13-20 124TH STREET
QUEENS · College Point · BIN 4096962
💬 Discuss this project
1932Year Built
3Stories
W2Building Class
R4AZoning
68,400 sfGross Floor Area
0Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 2 old, status unconfirmed ▸
Parochial school, yeshiva · Owner of record: NYC School Construction Authority · 47,952 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBuilding RenovationUnder Construction55p · 3 filings · 20 docs
BulkheadBuilding RenovationUnder Construction4p · 1 filing · 20 docs
Floor 3Rocklyn Asset CORPUnder Construction53p · 3 filings · 20 docs
Floor 2Rocklyn Asset CORPUnder Construction134p · 3 filings · 20 docs
Floor 1Rocklyn Asset CORPUnder Construction138p · 3 filings · 20 docs
CellarRocklyn Asset CORPUnder Construction14p · 2 filings · 20 docs
BasementBuilding RenovationUnder Construction96p · 2 filings · 20 docs
Sub-BasementBuilding RenovationUnder Construction34p · 5 filings · 20 docs
Site & exteriorNYC Sca/BCCUnder Construction139p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6210/01/2026
Rocklyn Asset2103/22/2026
St Agnes High School103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2023$36.9M—Private party → New York City School Construction Authority$539/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
360 Engineering904/27/2026
DVL Consulting Engineers903/31/2025
Elevated Engineering101/21/2025
AKRF304/23/2024
Obiora C. Agudosi403/07/2024
Ysrael A. Seinuk101/10/2024
SRL Associates210/05/2022
Paul Perdek, Prof. Engineering203/07/2022
Howard I Shapiro & Associates112/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Biltmore Group203/21/2026
Caso Associates3403/21/2026
AE Design Solution403/21/2026
Synergy Building Consultants203/21/2026
Howard I Shapiro Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KG Construction ServicesGeneral Contractor1207/08/2026
KG Construction ServicesScaffold908/22/2026
Titan Industrial ServiceScaffold603/21/2026
Titan Industrial ServiceGeneral Contractor603/21/2026
Eagle MechanicalFire Protection407/08/2026
Gotham CommunicationsGeneral Contractor303/21/2026
R.A.M.S. Mechanicalspecialty_contractor307/17/2026
Par Plumbing CoPlumbing310/01/2026
Mar-Sal Plumbing & HeatingPlumbing207/08/2026
Arsenal ScaffoldScaffold203/21/2026
Perciballi IndustriesGeneral Contractor107/08/2026
Varsity Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001604/27/2026
C.M. Testing Laboratory1352112/10/2021
Building Lifecycle
All (201)Filed (32)Permit Issued (40)Signed Off (3)Violation (60)Inspection (4)Objection (32)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
Q00980892-S2-PL
08/21/2026
Permit issued — Sidewalk Shed
Q01099037-I1-SH
07/31/2026
Permit issued — Boiler Equipment
Q00996063-S1-BE
07/16/2026
Permit issued — Mechanical Systems
Q00996063-I1-MS
06/15/2026
Permit issued — Plumbing
Q00980892-S6-PL
06/02/2026
Permit issued — Mechanical Systems
Q00980892-S3-MS
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Permit issued — Sidewalk Shed
Q01099037-I1-SH
05/22/2026
Permit issued — Earth Work
Q00980892-S5-GC-CX
05/19/2026
Permit issued — General Construction
Q00980892-I1-GC
05/18/2026
Permit issued — Structural
Q00980892-S1-ST
05/18/2026
Permit issued — Mechanical Systems
Q00980892-S8-MS
05/18/2026
Permit issued — Supported Scaffold
Q01099041-I1-SF
05/06/2026
Objection resolved — Addressed
05/06/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
05/04/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/29/2026
Objection resolved — Resolved
04/28/2026
Objection raised — Other
04/27/2026
Filed — Alteration
SUPPORT OF EXCAVATION DRAWINGS FOR NEW RAMP FOUNDATION, NEW UTILITY PIPES, AND NEW DRYWELLS TO BE INSTALLED. NO CHANGE IN USE,EGRESS OR OCCUPANCY
Q01099043-P1
04/27/2026
Objection raised — Other
04/22/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR ACCESS TO WORK LOCATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01099041-P2
04/15/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
02/26/2026
Permit issued — Construction Fence
Q01099033-I1-FN
02/25/2026
Permit issued — Sidewalk Shed
Q01099037-I1-SH
01/16/2026
Permit issued — Support of Excavation
Q01099043-I1-SE
01/06/2026
Permit issued — Standpipe
Q00980892-S4-EW-SD
01/05/2026
Permit issued — Standpipe
Q00980892-S4-EW-SP
12/10/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Other
12/02/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/19/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION FROM AREAS OF CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01099037-P1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2025
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR ACCESS TO WORK LOCATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01099041-P1
10/22/2025
Permit issued — Plumbing
Q00980892-S2-PL
10/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/25/2025
Permit issued — Boiler Equipment
Q00928454-S3-BE
08/11/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/07/2025
Permit issued — Plumbing
Q00980892-S6-PL
06/27/2025
Permit issued — Support of Excavation
Q01099043-I1-SE
06/27/2025
Permit issued — Mechanical Systems
Q00980892-S3-MS
06/20/2025
Permit issued — General Construction
Q00980892-I1-GC
06/20/2025
Permit issued — Plumbing
Q00980892-S2-PL
06/20/2025
Permit issued — General Construction
Q00980892-S5-GC-CX
06/18/2025
Permit issued — Sprinklers
Q00980892-S4-EW-SP
06/18/2025
Permit issued — Standpipe
Q00980892-S4-EW-SD
06/17/2025
Permit issued — Structural
Q00980892-S1-ST
06/17/2025
Permit issued — Mechanical Systems
Q00980892-S8-MS
06/16/2025
Permit issued — Sidewalk Shed
Q01099037-I1-SH
06/13/2025
Permit issued — Supported Scaffold
Q01099041-I1-SF
06/12/2025
Permit issued — Support of Excavation
Q01099043-I1-SE
06/02/2025
Signed off — Alteration
Filing to decom existing antenna site. Removal of equipment platform on roof and 3 Sectors (12 Antennas, 6 RRUS and 1 GPS). Initial installation approved under app #401694190 and 421086684. No change in use, egress or occupancy. T-MOBILE
Q01164529-I1
04/24/2025
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK.
Q01099033-P1
04/03/2025
Objection resolved — Addressed
03/31/2025
Filed — Alteration
Emergency generator for public school
Q00996063-P1
03/24/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
NELSON LOPEZ
03/08/2025
Permit issued — Antenna
Q01164529-I1-AN
03/03/2025
Permit issued — Construction Fence
Q01099033-I1-FN
02/24/2025
Objection resolved — Addressed
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPar Plumbing Co09/23/2026
DOB NOWSidewalk ShedPermit IssuedKG Construction Services08/21/2026
DOB NOWBoiler EquipmentPermit IssuedChampion Combustion07/31/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical07/16/2026
DOB NOWPlumbingPermit IssuedMar-Sal Plumbing & Heating06/15/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical06/02/2026
DOB NOWSidewalk ShedPermit IssuedKG Construction Services05/26/2026
DOB NOWEarth WorkPermit IssuedKG Construction Services05/22/2026
DOB NOWGeneral ConstructionPermit IssuedKG Construction Services05/19/2026
DOB NOWStructuralPermit IssuedKG Construction Services05/18/2026
DOB NOWMechanical SystemsPermit IssuedKG Construction Services05/18/2026
DOB NOWSupported ScaffoldPermit IssuedKG Construction Services05/18/2026
DOB NOWConstruction FencePermit IssuedStalco02/26/2026
DOB NOWSidewalk ShedPermit IssuedStalco02/25/2026
DOB NOWSupport of ExcavationPermit IssuedStalco01/16/2026
DOB NOWStandpipePermit IssuedEagle Mechanical01/06/2026
DOB NOWSprinklersPermit IssuedEagle Mechanical01/05/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co10/22/2025
DOB NOWBoiler EquipmentSigned-offChampion Combustion09/25/2025
DOB NOWPlumbingPermit IssuedMar-Sal Plumbing & Heating07/07/2025
DOB NOWSupport of ExcavationPermit IssuedStalco06/27/2025
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. Mechanical06/27/2025
DOB NOWGeneral ConstructionPermit IssuedStalco06/20/2025
DOB NOWPlumbingPermit IssuedPar Plumbing Co06/20/2025
DOB NOWGeneral ConstructionPermit IssuedStalco06/20/2025
DOB NOWSprinklersPermit IssuedEagle Mechanical06/18/2025
DOB NOWStandpipePermit IssuedEagle Mechanical06/18/2025
DOB NOWStructuralPermit IssuedStalco06/17/2025
DOB NOWMechanical SystemsPermit IssuedStalco06/17/2025
DOB NOWSidewalk ShedPermit IssuedStalco06/16/2025
DOB NOWSupported ScaffoldPermit IssuedStalco06/13/2025
DOB NOWSupport of ExcavationPermit IssuedStalco06/12/2025
DOB NOWAntennaSigned-offGotham Communications03/08/2025
DOB NOWConstruction FencePermit IssuedStalco03/03/2025
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating09/12/2024
DOB NOWGeneral ConstructionPermit IssuedPerciballi Industries09/11/2024
DOB NOWStructuralSigned-offTitan Industrial Service10/14/2022
DOB NOWStructuralSigned-offTitan Industrial Service08/17/2022
DOB NOWConstruction FencePermit IssuedTitan Industrial Service02/14/2022
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold01/05/2022
+ 8 more permits on file
2 projects · most recent 03/31/2025
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2025Permit IssuedR.A.M.S. MechanicalGenerators—
04/23/2024Permit IssuedR.A.M.S. MechanicalHeating and Air Conditioning Systems, Ventilation Systems
Ventilation
Obar GBR89 150 CFM ×2
1 project · most recent 04/23/2024
Sprinkler System
FiledStatusContractorScope
04/23/2024Permit IssuedEagle MechanicalSprinkler System
1 project · most recent 04/23/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/23/2024Permit IssuedPar Plumbing CoGas, Storm, Water/Sanitary
3 projects · most recent 11/14/2025
General Wiring
FiledStatusContractorScope
11/14/2025Permit IssuedKanta ElectricGeneral Wiring
06/30/2025Permit IssuedKanta ElectricGeneral Wiring
09/10/2024CompleteAujla Electric—
2 projects · most recent 04/27/2026
Concrete
FiledStatusContractorScope
04/27/2026Permit IssuedKG Construction Services1 scope_items
04/23/2024Permit IssuedPar Plumbing CoConcrete
4 projects · most recent 04/22/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/22/2026Permit IssuedKG Construction ServicesScaffold
11/19/2025Permit IssuedKG Construction ServicesSidewalk Shed
04/24/2025Permit IssuedKG Construction ServicesFence
03/07/2022Permit IssuedTitan Industrial ServiceFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/06/2026Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
05/04/2026Post-installed AnchorsNELSON LOPEZspecial
04/15/2026Post-installed AnchorsNELSON LOPEZspecial
08/11/2025Post-installed AnchorsNELSON LOPEZspecial
03/24/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsNELSON LOPEZspecial
05/07/2024Post-installed AnchorsNELSON LOPEZspecial
05/07/2024Post-installed AnchorsNELSON LOPEZspecial
04/09/2024Subsurface Investigations (Borings/Test Pits)ROBERT CARAVELLAspecial
02/21/2024Public Assembly Emergency LightingNELSON LOPEZprogress
02/21/2024Public Assembly Emergency LightingNELSON LOPEZprogress
02/12/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
02/12/2024Post-installed AnchorsNELSON LOPEZspecial
02/12/2024Mechanical SystemsNELSON LOPEZspecial
02/12/2024FinalNELSON LOPEZprogress
01/29/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/29/2024Emergency and Standby Power Systems (Generator)NELSON LOPEZspecial
01/29/2024Post-installed AnchorsNELSON LOPEZspecial
01/25/2024Mechanical SystemsNELSON LOPEZspecial
01/25/2024FinalNELSON LOPEZprogress
01/10/2024Wall Panels, Curtain Walls, and VeneersNELSON LOPEZspecial
01/10/2024Fire-Resistance Rated ConstructionNELSON LOPEZprogress
01/10/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/10/2024MasonryNELSON LOPEZspecial
01/10/2024Post-installed AnchorsNELSON LOPEZspecial
01/10/2024Sprayed fire-resistant materialsNELSON LOPEZspecial
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYC Sca/BCCEducation—
Project Q01099037 Alteration · Permit Entire · 11/22/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch32
08/26/2026Q00636053-I1Request digital key ↗
08/26/2026Q00651455-P1Request digital key ↗
08/26/2026Q00651455-I1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/23/2026Q01009147-I1Request digital key ↗
08/23/2026Q01009138-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
06/05/2019421086684Open ↗
04/03/2018421086684Open ↗
03/24/2015421086684Open ↗
▸BISWORK PERMIT APPLICATION1
10/24/2018421086684Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/26/2026Q00636053-I1Open ↗
08/26/2026Q00662632-P1Open ↗
08/26/2026Q00662632-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026Q00996063-P1Open ↗
09/02/2026Q01099041-I1Open ↗
09/02/2026Q00980892-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01009138-I1Open ↗
09/02/2026Q00980892-I1Open ↗
09/01/2026Q00996063-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/22/2019421086684Open ↗
10/24/2018421086684Open ↗
10/17/2018421086684Open ↗
▸Safety & Tenant Protection13
▸DOB NOWNYCSCA - Approved Site Safety Plans8
08/13/2026Q01099041-P1Open ↗
08/13/2026Q01099041-P2Open ↗
08/13/2026Q01099037-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist3
08/23/2026Q00980892-P1Open ↗
08/13/2026Q00980892-S5Open ↗
08/13/2026Q00980892-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00980892-S5Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/26/2026Q00636053-I1Open ↗
08/24/2026Q00928454-I1Open ↗
08/24/2026Q00928454-S3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/24/2015421086684Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01164529-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/22/2019421086684Open ↗
03/24/2015421086684Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/22/2019421086684Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q00980892-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00980892-S6Open ↗
▸Approvals, Objections & Sign-offs91
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter32
08/24/2026Q00928454-S1Open ↗
08/24/2026Q00928454-S3Open ↗
08/24/2026Q00928454-S2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)26
08/24/2026Q00928454-S3Open ↗
08/23/2026Q00980892-P1Open ↗
08/15/2026Q01099043-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)14
08/24/2026Q00928454-S3Open ↗
08/13/2026Q00980892-S4Open ↗
08/13/2026Q00980892-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter14
08/24/2026Q00928454-S1Open ↗
08/24/2026Q00928454-S3Open ↗
08/24/2026Q00928454-I1Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/17/2019421086684Open ↗
07/17/2019421086684Open ↗
10/17/2018421086684Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/24/2015421086684Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/22/2019421086684Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/22/2019421086684Open ↗
06/05/2019421086684Open ↗
03/24/2015421086684Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/24/2015421086684Open ↗
▸BISADDITIONAL INFORMATION1
06/05/2019421086684Open ↗
▸Other Documents39
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/24/2026Q00928454-S3Open ↗
08/23/2026Q00980892-P1Open ↗
08/15/2026Q01099043-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProof of Historic Building4
08/23/2026Q00980892-P1Open ↗
08/13/2026Q00996063-I1Open ↗
08/13/2026Q00928454-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00980892-I1Open ↗
08/23/2026Q00980892-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01099043-I1Open ↗
08/13/2026Q00980892-S5Open ↗
▸DOB NOWAlternate Plan 11
08/23/2026Q01009147-I1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/24/2026Q00928454-S3Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00636053-I1Open ↗