/2026 | Contractor AERIAL DESIGN BUILD SVCS | PLUMBING MODIFICATIONS FOR THE RESTAURANT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01278739 ↗ | 150 SPRING STREET MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 09/09/2026 | Design VIRALINE ARCHITECTURE LLP Owner Madison Propco, LLC Contractor KING ROSE OF NY, INC | RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE TO USE , OCCUPANCY OR EGRESS. |
| M01349488 ↗ | 140 WEST STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 09/03/2026 | Contractor S & L PLUMBING INC | filed herewith installation of sprinkler heads and associated piping. no change of use, occupancy or egress. |
| M01427626 ↗ | 83 THOMPSON ST MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/27/2026 | Design TWIG CONSULTING ENGINEERS PC Owner CITY URBAN REALTY Contractor PA BUILDERS, INC | Modification to existing HVAC system |
| M01433470 ↗ | 206 EAST 95 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/25/2026 | Design BENDIX ENGINEERING, P.C. Owner RUPPERT HOUSING CO INC. Contractor MILLER PLBG & HTG INC Filer JENNY FLORES EXPEDITING | REMOVE, REPLACE AND INSTALL NEW BOILER & COMPONENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| B01291502 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 08/20/2026 | Design TWIG CONSULTING ENGINEERS PC Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01349325 ↗ | 29 EAST 20 STREET MANHATTAN | Alteration | Permit Issued | 01/29/2026 | 09/18/2026 | Contractor AERIAL DESIGN BUILD SVCS | PLUMBING MODIFICATIONS FOR THE RESTAURANT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01278739 ↗ | 150 SPRING STREET MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 09/09/2026 | Design VIRALINE ARCHITECTURE LLP Owner Madison Propco, LLC Contractor KING ROSE OF NY, INC | RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE TO USE , OCCUPANCY OR EGRESS. |
| M01349488 ↗ | 140 WEST STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 09/03/2026 | Contractor S & L PLUMBING INC | filed herewith installation of sprinkler heads and associated piping. no change of use, occupancy or egress. |
| M01427626 ↗ | 83 THOMPSON ST MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/27/2026 | Design TWIG CONSULTING ENGINEERS PC Owner CITY URBAN REALTY Contractor PA BUILDERS, INC | Modification to existing HVAC system |
| M01433470 ↗ | 206 EAST 95 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 08/25/2026 | Design BENDIX ENGINEERING, P.C. Owner RUPPERT HOUSING CO INC. Contractor MILLER PLBG & HTG INC Filer JENNY FLORES EXPEDITING | REMOVE, REPLACE AND INSTALL NEW BOILER & COMPONENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| B01291502 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 08/20/2026 | Design TWIG CONSULTING ENGINEERS PC Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01130619 ↗ | 317 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 02/13/2025 | 08/18/2026 | Owner 304-310 W. 14 REALTY LLC Contractor CPM BUILDERS INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE (VC LOUNGE) IN THE CELLAR. NO CHANGE IN USE, EGRESS, OR O… |
| B01424405 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 08/13/2026 | 08/17/2026 | Design RIP CONSTRUCTION CONSULTANTS Owner 9 DEKALB FEE OWNER LLC Contractor COOPER WORKS INC | GENERAL CONSTRUCTION FOR 1ST FLOOR BUSINESS RESTAURANT TENANT-FIT-OUT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O… |
| B01430474 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 08/11/2026 | 08/17/2026 | Design GACE DPC Owner 9 DEKALB FEE OWNER LLC Contractor COOPER WORKS INC | STRUCTURAL STEEL SUPPORT WORK ON 1ST FLOOR ASSOCIATED WITH BUSINESS RESTAURANT TENANT-FIT-OUT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CH… |
| B01430718 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 08/11/2026 | 08/17/2026 | Design TAN ENGINEERING PC Owner 9 DEKALB FEE OWNER LLC Contractor COOPER WORKS INC | NEW MECHANICAL INSTALLATION WORK ASSOCIATED WITH 1ST FLOOR BUSINESS RESTAURANT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG… |
| B01109064 ↗ | 84 BELMONT AVENUE BROOKLYN | Alteration | Permit Issued | 04/02/2025 | 08/12/2026 | Design JarmelKizel Architects Contractor COOPER WORKS INC | Removal and renovation of interior non-load bearing partitions as per plans filed herewith. |
| B01123263 ↗ | 445 GRAND AVENUE BROOKLYN | Alteration | Permit Issued | 10/16/2024 | 08/11/2026 | Design CHRISTOPHER TEETER Contractor CHELSEA DEVELOPERS LLC Filer CHRISTOPHER TEETER,RA | SPRINKLER WORK IN CONNECTION WITH PROPOSED GENERAL CONSTRUCTION. |
| B01430721 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 07/29/2026 | 08/11/2026 | Design TAN ENGINEERING PC Owner 9 DEKALB FEE OWNER LLC Contractor ACCURATE MECHANICAL INC | MODIFICATION OF EXISTING SPRINKLER SYSTEM ASSOCIATED WITH 1ST FLOOR BUSINESS RESTAURANT TENANT-FIT-OUT RENOVATIONS AS PER PLANS FILED HEREWI… |
| M01435047 ↗ | 170 THOMPSON STREET MANHATTAN | Alteration | Filed — no permit on record | 08/10/2026 | — | Design CONCEPT DESIGN GROUP | — |
| M01384882 ↗ | 120 WEST 45 STREET MANHATTAN | Alteration | Permit Issued | 04/28/2026 | 08/07/2026 | Design UG ENGINEERING SERVICES PC Owner KAMBER MANAGEMENT LLC Contractor A & M WARSHAW PLBG & HTG | PLUMBING WORK ASSOCIATED WITH RESTAURANT SPACE ROSA MEXICANO RENOVATIONS FOR NEW PLUMBING FIXTURES TO EXISTING LINES AS PER PLANS FILED HERE… |
| B01428116 ↗ | 9 DEKALB AVENUE BROOKLYN | Alteration | Permit Issued | 07/29/2026 | 08/06/2026 | Design TAN ENGINEERING PC Owner 9 DEKALB FEE OWNER LLC Contractor ACCURATE MECHANICAL INC | NEW PLUMBING WORK ASSOCIATED WITH 1ST FLOOR BUSINESS RESTAURANT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN… |
| M01362921 ↗ | 120 WEST 45 STREET MANHATTAN | Alteration | Permit Issued | 03/10/2026 | 08/06/2026 | Design SBLM ARCHITECTS, PC Owner KAMBER MANAGEMENT LLC Contractor METRO PARTNERS GROUP INC | GENERAL CONSTRUCTION FOR TAQUERIA RENOVATIONS INCLUDING REPLACEMENT OF INTERIOR FINISHES & EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M01404407 ↗ | 52 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/14/2026 | 07/29/2026 | Design TAN ENGINEERING PC Contractor PA BUILDERS, INC Filer MARIN ARCHITECTS, P.C. | Interior renovation to existing cellar commercial space. No change of use, occupancy or egress. Renovation includes new finishes, fixtures a… |
| M01423042 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 07/21/2026 | 07/29/2026 | Design TWIG CONSULTING ENGINEERS PC Contractor PA BUILDERS, INC | Interior renovation of existing commercial space, new eating and drinking establishment, new walls, floors and ceiling finishes. |
| B01109067 ↗ | 84 BELMONT AVENUE BROOKLYN | Alteration | Permit Issued | 04/15/2025 | 07/28/2026 | Design JarmelKizel Architects Contractor COOPER WORKS INC | Modification to HVAC systems. Installation of of type 1 hood and exhaust at 1st floor kitchen. No change in use, egress or occupancy. |
| M01393294 ↗ | 1450 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/21/2026 | 07/23/2026 | Design PAUL DENIS ASSOCIATES Owner T.M.S. Management Co. Contractor I-RESOLVE CONSTRUCTION GR | MECHANICAL SYSTEM WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT SPACE TENANT FIT OUT RENOVATIONS & NEW UNITS ON ROOF AS PER PLANS FILED HEREWITH… |
| M01393327 ↗ | 1450 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/21/2026 | 07/22/2026 | Design PAUL DENIS ASSOCIATES Owner T.M.S. Management Co. Contractor TRISTAR PLUMBING & HTG IN | PLUMBING WORK ASSOCIATED WITH 1ST FLOOR RESTAURANT SPACE TENANT FIT OUT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR… |
| M01393347 ↗ | 1450 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/21/2026 | 07/22/2026 | Design STRATFORD ENGINEERING Owner T.M.S. Management Co. Contractor I-RESOLVE CONSTRUCTION GR | STRUCTURAL SUPPORTS TO ENLARGE EXISTING INTERIOR OPENING AT 1ST FLOOR RESTAURANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O… |
| M01408540 ↗ | 5 WEST 95 STREET MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 07/21/2026 | Design FEINGOLD AND GREGORY ARCH. Owner R.E.M. RESIDENTIAL Contractor ST TONE MANAGEMENT INC | RENOVATE REAR APARTMENT AT 4TH FLOOR. REPLACE KTTE AND BATH FIXTURES. ADD DISHWASHER |
| M01418562 ↗ | 580 5 AVENUE MANHATTAN | Alteration | Permit Issued | 06/29/2026 | 07/20/2026 | Design METROSPEC Contractor ARON CONTRACTING INC | PROPOSED INTERIOR RENOVATION WORK AT SUIE 610, GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, MINOR PLUMBING WORK, AND THE REPLACEMENT OF FINI… |
| M01409530 ↗ | 800 3 AVENUE MANHATTAN | Alteration | Permit Issued | 06/30/2026 | 07/16/2026 | Design KENDALL ENGINEERING PC Owner SL Green Contractor COOPER WORKS INC Filer DESARNO ASSOCIATES, INC. | Type-I commercial Kitchen exhaust hood system complete with UL- Listed hood with integral fire suppression systems, Type-I compliant grease … |
| M01409346 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Filed — no permit on record | 06/29/2026 | — | Design TWIG CONSULTING ENGINEERS PC Filer GARO GUMUSYAN | — |
| M01409347 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Filed — no permit on record | 06/29/2026 | — | Design TWIG CONSULTING ENGINEERS PC Filer GARO GUMUSYAN | — |
| M01409350 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Filed — no permit on record | 06/29/2026 | — | Design TWIG CONSULTING ENGINEERS PC Filer GARO GUMUSYAN | — |
| M01261193 ↗ | 151 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2025 | 06/24/2026 | Design MOTOKO TISZA Contractor ANDREU REMODELING CORP Filer RICHARD LEWIS ARCHITECT | Modify existing and install new plumbing fixtures in existing apartment as per plan. No change to use, egress or ocupancy under this applica… |
| M01392421 ↗ | 1450 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/26/2026 | 06/23/2026 | Design Joseph F Sarra Jr, Architect Owner T.M.S. Management Co. Contractor I-RESOLVE CONSTRUCTION GR | GENERAL CONSTRUCTION FOR 1ST FLOOR EATING & DRINKING ESTABLISHMENT TENANT FIT OUT RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| S01408786 ↗ | 1510 HYLAN BOULEVARD STATEN ISLAND | Alteration | Filed — no permit on record | 06/23/2026 | — | Design TWIG CONSULTING ENGINEERS PC Owner FOREST PLAZA LLC | — |
| M01378696 ↗ | 1628 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 06/18/2026 | — | Design TWIG CONSULTING ENGINEERS PC | — |
| M01360549 ↗ | 1482 3 AVENUE MANHATTAN | Alteration | Permit Issued | 06/08/2026 | 06/16/2026 | Design A&M CONSULTING Contractor KELAIR INC | PROPOSE TO INSTALL A SPLIT AIR COOLED AC UNIT AS PER THE PLANS SUBMITTED HEREWITH. |
| M01318379 ↗ | 170 2 AVENUE MANHATTAN | Alteration | Permit Issued | 11/17/2025 | 06/12/2026 | Design MOTOKO TISZA Contractor NYC DESIGN & RENO LLC Filer RICHARD LEWIS ARCHITECT | Modifications to bathroom and kitchen in apt 6B. No change to use, egress or occupancy under this application. |
| M01156612 ↗ | 304 WEST 89 STREET MANHATTAN | Alteration | Permit Issued | 02/10/2026 | 06/09/2026 | Contractor VRF SOLUTIONS LLC | Decommissioning of existing oil fired boiler. Installation of new heat pump heating/cooling system with associated ducts, piping and control… |
| X01383123 ↗ | 2500 BOSTON ROAD BRONX | Alteration CO | Permit Issued | 05/14/2026 | 06/04/2026 | Design GINO O. LONGO, ARCHITECT Contractor RUGOVA GROUP LLC | Application here by filled for plumbing work to be done in conjunction with application #: X01383123-I1. No change in occupancy, egress or b… |
| M01393355 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Filed — no permit on record | 06/01/2026 | — | Design TWIG CONSULTING ENGINEERS PC Owner HINES INTEREST LP Filer CONCEPT DESIGN GROUP | — |
| M01277126 ↗ | 708 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 10/20/2025 | 05/19/2026 | Design FZAD Contractor UPPER RESTORATION INC | APPLICATION FOR INTERIOR RENOVATION & COMBINING APARTMENTS 2G & 3G. DEMOLITION OF NON-BEARING WALLS, PLUMBING FIXTURES. INSTALL NEW INTERIOR… |
| Q01355311 ↗ | 227-15 NORTH CONDUIT AVENUE QUEENS | Alteration | Permit Issued | 04/15/2026 | 05/14/2026 | Design TWIG CONSULTING ENGINEERS PC Owner Epic Pharma, LLC Contractor BUILDWISE PLUMBING HEATING Filer PSE CONSULTING LLC | Per LL 152 of 2016 testing; removal of non compliant gas piping and replacement piping on first floor and roof level as shown on plans. |
| M01384888 ↗ | 120 WEST 45 STREET MANHATTAN | Alteration | Permit Issued | 04/28/2026 | 05/11/2026 | Design UG ENGINEERING SERVICES PC Owner KAMBER MANAGEMENT LLC Contractor A & M WARSHAW PLBG & HTG | PLUMBING WORK ASSOCIATED WITH TAQUERIA SPACE RENOVATIONS FOR NEW PLUMBING FIXTURES TO EXISTING LINES AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M01241096 ↗ | 304 WEST 89 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/09/2026 | — | Design TWIG CONSULTING ENGINEERS PC Filer PSE CONSULTING LLC | — |
| M01267057 | 102 NORTH END AVENUE MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 05/01/2026 | Design CES ENGINEERING LLC Contractor CERTIFIED OF N.Y. INC Filer J.A. EXPEDITING, LLC | HEREBY FILING FOR THE REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES AND THE RELOCATION AND INSTALLATION OF SPRINKLER HEADS. … |
| M01361765 ↗ | 126 WATER STREET MANHATTAN | Alteration | Filed — no permit on record | 04/28/2026 | — | Design TWIG CONSULTING ENGINEERS PC Filer PSE CONSULTING LLC | — |
| M01384885 ↗ | 120 WEST 45 STREET MANHATTAN | Alteration | Filed — no permit on record | 04/28/2026 | — | Design UG ENGINEERING SERVICES PC Owner KAMBER MANAGEMENT LLC | — |
| B01207808 ↗ | 140 5 AVENUE BROOKLYN | Alteration | Permit Issued | 04/30/2025 | 04/15/2026 | Design ROSENTHAL ENGINEERING PLLC Owner BROWNSTONE MANAGEMENT Contractor ERGO DEVELOPMENT MGMNT Filer RICHARD LEWIS ARCHITECT | Interior renovation of existing retail store as per plan for the sale of coffee and pastries. Interior partitions and finishes. Plumbing and… |
| M01334685 ↗ | 137 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 04/08/2026 | Design TAN ENGINEERING PC Contractor VMC PLUMBING & HEATING IN | PLUMBING WORK ASSOCIATED WITH RENOVATION OF EXISTING COMMERCIAL SPACE FOR 'SOFTVILLE' AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS … |
| B00700650 ↗ | 990 3 AVENUE BROOKLYN | Alteration | Permit Issued | 07/20/2022 | 03/30/2026 | Design TEI OF WA Owner COSTCO WHOLESALE #318 Contractor A. M. PLUMBING COMPANY Filer JM ZONING, LLC. | PROPOSE TO REPLACE EXISTING BOILER AT ROOF MECHANICAL ROOM AS PER PLANS SUBMITTED HEREWITH. |
| M01362893 ↗ | 120 WEST 45 STREET MANHATTAN | Alteration | Permit Issued | 03/10/2026 | 03/30/2026 | Design SBLM ARCHITECTS, PC Owner KAMBER MANAGEMENT LLC Contractor METRO PARTNERS GROUP INC | GENERAL CONSTRUCTION RESTAURANT ROSA MEXICANO RENOVATIONS INCLUDING REPLACEMENT OF INTERIOR FINISHES & EQUIPMENT AS PER PLANS FILED HEREWITH… |
| Q00900218 ↗ | 62-01 68 AVENUE QUEENS | Alteration | Permit Issued | 10/12/2023 | 03/24/2026 | Design MATTHEW RUOPOLI, AIA Contractor RIGO MANAGEMENT USA INC | TO SHOW EXT'G 1/2 BATHROOM ON CELLAR FLOOR, (2 SINK, 2TOILETS & 2SHOWERS) AND KITCHEN (1 SINK) AND 1 WASHER MACHINE ON FIRST FLOOR, (1SINK… |
| M01334664 ↗ | 137 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 03/12/2026 | 03/20/2026 | Design SARAH CARPENTER Contractor PA BUILDERS, INC | GENERAL CONSTRUCTION FOR INTERIOR RENOVATIONS & EXTERIOR STOREFRONT RENOVATIONS OF EXISTING COMMERCIAL SPACE FOR SOFTVILLE AS PER PLANS FILE… |
| M01334677 ↗ | 137 ORCHARD STREET MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 03/18/2026 | Design TAN ENGINEERING PC Contractor PA BUILDERS, INC | NEW MECHANICAL SYSTEM ASSOCIATED WITH RENOVATION OF EXISTING COMMERCIAL SPACE FOR 'SOFTVILLE' AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,… |
| M01351809 ↗ | 622 3 AVENUE MANHATTAN | Alteration | Permit Issued | 02/12/2026 | 02/13/2026 | Design VIRALINE ARCHITECTURE LLP Contractor CARY P O'BRIEN DESIGN LLC | INTERIOR OFFICE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY. |
| M01182150 | 318 WEST 39 STREET MANHATTAN | Alteration CO | Permit Issued | 11/19/2025 | 02/11/2026 | Design RIP CONSTRUCTION CONSULTANTS Owner GFP REAL ESTATE LLC Contractor COOPER WORKS Filer RIP CC INC | FILE FOR CHANGE OF USE & INTERIOR CONSTRUCTION AT 1ST FLOOR AS PER PLANS. EXISTING NON COMPLIANT BUILDING. NO CHANGE TO BUILDING HEIGHT OR B… |
| B01291504 ↗ | 314 LIVINGSTON STREET BROOKLYN | Alteration | Permit Issued | 11/24/2025 | 02/09/2026 | Design Domus Company LLC Owner ELINORE STERN TRUST Contractor COW BAY SPRINKLER CORP Filer EA DESIGN GROUP, INC. | SUBSEQUENT APPLICATION FILED FOR EXTERIOR STRUCTURAL MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP… |
| M01124467 ↗ | 482 WEST BROADWAY MANHATTAN | Alteration | Permit Issued | 06/11/2025 | 02/09/2026 | Design OCULUS INC. Contractor ATLANTIC CONSTRUCTION SER | GENERAL CONSTRUCTION FOR EXTERIOR STOREFRONT RENOVATIONS INCLUDING REPLACE LIGHT FIXTURES AND PAINT THE EXTERIOR ONLY AS PER PLANS FILED HER… |
| B00898576 ↗ | 139 SKILLMAN AVENUE BROOKLYN | Alteration | Signed-off | 07/06/2023 | 02/05/2026 | Design A&M CONSULTING Contractor CATALYST DEVELOPMENT GROU Filer JM ZONING, LLC. | PROPOSE TO REPLACE SPLIT HAVC UNIT, DUCTING, AND BATHROOM EXHAUST FANS AS PER PLANS SUBMITTED HEREWITH. |
| M00449611 ↗ | 154 CHRISTOPHER STREET MANHATTAN | Alteration | Permit Issued | 05/15/2024 | 01/28/2026 | Contractor PFL MECHANICAL CORP | HEREBY FILING FOR THE DIRECT REPLACMENT OF ROOT TOP UNIT. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| B08051896 ↗ | 314 KENT AVENUE BROOKLYN | Alteration | Permit Issued | 12/17/2022 | 01/26/2026 | Owner TWO TREES Contractor REFINERY CONSTRUCTION LLC | TENANT FIT-OUT FOR ENTIRE OFFICE FLOORS IN CONJUNCTION WITH ALT 1 321385504 |
| B01192000 ↗ | 2095 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 05/12/2025 | 01/22/2026 | Design JarmelKizel Architects Contractor NICE PLUMBING CORP | Modification to existing plumbing & sprinkler applications. No change in use, egress or occupancy. |
| M01277939 ↗ | 305 EAST 45 STREET MANHATTAN | Alteration | Permit Issued | 10/31/2025 | 12/30/2025 | Design URBAN ENGINEERING, PC Owner Tolis Advisors, LP Contractor AQUEDUCT MECHANICAL CORP Filer URBAN ENGINEERING, PC | PLUMBING APPLICATION FILED IN CONJUNCTION WITH INTERIOR RENOVATION APPLICATION. MINOR PLUMBING MODIFICATIONS. NO CHANGE IN USE, OCCUPANCY, O… |
| X01247930 ↗ | 1052 SHERIDAN AVENUE BRONX | Alteration | Permit Issued | 09/01/2025 | 12/09/2025 | Contractor TOWER SERVICES INC | APPLICATION FILED FOR THE REPAIR/ REPLACEMENT OF 20 LF OF RETAINING WALL TO ADDRESS VIOLATION #39089374L. NO CHANGE IN USE, OCCUPANCY, OR EG… |
| M01318067 ↗ | 1450 2 AVENUE MANHATTAN | Alteration | Permit Issued | 11/14/2025 | 12/01/2025 | Design Joseph F Sarra Jr, Architect Owner T.M.S. Management Co. Contractor NORTHEAST SPECIALIST GROUP | GENERAL CONSTRUCTION DEMO FOR 1ST FLOOR STORE INTERIOR REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01298181 ↗ | 100 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2025 | 11/26/2025 | Design TSF ENGINEERING, PC Owner BUCHBINDER & WARREN LLC Contractor JRM CONSTRUCTION MGMT LLC | Interior renovation, eating/drinking establishment, less than 75 people. Existing storage/offices on 1st, Mezzanine level to be renovated (… |
| B00679106 ↗ | 286 HICKS STREET BROOKLYN | Alteration | Signed-off | 02/18/2022 | 11/19/2025 | Design ERIC SHEFFIELD ARCHITECT Contractor 212 BUILDERS INC Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Leveling of existing wood joists and new steel dunnage. |
| Q01318935 ↗ | 104-15 100 STREET QUEENS | Alteration | Filed — no permit on record | 11/14/2025 | — | Design CHRISTOPHER TEETER Owner MAMITAS ICES LTD Filer CHRISTOPHER TEETER,RA | — |
| M01199058 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/21/2025 | 11/13/2025 | Design Downtown Engineers Contractor KING ROSE OF NY, INC | Installation of HVAC work for stacked dryers at basement. No change to use, occupancy, or egress. |
| M00566136 ↗ | 320 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 08/02/2022 | 11/12/2025 | Design TRI-POWER ENGINEERING, LLC Owner ARDSLEY MARCH 2018 TRUST Contractor SILVERLINING INTERIORS Filer RICHARD LEWIS ARCHITECT | Install new air conditioning system and controls in conjunction with renovation of a single dwelling unit. The AC system will consist of (2)… |
| M01199047 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/21/2025 | 11/12/2025 | Design Downtown Engineers Contractor I.M.P. PLBG. & HTG. CORP | FILING HEREWITH FOR PLUMBING WORK (SANITARY, VENT, & WATER) FOR AN EXISTING MULTI FAMILY BUILDING AS INDICATED ON PLANS. NO CHANGE IN USE, E… |
| M01199054 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/21/2025 | 11/12/2025 | Design Downtown Engineers Contractor I.M.P. PLBG & HTG CORP | Modification of existing automatic sprinkler system as per plans filled herewith. Proposed sprinkler system is designed as per NFPA 13, as m… |
| Q01305266 ↗ | 36-23 REVIEW AVENUE QUEENS | Alteration | Signed-off | 10/22/2025 | 11/12/2025 | Design TWIG CONSULTING ENGINEERS PC Owner FIRE FOE CORP Contractor BUILDWISE PLUMBING HEATIN Filer PSE CONSULTING LLC | New gas piping from existing meter to exist gas fired hot water heater on first floor, existing gas fired heater and to existing gas fired f… |
| Q01104437 ↗ | 39-40 30 STREET QUEENS | Alteration CO | Permit Issued | 10/03/2024 | 11/07/2025 | Owner TALA FOOD MARKET INC. Contractor COOPER WORKS | Minor alterations and change of occupancy at cellar from commercial (B) to food processing (F-2). |
| M01284653 ↗ | 885 THIRD AVE MANHATTAN | Alteration | Permit Issued | 09/19/2025 | 11/05/2025 | Design TAN ENGINEERING PC Owner SL GREEN REALTY CORP Contractor OTEC PLBNG & HTG SVCS INC Filer RIZZO GROUP | Installation, removal, and modifications to plumbing fixtures and piping, as per plans. No change to use, egress, or occupancy. |
| B01258152 ↗ | 45 MAIN STREET BROOKLYN | Alteration | Signed-off | 10/03/2025 | 11/03/2025 | Design HBC ARCHITECTS Owner Two Trees Management Contractor COOPER WORKS | Replacement and relocation of existing sprinkler heads. |
| M01133474 ↗ | 25 CHARLTON STREET MANHATTAN | Alteration | Permit Issued | 11/25/2024 | 10/31/2025 | Design A&M CONSULTING Contractor QUINN-ONELLI INC Filer JM ZONING, LLC. | PROPOSE TO INSTALL A SPLIT AIR-COOLED AC SYSTEM AT THE ROOF AND MINOR INTERIOR WORK AS PERPLANS SUBMITTED HEREWITH. |
| M01141954 ↗ | 25 CHARLTON STREET MANHATTAN | Alteration | Permit Issued | 01/02/2025 | 10/31/2025 | Design A&M CONSULTING Contractor QUINN-ONELLI INC Filer JAM CONSULTANTS, INC. | MECHANICAL WORK ASSOCIATED WITH RENOVATION OF 2 FAMILY HOUSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01191404 ↗ | 2095 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 05/12/2025 | 10/30/2025 | Design JarmelKizel Architects Contractor BUILDOPS INC | Removal and renovation of existing non-load bearing partitions. No change in use, egress or occupancy. |
| B01191405 ↗ | 2095 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 05/06/2025 | 10/30/2025 | Design JarmelKizel Architects Contractor BUILDOPS INC | Modification to HVAC systems. No change in use, egress or occupany. |
| B01191997 ↗ | 2095 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2025 | 10/30/2025 | Design JarmelKizel Architects Contractor BUILDOPS INC | Modification to existing structural systems. No change in use, egress or occupancy. |
| B01255248 ↗ | 1 BOERUM PLACE BROOKLYN | Alteration | Signed-off | 08/21/2025 | 10/30/2025 | Design BENDIX ENGINEERING, P.C. Owner AVERY HALL INVESTMENTS Contractor AMERICAN CONSTRUCTION MAN | MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 1ST FLOOR COMMERCIAL TENANT SPACE (DOS TOROS). PROVIDE NEW KITCHEN EXHAUST HOOD CONNECTED … |
| M01285339 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/25/2025 | 10/28/2025 | Design GACE DPC Contractor COOPER WORKS | Structural modifications as per plans filed herewith. No change in use, egress or occupancy. |
| B01125083 ↗ | 149 KANE STREET BROOKLYN | Alteration | Signed-off | 12/09/2024 | 10/21/2025 | Design RICHARD KRESHTOOL ARCHITECT Contractor 360 PRESTIGE CONTRACTING Filer PWF | STRUCTURAL MODIFICATIONS OF EXISTING RESIDENTIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| B08019901 ↗ | 151 COURT STREET BROOKLYN | Alteration | Signed-off | 11/09/2022 | 10/09/2025 | Design DNA ARCHITECTS Contractor VANGUARD CONSTRUCTION AND | General Construction work as shown on plans. No change in use, egress, or occupancy. |
| M01057217 ↗ | 333 EAST 30 STREET MANHATTAN | Alteration | Permit Issued | 06/19/2024 | 10/06/2025 | Design VIRALINE ARCHITECTURE LLP Contractor S.M. ZAKO, LLC | COMBINATION OF TWO EXISTING APARTMENTS #5C AND #5D, INCLUDING MINOR PARTITIONS CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP… |
| M01170433 ↗ | 20 EAST 84 STREET MANHATTAN | Alteration | Permit Issued | 04/01/2025 | 10/03/2025 | Design TWIG CONSULTING ENGINEERS PC Contractor VRF SOLUTIONS LLC | Decommissioning of existing oil fired boiler. Installation of new heat pump heating/cooling system with associated ducts, piping and control… |
| M01241101 ↗ | 20 EAST 84 STREET MANHATTAN | Alteration | Permit Issued | 07/29/2025 | 10/02/2025 | Design TWIG CONSULTING ENGINEERS PC Owner NMC PROPERTY MANAGEMENT Contractor ZEREGA CONTRACTING CORP Filer PSE CONSULTING LLC | Installation of new domestic hot water generation system as shown on plans. |
| M01284429 ↗ | 1 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/25/2025 | 10/01/2025 | Design RIP CONSTRUCTION CONSULTANTS Contractor COOPER WORKS | Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy. |
| Q01064196 ↗ | 37-11 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 07/24/2024 | 09/29/2025 | Design A&M CONSULTING Contractor KELAIR INC | PROVIDE A NEW TIE-IN TO THE EXISTING GAS LINE FROM THE CELLAR TO THE ROOFTOP UNITS AS PER PLANS SUBMITTED HEREWITH. |
| M01278348 ↗ | 6 WEST 52 STREET MANHATTAN | Alteration | Permit Issued | 09/10/2025 | 09/15/2025 | Design MARIN ARCHITECTS, P.C. Contractor PA BUILDERS, INC | Interior renovation of existing 1st floor commercial space (1,585 SQ FT) No change of use, occupancy or egress under this application. Renov… |
| B01081423 ↗ | 2101 CHURCH AVENUE BROOKLYN | Alteration | Signed-off | 08/07/2024 | 09/11/2025 | Contractor COOPER WORKS | Tenant build out for a new fine/fast casual restaurant with dine in and take away services. No change to use, occupancy, or egress. |
| Q01171011 ↗ | 61-01 JUNCTION BOULEVARD QUEENS | Alteration | Permit Issued | 08/13/2025 | 09/04/2025 | Design TEI OF WA Owner COSTCO WHOLESALE Contractor FDS MECHANICAL INC | PROPOSE TO RENOVATE THE BAKERY DEPARTMENT AT COSTCO AS PER THE PLANS SUBMITTED HEREWITH. PLUMBING AND MECHANICAL APPLICATIONS TO BE FILED SU… |
| B01108982 ↗ | 82 BELMONT AVENUE BROOKLYN | Alteration | Permit Issued | 08/26/2025 | 09/03/2025 | Design JarmelKizel Architects Contractor COOPER WORKS | Modification to existing Structural Systems. No change, in use, egress or occupancy. |
| M01167581 ↗ | MAIN STREET MANHATTAN | Alteration | Permit Issued | 03/18/2025 | 08/26/2025 | Design LAWLESS & MANGIONE Owner WESTVIEW OWNERS CORP. Contractor ALLIANCE CONTRACTING GRP | GENERAL CONSTRUCTION FOR INTERIOR LOBBY RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01107460 ↗ | 82 BELMONT AVENUE BROOKLYN | Alteration | Permit Issued | 05/12/2025 | 08/18/2025 | Design JarmelKizel Architects Contractor COOPER WORKS | Removal and renovation of interior non-load bearing partitions as per plans filed herewith. |
| B01237013 ↗ | 2397 FLATBUSH AVENUE EXT BROOKLYN | Alteration | Permit Issued | 07/20/2025 | 08/18/2025 | Design KENDALL ENGINEERING PC Contractor ACCURATE MECHANICAL INC | TENANT BUILD OUT FOR A NEW FINE/FAST-CASUAUL RESTAURANT WITH DINE-IN AND TAKE-AWAY SERVICES INCLUDING DEMOLITION AND GENERAL CONSTRUCTION WO… |
| B01109338 ↗ | 84 BELMONT AVENUE BROOKLYN | Alteration | Permit Issued | 04/09/2025 | 08/15/2025 | Design JarmelKizel Architects Contractor COOPER WORKS | Modification to existing structural systems as per plans filed. No change in use, egress or occupancy. |
| M01238731 ↗ | 27 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 07/09/2025 | 08/04/2025 | Design C2B ARCHITECTS PC Owner DEZER PROPERTIES Contractor COW BAY SPRINKLER CORP | APPLICATION FILED FOR SPRINKLER/ PLUMBING WORK AS PER PLAN HEREWITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| B01183837 ↗ | 90 NORMAN AVENUE BROOKLYN | Alteration | Permit Issued | 03/19/2025 | 07/31/2025 | Design CHRISTOPHER TEETER Owner GOLDBERG GROUP Contractor CHANDRABALI RAMANAND Filer CHRISTOPHER TEETER,RA | SPLIT SYSTEM IN CONNECTION WITH INTERIOR RENOVATION. |
| M01204762 ↗ | 471 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/09/2025 | 07/29/2025 | Design VIRALINE ARCHITECTURE LLP Contractor KING ROSE OF NY, INC | MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01215357 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 07/15/2025 | Design VIRALINE ARCHITECTURE LLP Contractor KING ROSE OF NY, INC | The proposed project is the design and renovation of specific areas within the basement at 425 W 50th Street, NY NY 10019 for Stella Tower a… |
| Name | Jobs together | Most recent |
|---|---|---|
| A&M CONSULTING | 57 | 06/08/2026 |
| TAN ENGINEERING PC | 29 | 08/11/2026 |
| TWIG CONSULTING ENGINEERS PC | 23 | 08/19/2026 |
| M.INT'L ENGINEERING PLLC | 19 | 03/22/2024 |
| C&B CONSULTING ENGINEERS LLC | 16 | 02/04/2025 |
| ALAN FELD | 15 | 12/18/2025 |
| SARGENTI ARCHITECTS | 12 | 06/15/2026 |
| KENDALL ENGINEERING PC | 11 | 07/08/2026 |
| VIRALINE ARCHITECTURE LLP | 11 | 02/12/2026 |
| ZACHARY SAPINSLEY LEWIS, R.A. | 11 | 08/19/2026 |
| MATTHEW RUOPOLI, AIA | 10 | 11/26/2025 |
| EVERJ ENGINEERING INC PC | 9 | 07/21/2025 |
| JarmelKizel Architects | 9 | 05/13/2026 |
| GLUE ARCHITECT, PLLC | 8 | 07/08/2026 |
| RIP CONSTRUCTION CONSULTANTS | 7 | 08/13/2026 |
| ROSENTHAL ENGINEERING PLLC | 7 | 04/19/2026 |
| BENDIX ENGINEERING, P.C. | 6 | 08/12/2026 |
| GACE DPC | 6 | 08/11/2026 |
| MIRELLA BOSELLI ARCHITECT | 6 | 01/21/2026 |
| CCPE | 5 | 08/22/2024 |
| CHRISTOPHER TEETER | 5 | 08/12/2026 |
| EP ENGINEERING LLC | 5 | 11/10/2025 |
| IP GROUP | 5 | 01/13/2025 |
| BKA ARCHITECTS | 4 | 09/05/2024 |
| CUSTOM DESIGNING & ENGINEERING | 4 | 08/22/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| COOPER WORKS INC | 60 | 08/13/2026 |
| QPR MECHANICAL INC | 34 | 07/29/2026 |
| VRF SOLUTIONS LLC | 20 | 05/28/2026 |
| KELAIR INC | 16 | 06/08/2026 |
| PA BUILDERS, INC | 8 | 08/19/2026 |
| KING ROSE OF NY, INC | 7 | 09/11/2025 |
| AIR STREAM AIR CONDITIONI | 6 | 03/26/2024 |
| CF SECURITY INTEGRATION | 6 | 01/21/2026 |
| CPM BUILDERS INC | 6 | 08/19/2026 |
| VILLAGE P & H NY INC | 6 | 06/16/2026 |
| VMC PLUMBING & HEATING IN | 6 | 08/19/2026 |
| AMERICAN CONSTRUCTION MAN | 5 | 06/15/2026 |
| NYC PLUMBING & HEATING IN | 5 | 08/12/2026 |
| PCCM MANAGEMENT CORP | 5 | 08/28/2024 |
| A. BONADUCE, INC | 4 | 12/18/2025 |
| AAA TOTAL PLUMBING INC | 4 | 08/19/2026 |
| ATLANTIC CONSTRUCTION SER | 4 | 06/11/2025 |
| CAPITOL FIRE SPRINKLER CO | 4 | 01/19/2024 |
| COW BAY SPRINKLER CORP | 4 | 03/03/2026 |
| DNJ INDUSTRIES INC | 4 | 05/15/2024 |
| THE MANLYN DEVELOPMENT GR | 4 | 04/12/2024 |
| 360 PRESTIGE CONTRACTING | 3 | 01/13/2025 |
| BUILDOPS INC | 3 | 10/13/2025 |
| CATALYST DEVELOPMENT GROU | 3 | 02/04/2025 |
| EXPERT MECHANICAL CONTRAC | 3 | 01/30/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| CF SECURITY INTEGRATION INC | 8 | 06/10/2025 |
| BLDG MANAGEMENT CO., INC. | 6 | 06/11/2025 |
| Naya | 6 | 07/21/2025 |
| 9 DEKALB FEE OWNER LLC | 5 | 08/13/2026 |
| KAMBER MANAGEMENT LLC | 5 | 04/28/2026 |
| T.M.S. Management Co. | 5 | 05/26/2026 |
| ARISTA REAL ESTATE HOLDINGS | 4 | 08/13/2024 |
| DNJ INDUSTRIES INC DBA DNJ MECHANIC | 4 | 05/28/2021 |
| LANDMARK RENOVATION GROUP LLC | 4 | 12/01/2023 |
| VORNADO REALTY TRUST | 4 | 05/13/2024 |
| 500 WEST 37TH STREET CO., LLC | 3 | 06/03/2022 |
| ACHS MANAGMENT | 3 | 04/12/2024 |
| BXP | 3 | 06/13/2024 |
| CLINTON HOUSING DEVELOPMENT COMPANY | 3 | 01/21/2026 |
| COSTCO WHOLESALE #318 | 3 | 04/23/2025 |
| DUELL LLC | 3 | 08/19/2026 |
| EIB STUDIO SQUARE LLC | 3 | 07/06/2023 |
| EQUITY RESIDENTIAL | 3 | 05/22/2025 |
| ESM CONSTRUCTION CORP | 3 | 02/19/2025 |
| FIRST SERVICE RESIDENTIAL | 3 | 08/28/2025 |
| Forty Seventh Fifth Company LLC | 3 | 06/29/2026 |
| 118-120 HUDSON ST LLC | 2 | 03/23/2022 |
| 1314 DEVELOPMENT LLC | 2 | 08/14/2024 |
| 180 VARICK LLC | 2 | 06/16/2021 |
| AKAM ASSOCIATES, INC. | 2 | 03/05/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 61 | 08/13/2026 |
| JM ZONING, LLC. | 19 | 04/23/2025 |
| ANZALONE ARCHITECTURE, PLLC | 17 | 06/15/2026 |
| WILLIAM VITACCO ASSOCIATES | 15 | 04/23/2026 |
| RICHARD LEWIS ARCHITECT | 11 | 04/19/2026 |
| A1 EXPEDITING SERVICE CORP. | 9 | 05/13/2026 |
| PSE CONSULTING LLC | 9 | 07/23/2026 |
| A&M ENGINEERING CONSULTING DPC | 8 | 10/14/2025 |
| ADG | 7 | 02/04/2025 |
| GILLMAN CONSULTING INC | 7 | 02/18/2025 |
| PWF | 6 | 01/13/2025 |
| CHRISTOPHER TEETER,RA | 5 | 08/12/2026 |
| EDI CONSULTING GROUP, LLC | 5 | 08/19/2026 |
| MARY TERESA DIPAOLI | 5 | 06/10/2025 |
| MICHAEL ZENREICH ARCHITECT, PC | 5 | 06/17/2026 |
| RIZZO GROUP | 5 | 04/22/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 4 | 09/11/2025 |
| CONVERSANO ASSOCIATES, INC. | 3 | 12/17/2025 |
| EA DESIGN GROUP, INC. | 3 | 03/03/2026 |
| GARO GUMUSYAN | 3 | 06/29/2026 |
| J. CALLAHAN CONSULTING, INC. | 3 | 08/28/2025 |
| BLANCO DESIGN, INC. | 2 | 09/26/2024 |
| BMB BUILDING CONSULTING INC. | 2 | 07/10/2024 |
| JAM CONSULTANTS, INC. | 2 | 09/16/2025 |
| RIP CC INC | 2 | 11/19/2025 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/31/2026 | Energy Code Compliance Inspections | 2248 RYER AVENUE | Michael Risbergs | progress |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | 2248 RYER AVENUE | Michael Risbergs | special |
| 08/25/2026 | Post-installed Anchors | 227-15 NORTH CONDUIT AVENUE | JOSEPH YOUNG | special |
| 08/25/2026 | High-Pressure Fuel-Gas Piping (Welding) | 227-15 NORTH CONDUIT AVENUE | JOSEPH YOUNG | special |
| 08/25/2026 | Fire-Resistant Penetrations and Joints | 227-15 NORTH CONDUIT AVENUE | JOSEPH YOUNG | special |
| 08/18/2026 | Energy Code Compliance Inspections | 83 THOMPSON ST | JOSEPH YOUNG | progress |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 83 THOMPSON ST | JOSEPH YOUNG | special |
| 08/18/2026 | Post-installed Anchors | 83 THOMPSON ST | JOSEPH YOUNG | special |
| 08/14/2026 | Final | 90 NORMAN AVENUE | ROMAN MARDAREWICH | progress |
| 08/14/2026 | Structural Steel - Welding | 90 NORMAN AVENUE | JOSEPH YOUNG | special |
| 08/14/2026 | Structural Steel - Details | 90 NORMAN AVENUE | JOSEPH YOUNG | special |
| 08/13/2026 | Tenant Protection Plan Compliance | 317 BLEECKER STREET | JOSEPH YOUNG | special |
| 08/13/2026 | Fire-Resistance Rated Construction | 317 BLEECKER STREET | JOSEPH YOUNG | progress |
| 08/13/2026 | Final | 317 BLEECKER STREET | JOSEPH YOUNG | progress |
| 08/11/2026 | Lighting controls | 5 WEST 95 STREET | Paul Gregory | energy_progress |
| 08/11/2026 | Interior lighting power | 5 WEST 95 STREET | Paul Gregory | energy_progress |
| 08/11/2026 | Final | 5 WEST 95 STREET | Paul Gregory | progress |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | 5 WEST 95 STREET | Paul Gregory | special |
| 08/11/2026 | Tenant Protection Plan Compliance | 5 WEST 95 STREET | — | special |
| 08/11/2026 | Mechanical Systems | 5 WEST 95 STREET | Paul Gregory | special |
| 08/04/2026 | Final | 170 THOMPSON STREET | JOSEPH YOUNG | progress |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | 500 WEST 33 STREET | — | special |
| 08/03/2026 | Post-installed Anchors | 500 WEST 33 STREET | — | special |
| 08/03/2026 | HVAC-R and service water piping design and insulation | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | Duct leakage testing, insulation and design | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | Maintenance information | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | HVAC-R and service water heating system controls | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | Energy Code Compliance Inspections | 500 WEST 33 STREET | — | progress |
| 08/03/2026 | Post-installed Anchors | 500 WEST 33 STREET | — | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | 500 WEST 33 STREET | — | special |
| 08/03/2026 | HVAC-R and service water heating equipment | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | HVAC-R and service water heating system controls | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | HVAC-R and service water piping design and insulation | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | Maintenance information | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | HVAC-R and service water heating equipment | 500 WEST 33 STREET | — | energy_progress |
| 08/03/2026 | Energy Code Compliance Inspections | 500 WEST 33 STREET | — | progress |
| 08/03/2026 | Post-installed Anchors | 500 WEST 33 STREET | — | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | 500 WEST 33 STREET | — | special |
| 07/28/2026 | Lighting controls | 90 NORMAN AVENUE | Christopher Teeter | energy_progress |
| 07/28/2026 | Interior lighting power | 90 NORMAN AVENUE | Christopher Teeter | energy_progress |
| 07/28/2026 | Final | 90 NORMAN AVENUE | ROMAN MARDAREWICH | progress |
| 07/28/2026 | Fire-Resistance Rated Construction | 90 NORMAN AVENUE | Christopher Teeter | progress |
| 07/28/2026 | Energy Code Compliance Inspections | 90 NORMAN AVENUE | Christopher Teeter | progress |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | 90 NORMAN AVENUE | JOSEPH YOUNG | special |
| 07/28/2026 | Interior lighting power | 9 DEKALB AVENUE | JOSEPH YOUNG | energy_progress |
| 07/28/2026 | Lighting controls | 9 DEKALB AVENUE | JOSEPH YOUNG | energy_progress |
| 07/28/2026 | Energy Code Compliance Inspections | 9 DEKALB AVENUE | JOSEPH YOUNG | progress |
| 07/23/2026 | HVAC-R and service water heating system controls | 206 EAST 95 STREET | Matthew Bendix | energy_progress |
| 07/23/2026 | HVAC-R and service water heating system controls | 9 DEKALB AVENUE | Roger Tan | energy_progress |
| 07/23/2026 | HVAC-R and service water heating equipment | 9 DEKALB AVENUE | Roger Tan | energy_progress |