← Back
BuildNYC
Elevator apt, fireproof without stores
Wyckoff Gardens (NYCHA)
130 3RD AVENUE · BIN 3336054
💬 Discuss this project
1965Year Built
21Stories
D3Building Class
R6Zoning
509,151 sfGross Floor Area
709Units
LL97 Covered7 Active Violations 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 243,000 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBuilding 1 gas riser replacement2 filings
RoofHigh Maintenance NY FISP facade inspection1p · 1 filing · 3 docs
Floor 1Wyckoff Gardens1 filing · 3 docs
Site & exteriorNYC Housing AuthorityUnder Construction6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4710/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IP Professional Engineering105/01/2026
Queens309/16/2025
Ysrael A. Seinuk108/13/2025
Lakhani & Jordan207/30/2025
Magnusson Architecture and Planning107/15/2025
Shaaban Engineering202/27/2025
RLM Engineering109/28/2023
Hazen and Sawyer207/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hazen & Sawyer403/21/2026
Tarek M. Zeid, P.E403/21/2026
Smep Design & Consultation203/21/2026
R Manetta203/21/2026
Tarek M Zeid P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold410/02/2026
JrcruzGeneral Contractor307/08/2026
Technico ConstructionScaffold203/21/2026
JrcruzScaffold203/21/2026
Alliance Elevator CompanyElectrical203/21/2026
The Maintenance CoElectrical103/21/2026
HY-Lee Electric CoElectrical103/21/2026
Mega Technico, JVScaffold104/09/2026
Eia ElectricElectrical103/22/2026
Richards P and H CoPlumbing107/08/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hudson Peaks Consulting8381408/13/2025
Jon Libasci3068102/27/2025
RLM Engineering6913109/28/2023
JPC Logistics Dba JPCL EN351102/14/2022
Building Lifecycle
All (100)Filed (14)Permit Issued (12)Signed Off (1)Facade (FISP) (15)Violation (27)Inspection (1)Special Inspection (30)
10/01/2026
Permit issued — Construction Fence
B01267025-I1-FN
09/02/2026
Permit issued — Sidewalk Shed
B01266972-I1-SH
05/01/2026
Filed — Alteration
DEMOLITION OF EXISTING CONCRETE WALLS, CURB & PAVEMENT, 5. REMOVAL OF EXISTING LIGHT POLES. AND SUPPLY AND INSTALLATION OF NEW MODIFIED SHIPPING CONTAINERS.
B01392148-I1
04/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01180580-I1
04/30/2026
Permit issued — Suspended Scaffold
B01180580-I1-SC
04/30/2026
Special inspection requirement — Structural Steel - Welding
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/30/2026
Special inspection requirement — Post-installed Anchors
04/23/2026
Special inspection requirement — Final
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/19/2026
Permit issued — Construction Fence
B01273000-I1-FN
09/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267025-I1
09/16/2025
Permit issued — Construction Fence
B01267025-I1-FN
08/26/2025
Cycle 10 facade report signed — UNSAFE
08/19/2025
Permit issued — Construction Fence
B01273000-I1-FN
08/19/2025
Cycle 10 facade inspection completed
08/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01273000-I1
08/13/2025
Filed — Alteration
NYCHA/Wyckoff/Bldg#1- Proposed Structural filing for Re-cladding of Existing Canopy. No change to use or egress. All as per plans filed herewith.
B01230115-S1
08/12/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
08/07/2025
Permit issued — Sidewalk Shed
B01266972-I1-SH
08/06/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01266972-I1
07/30/2025
Filed — Alteration
NYCHA/Wyckoff/Bldg#1- Proposed Structural filing for Re-cladding of Existing Canopy. No change to use or egress. All as per plans filed herewith.
B01230115-S3
07/29/2025
Filed — Alteration
NYCHA/Wyckoff/Bldg#1- Proposed Structural filing for Re-cladding of Existing Canopy. No change to use or egress. All as per plans filed herewith.
B01230115-S2
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
07/15/2025
Filed — Alteration
NYCHA/Wyckoff/Bldg#1- Proposed Structural filing for Re-cladding of Existing Canopy. No change to use or egress. All as per plans filed herewith.
B01230115-I1
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
07/11/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Interior lighting power
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Lighting controls
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Fenestration areas
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Air barrier - visual inspection
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Fenestration air leakage
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Lighting in dwelling units
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Insulation placement and R values
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Maintenance information
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
07/08/2025
Special inspection requirement — Exterior lighting power
GIORGI KHARDZEISHVILI
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
07/03/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
07/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
06/30/2025
Special inspection requirement — Structural Cold-Formed Steel
GIORGI KHARDZEISHVILI
06/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
06/13/2025
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
06/03/2025
Cycle 10 facade report submitted
03/20/2025
Permit issued — General Construction
B01163493-I1-GC
03/14/2025
Permit issued — Suspended Scaffold
B01180580-I1-SC
03/10/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01180580-I1
02/28/2025
Permit issued — Construction Fence
B01162930-I1-FN
02/27/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01162930-I1
02/27/2025
Filed — Alteration
B01163493-I1
12/19/2024
Permit issued — General Construction
B00652741-I1-GC
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2024
Violation issued (FDNY_NOV, closed)
12/08/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/06/2023
Permit issued — Plumbing
B00935941-I1-PL
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedRoma Scaffolding10/01/2026
DOB NOWSidewalk ShedPermit IssuedRoma Scaffolding09/02/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System04/30/2026
DOB NOWConstruction FencePermit IssuedMega Technico, JV02/19/2026
DOB NOWConstruction FencePermit IssuedRoma Scaffolding09/16/2025
DOB NOWConstruction FencePermit IssuedTechnico Construction08/19/2025
DOB NOWSidewalk ShedPermit IssuedRoma Scaffolding08/07/2025
DOB NOWGeneral ConstructionPermit IssuedJrcruz03/20/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System03/14/2025
DOB NOWConstruction FencePermit IssuedJrcruz02/28/2025
DOB NOWGeneral ConstructionPermit IssuedJrcruz12/19/2024
DOB NOWPlumbingPermit IssuedRichards P and H Co11/06/2023
BISEQISSUEDR.S.N. Construction Co05/27/2016
BISOTISSUEDR.S.N. Construction Co05/16/2016
BISEQISSUEDR.S.N. Construction Co03/14/2016
BISEQISSUEDR.S.N. Construction Co06/04/2015
BISOTISSUEDR.S.N. Construction Co06/02/2015
BISEQISSUEDSkyworx Contracting03/12/2015
BISEQISSUEDR.S.N. Construction Co03/12/2015
BISEQISSUEDAkro General Contracting03/24/2010
BISEQISSUEDAkro General Contracting10/28/2009
BISEQISSUEDMBR Contracting10/19/2009
BISEQISSUEDAkro General Contracting09/24/2009
BISOTISSUEDV. C. Vitanza Sons09/14/2005
BISPLISSUEDA.M.K. Contracting04/18/2002
BISOTISSUEDA.M.K. Contracting03/22/2002
BISPLISSUEDWDF06/22/2001
BISPLISSUEDAmk Contracting06/14/2001
BISOTISSUEDWDF02/18/2000
BISPLISSUEDWDF02/18/2000
BISPLISSUEDAlasia Co JV10/20/1999
BISOTISSUEDAlasia Co JV10/13/1999
BISFPISSUEDIdeal Fire Control12/15/1995
BISOTISSUEDA.H.A. General Construction03/06/1995
BISPLISSUEDDelphi Plumbing & Heating12/29/1994
BISOTISSUEDA.H.A. General Construction12/29/1994
1 project · most recent 08/13/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2025——Ventilation Systems
Ventilation
Greenheck CUE-100HP-VG 500 CFM · Kitchen Exhaust ×1
2 projects · most recent 08/13/2025
Water/Sanitary Storm
FiledStatusContractorScope
08/13/2025——Water/Sanitary
07/05/2022——Storm
7 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025CompleteHexagon Construction & Electrical Group—
07/02/2025Permit IssuedAujla Electric—
03/15/2024CompleteTri-State Electrical & Mechanical IGeneral Wiring
09/06/2023CompleteA.T.J. Electrical Co—
09/06/2023CompleteA.T.J. Electrical CoGeneral Wiring
11/22/2022CompleteEia ElectricGeneral Wiring
06/19/2022CompleteEia ElectricGeneral Wiring
2 projects · most recent 05/01/2026
Concrete
FiledStatusContractorScope
05/01/2026——Concrete
08/13/2025——2 scope_items
4 projects · most recent 09/16/2025
Fence Sidewalk Shed
FiledStatusContractorScope
09/16/2025Permit IssuedRoma ScaffoldingFence
08/18/2025Permit IssuedMega Technico, JVFence
08/06/2025Permit IssuedRoma ScaffoldingSidewalk Shed
02/27/2025Permit IssuedJrcruzFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/08/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
04/30/2026Structural Steel - Welding—special
04/30/2026Energy Code Compliance Inspections—progress
04/30/2026Fire-Resistant Penetrations and Joints—special
04/30/2026Post-installed Anchors—special
04/23/2026Final—progress
04/23/2026Tenant Protection Plan Compliance—special
08/12/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/16/2025Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
07/11/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/11/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/09/2025Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
07/08/2025Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/08/2025Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
07/08/2025Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Fenestration areasGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Air barrier - visual inspectionGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Fenestration air leakageGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Lighting in dwelling unitsGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Insulation placement and R valuesGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Fenestration and door U-factor and product ratingsGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Maintenance informationGIORGI KHARDZEISHVILIenergy_progress
07/08/2025Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
07/08/2025Exterior lighting powerGIORGI KHARDZEISHVILIenergy_progress
07/03/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
Latest 25 of 34.
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/29/2026B00652741-I1Request digital key ↗
08/29/2026B00652741-S1Request digital key ↗
08/26/2026B00935941-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION12
06/14/2016340238424Open ↗
03/19/2016340232616Open ↗
06/12/2015340238424Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
03/21/2017340128999Open ↗
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/29/2026B00652741-I1Open ↗
08/29/2026B00652741-S1Open ↗
08/26/2026B00935941-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/23/2017340128999Open ↗
03/23/2017340128999Open ↗
03/22/2017340232616Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01230115-S1Open ↗
08/29/2026B01230115-S2Open ↗
08/24/2026B00652741-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01230115-S1Open ↗
08/29/2026B01230115-S2Open ↗
08/24/2026B00652741-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/25/2010320140824Open ↗
10/08/2009320077787Open ↗
09/25/2009320082227Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
04/07/2014340128999Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/25/2010320140824Open ↗
10/08/2009320077787Open ↗
09/25/2009320082227Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
04/07/2014340128999Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
04/07/2014340128999Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/08/2009320077787Open ↗
09/25/2009320082227Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/07/2014340128999Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/23/2017340128999Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/25/2010320140824Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00935941-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/23/2017340128999Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/07/2014340128999Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/23/2017340128999Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/07/2014340128999Open ↗
▸BISNYCECC ANALYSIS1
04/07/2014340128999Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
04/07/2014340128999Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/29/2026B00652741-I1Open ↗
08/29/2026B00652741-S1Open ↗
08/26/2026B00935941-I1Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/23/2017340128999Open ↗
03/22/2017340232616Open ↗
03/22/2017340238424Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/29/2026B00652741-I1Open ↗
08/13/2026B01230115-I1Open ↗
08/13/2026B01230115-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B01230115-I1Open ↗
08/13/2026B01230115-S3Open ↗
08/13/2026B01230115-S1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/25/2010320140824Open ↗
10/08/2009320077787Open ↗
09/25/2009320082227Open ↗
▸BISSHED LETTER3
06/14/2016340238424Open ↗
06/12/2015340238424Open ↗
06/12/2015340238424Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/07/2011320140824Open ↗
03/07/2011320082227Open ↗
03/01/2011320077787Open ↗
▸BISSUPERSEDING LETTER2
06/12/2015340238424Open ↗
06/12/2015340238424Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/23/2017340128999Open ↗
04/07/2014340128999Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
03/25/2010320140824Open ↗
10/08/2009320077787Open ↗
09/25/2009320082227Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
03/11/2015340232616Open ↗
03/11/2015340238424Open ↗
04/07/2014340128999Open ↗
▸BISADDITIONAL INFORMATION1
12/09/2015340238424Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/23/2017340128999Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01180580-I1Open ↗