| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00891167 | 873 JEROME STREET BROOKLYN | Alteration | Permit Issued | 08/21/2023 | 10/16/2026 | Design WESLER-COHEN ASSOCIATES Owner NYC PARKS & RECREATION Contractor FJP MECHANICAL INC | PL work correspondent to installation of a new water line and RPZ within a existing comfort station @Jerome Playground Comfort Station. All … |
| Q01231608 | 146-50 REEVES AVENUE QUEENS | Alteration | Permit Issued | 05/28/2025 | 10/09/2026 | Design SEAN P. CUNNINGHAM PE, PC Owner NYC SCHOOL CONSTRUCTION Contractor PLAZA CONSTRUCTION LLC | John Bowne HS-NEw Building- SOE filing for the following: BUILDING FOOTINGS, DETENTION TANKS, CULTEC RECHARGER, DRAINS & PIPES, all filed in… |
| B00596291 ↗ | 878 PARK AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 10/07/2026 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | NYCHA Sumner BOILER Bldg #2_ PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fir… |
| B01228832 ↗ | 175 HOYT STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design RKTB ARCHITECTS Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/B1_Replace apt. toilet exhaust grilles w/ new grilles w/ OBDs. Install recirc. kitchen hoods. Replace radiator valves, vents &… |
| B01228854 ↗ | 181 HOYT STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/Bldg#3- (181 & 187 HOYT STREET). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitio… |
| B01228869 ↗ | 415 BALTIC STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design RKTB ARCHITECTS Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/Bldg4W_ Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off… |
| Person | Filings | Most recent |
|---|---|---|
| TATIANA BERMUDEZ | 305 | 10/09/2026 |
| tarek zeid | 4 | 05/19/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| Cameron Engineering | 32 | 10/01/2026 |
| Lakhani & Jordan | 19 | 07/21/2026 |
| Tarek M. Zeid, PE | 18 | 07/29/2026 |
| RKTB Architects | 16 | 07/21/2026 |
| Ismael Leyva Architects | 11 | 12/02/2025 |
| Iaq Systems | 9 | 06/16/2021 |
| The Liro Group | 6 | 07/08/2026 |
| Dewberry Engineers | 5 | 05/20/2025 |
| June Daniel Architect | 5 | 10/01/2026 |
| Alexander Badalamenti | 4 | 08/18/2026 |
| Hansen Engineering | 4 | 07/21/2026 |
| Seal Engineering | 4 | 09/26/2022 |
| Charles G. Michel Engineering | 3 | 10/28/2019 |
| JMV Architect | 3 | 08/27/2026 |
| JRS Engineering Services | 3 | 03/21/2024 |
| Lizardos Engineering | 3 | 08/01/2025 |
| Magnusson Architecture and Planning | 3 | 08/13/2025 |
| ZI Engineering | 3 | 02/03/2022 |
| 360 Engineering | 2 | 05/09/2023 |
| BGM Engineering | 2 | 06/03/2025 |
| Dseny Engineering Services | 2 | 05/29/2025 |
| Greenman-Pedersen | 2 | 08/27/2026 |
| Ola Consulting Engineers | 2 | 03/26/2020 |
| RA Engineering | 2 | 10/11/2024 |
| Sean P. Cunningham PE | 2 | 07/25/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Dynamic Contracting | 22 | 08/18/2026 |
| Technico Construction | 15 | 10/12/2026 |
| Dynamic US | 11 | 12/02/2025 |
| Navillus Tile | 10 | 07/30/2025 |
| Mega Technico, JV | 5 | 06/16/2026 |
| Richards P and H Co | 5 | 10/01/2026 |
| Richards Plum & Heating Co | 5 | 10/01/2026 |
| The Morganti Group | 5 | 06/18/2025 |
| D.D.S. Mechanical PBG & Heating | 4 | 08/13/2025 |
| NKN Construction | 4 | 08/18/2026 |
| V. C. Vitanza Sons | 4 | 06/16/2026 |
| Duo Plumbing & Heating | 3 | 08/04/2025 |
| Forte Construction | 3 | 06/25/2026 |
| MPCC | 3 | 11/21/2023 |
| Scaran Plumbing | 3 | 08/01/2025 |
| T. Moriarty & Son | 3 | 03/29/2022 |
| A-1 Undergrnd Plumbing Con | 2 | 04/27/2021 |
| ACS System Associates | 2 | 10/01/2024 |
| Citnalta Construction | 2 | 07/29/2026 |
| FJP Mechanical | 2 | 06/11/2026 |
| KG Construction Services | 2 | 05/09/2023 |
| Plaza Construction | 2 | 03/09/2026 |
| T.N.T. Plumbing & Heating | 2 | 10/28/2019 |
| Varsity Plumbing and Heating | 2 | 08/27/2026 |
| WDF | 2 | 12/08/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| New York City Housing Authority | 55 | 10/01/2026 |
| NYC School Construction | 16 | 10/12/2026 |
| NYC School Construction Authority | 14 | 06/25/2026 |
| NYC Department of Correction | 9 | 08/13/2021 |
| Richmond University Medical Center | 5 | 10/09/2026 |
| City University of New York | 3 | 08/27/2026 |
| 27-11 49th Ave Realty | 2 | 10/16/2019 |
| Fire Department of the City of New York | 2 | 07/29/2026 |
| St Marys Romanian Orthodox CH | 2 | 10/05/2022 |
| Ariana Realty | 1 | 10/28/2019 |
| Broadwall Management | 1 | 12/23/2019 |
| Dasny | 1 | 07/22/2022 |
| Exec. Director DDCM/CUNY | 1 | 09/18/2019 |
| NYC Department of Design and Construction | 1 | 08/31/2021 |
| NYC Department of Parks and Recreation | 1 | 08/21/2023 |
| NYC Parks | 1 | 06/11/2026 |
| NYPD | 1 | 07/18/2023 |
| Parisi Bay Street | 1 | 10/24/2019 |
| Rocklyn Asset | 1 | 05/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| JMV Associates | 13 | 10/01/2026 |
| JMV Architect | 1 | 08/27/2026 |
| Precision 3Sixty NYC | 1 | 05/09/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00891167 | 873 JEROME STREET BROOKLYN | Alteration | Permit Issued | 08/21/2023 | 10/16/2026 | Design WESLER-COHEN ASSOCIATES Owner NYC PARKS & RECREATION Contractor FJP MECHANICAL INC | PL work correspondent to installation of a new water line and RPZ within a existing comfort station @Jerome Playground Comfort Station. All … |
| Q01231608 | 146-50 REEVES AVENUE QUEENS | Alteration | Permit Issued | 05/28/2025 | 10/09/2026 | Design SEAN P. CUNNINGHAM PE, PC Owner NYC SCHOOL CONSTRUCTION Contractor PLAZA CONSTRUCTION LLC | John Bowne HS-NEw Building- SOE filing for the following: BUILDING FOOTINGS, DETENTION TANKS, CULTEC RECHARGER, DRAINS & PIPES, all filed in… |
| B00596291 ↗ | 878 PARK AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 10/07/2026 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | NYCHA Sumner BOILER Bldg #2_ PLUMBING related to replacement of existing steam-fed instantaneous domestic hot water heaters with new gas-fir… |
| B01228832 ↗ | 175 HOYT STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design RKTB ARCHITECTS Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/B1_Replace apt. toilet exhaust grilles w/ new grilles w/ OBDs. Install recirc. kitchen hoods. Replace radiator valves, vents &… |
| B01228854 ↗ | 181 HOYT STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/Bldg#3- (181 & 187 HOYT STREET). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitio… |
| B01228869 ↗ | 415 BALTIC STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/24/2026 | Design RKTB ARCHITECTS Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/Bldg4W_ Replace all plumbing fixtures in kitchen and bathroom of all apartments. Replace all Domestic Hot Water riser shut off… |
| B01230153 ↗ | 272 WYCKOFF STREET BROOKLYN | Alteration | Permit Issued | 07/15/2025 | 09/24/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Wyckoff/ Bldg#3- Proposed Arch. scope filed for replacement of apt. kitchens and bathrooms, conversion of units for section 504 compl… |
| B01229548 ↗ | 195 HOYT STREET BROOKLYN | Alteration | Permit Issued | 08/07/2025 | 09/23/2026 | Design LAKHANI & JORDAN Owner NYCHA Contractor MEGA TECHNICO, JV INC | NYCHA/Gowanus/Bldg#6- (195 Hoyt Street/413 Baltic Street) Replace all PL fixtures in kitchen & bathroom of all apts. Replace all DHW riser s… |
| S00724254 | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/18/2026 | 09/21/2026 | Design ALEXANDER BADALAMENTI Contractor NKN CONSTRUCTION INC | SLB Bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SLB BUILDING -- 3RD FLOOR AND 5TH FLOOR ROOF SETBACKS-- LOCATED AT RICHMOND UN… |
| S01112859 | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 10/22/2024 | 09/04/2026 | Design TDM CONSULTING ENGINEER Contractor NKN CONSTRUCTION INC | RUMC- STRUCTURAL WORK ASSOCIATED WITH ROOF COOLING TOWER REPLACEMENT, AS PER PLANS FILED HEREWITH; NO CHANGES TO EGRESS, USE OR OCCUPANCY. |
| S00881156 | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 07/05/2023 | 08/25/2026 | Design STEVEN PAUL HAMMER Contractor AMERICON CONSTRUCTION INC. | RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Out… |
| M00990578 | 160 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 02/27/2025 | 08/06/2026 | Design GREENMAN-PEDERSEN, INC. Contractor SIMPLE AIR HVAC CORP | The Mechanical work shall comply with MC 107, MC 1202 materials, MC 1203 Joints, MC 1204 insulation, MC 1205 valves, MC 1206 installation, a… |
| Q01426049 | 64-34 175TH STREET QUEENS | Alteration | Permit Issued | 07/08/2026 | 07/31/2026 | Design HANSEN ENGINEERING, PC Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 216Q- Support of Excavation in conjunction with 4 story new building #Q08026647. Filed for for added cast-in-place line boxes. All as per … |
| B01029846 | 106 AVENUE X BROOKLYN | Alteration | Signed-off | 03/25/2025 | 07/30/2026 | Design PZSE Contractor TECHNICO CONSTRUCTION | 358K- PV SYSTEM DESIGN & PV SUPPORT SYSTEM PLANS FILED IN CONJUNCTION TO NB#B00795046. ALL AS PER PLANS FILED HEREWITH. |
| X01432642 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Filed — no permit on record | 07/25/2026 | — | Design SEAN P. CUNNINGHAM PE, PC | — |
| B01312946 ↗ | 4012 FORT HAMILTON PARKWAY BROOKLYN | Alteration | Permit Issued | 01/16/2026 | 07/20/2026 | Design TECTONIC ENGINEERING Contractor FORTE CONSTRUCTION CORP | 4K---(CANOPY STRUCTURAL)--- PV SYSTEM DESIGN & PV SUPPORT SYSTEM PLANS FILED IN CONJUNCTION TO NB#B08023579 & B01294395 . ALL AS PER PLANS … |
| B01405958 | 873 JEROME STREET BROOKLYN | Alteration | Permit Issued | 06/11/2026 | 07/08/2026 | Design MATRIX NEW WORLD ENGINEERING Owner NYC Parks Contractor FJP MECHANICAL INC | Jerome Playground reconstruction to install storm water system only on site. All as per plans filed herewith. |
| S01226062 ↗ | 288 KISSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 07/30/2025 | 06/22/2026 | Design LIZARDOS ENGINEERING Contractor NKN CONSTRUCTION INC | STRUCTURAL FILED TO INDICATE EMERG. ROOF REPLACEMENT OF RESIDENCE BLDG, REMOVING DOWN TO PARTIAL EXISTING BALLASTED ROOFING SYSTEM.INSTALL N… |
| X00760109 ↗ | 870 EAST 180TH STREET BRONX | New Building | Permit Issued | 09/30/2022 | 06/04/2026 | Contractor CRESCENT STREET CONSTRUCT | Structural work associated with the construction of a new building. No changes to the use, egress, and occupancy are proposed under this app… |
| X01085050 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 08/23/2024 | 05/29/2026 | Design PURE POWER ENGINEERING, INC. Contractor THE MORGANTI GROUP, INC | 138X- PV SYSTEM DESIGN & PV SUPPORT SYSTEM PLANS FILED IN CONJUNCTION TO NB#201204268 & EL # X01264564. ALL AS PER PLANS FILED HEREWITH. |
| B00596772 ↗ | 44 MARCUS GARVEY BOULEVARD BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 05/15/2026 | Design JUNE DANIEL ARCHITECT Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | NYCHA Sumner BOILER-BLDG #12- Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or … |
| B01231963 | 6303 14TH AVENUE BROOKLYN | Alteration | Permit Issued | 06/03/2025 | 05/01/2026 | Design BGM ENGINEERING Contractor TECHNICO CONSTRUCTION | 82K-NB_ Support of Excavation for Installation of New Precast Transformer Vault. This work is filed in conjunction to NB # B00852836. |
| B01231979 | 6303 14TH AVENUE BROOKLYN | Alteration | Permit Issued | 05/29/2025 | 05/01/2026 | Contractor TECHNICO CONSTRUCTION | 82K-NB_ SUPPORT OF EXCAVATION FOR UTILITY INSTALLATION ON SIDEWALK AND STREET. THIS WORK IS FILED IN CONJUNCTION TO NB # B00852836. |
| X00224139 | 475 GRAND CONCOURSE BRONX | Alteration | Permit Issued | 09/18/2019 | 04/22/2026 | Design DEWBERRY ENGINEERS INC Owner EXEC. DIRECTOR DDCM/CUNY Contractor ACS SYSTEM ASSOCIATES INC. | Proposed replacement of air handling units and piping. All as per plans filed herewith. |
| B00443693 ↗ | 290 FROST STREET BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 04/17/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA BOILER- Bldg 4- Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms |
| X00823131 | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Permit Issued | 06/27/2023 | 04/09/2026 | Design GREENMAN-PEDERSEN, INC. Contractor ARK SYSTEMS ELECTRIC CORP | Proposed new structural steel support under new roof openings for new mechanical equipment and structural steel support for new openings in … |
| B08016837 ↗ | 995 MYRTLE AVENUE BROOKLYN | Alteration | Permit Issued | 11/15/2022 | 04/02/2026 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor WDF INC | Structural filing for Removal of existing steam piping and installation of new piping. Bldg 8 All as per plans filed herewith |
| B00447694 ↗ | 340 FROST STREET BROOKLYN | Alteration | Permit Issued | 01/27/2021 | 03/25/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA BOILER- Building 6: Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms |
| Q01359948 | 105 DUANE ROAD QUEENS | Alteration | Permit Issued | 02/19/2026 | 03/24/2026 | Design TAREK M. ZEID, PE, PLLC Owner FDNY Contractor CITNALTA CONSTRUCTION | Construction Fence filed in conjunction to Fort Totten Park Electrical Infrastructure Upgrade under SBS applications filed for NB (20220099)… |
| B00443566 ↗ | 60 KINGSLAND AVENUE BROOKLYN | Alteration | Permit Issued | 01/27/2021 | 03/05/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuu… |
| B00447354 ↗ | 330 FROST STREET BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 02/12/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA Boiler Building # 5 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms |
| B00447714 ↗ | 417 MORGAN AVENUE BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 02/10/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA BOILER- Building 7 - Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms |
| B01050998 | 106 AVENUE X BROOKLYN | Alteration | Signed-off | 06/14/2024 | 02/09/2026 | Contractor TECHNICO CONSTRUCTION | 358K- SOE for Utilities filed in Conjunction with NB #B00795046. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLIC… |
| B00447160 ↗ | 50 DEBEVOISE AVENUE BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 02/04/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA BOILER- BUILDING 10-WORK IN TANK ROOM ONLY-DEMOLITION OF STEAM AND CONDENSATE PIPING, CONDENSATE PUMPS AND VACUUM PUMPS. REPLACEMENT O… |
| B00447683 ↗ | 20 DEBEVOISE AVENUE BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 02/04/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA Boiler-BUILDING #9-PL- CIVIL-Natural Gas piping will be run underground from gas meter room and domestic hot water heater rooms |
| B00448967 ↗ | 280 FROST STREET BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 02/04/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | PROVIDE LOOSE LINTEL FOR LOUVER OPENING ON MASONRY WALL REPAIR AND EXTEND EX.CONCRETE PAD PROVIDE BOILER ACCESS PLATFORM PROVIDE OUTDOOR FLU… |
| B00446807 ↗ | 280 FROST STREET BROOKLYN | Alteration | Signed-off | 01/21/2021 | 02/03/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building 3 - Removal of existing hot water tank, cold water supply and hot water supply/return to the tank. New gas water heaters, expansion… |
| Q01353047 ↗ | 423 ABBOTT ROAD QUEENS | Alteration | Filed — no permit on record | 01/30/2026 | — | Owner FDNY | — |
| Q00949632 | 64-34 175TH STREET QUEENS | Alteration | Permit Issued | 03/11/2024 | 01/28/2026 | Design HANSEN ENGINEERING, PC Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 216Q- Support of Excavation in conjunction with 4 story new building #Q08026647. Filed for Foundation, Detention Tanks, Con Ed vault &Condu… |
| X01179429 ↗ | 3850 REVIEW PLACE BRONX | Alteration | Permit Issued | 02/20/2025 | 01/28/2026 | Design PILLORI ASSOCIATES Contractor TECHNICO CONSTRUCTION | 515X- Support of Excavation for Utilities related to Con Ed Vault correspondent to NB application # X00875055. All as per plans filed herew… |
| B00950994 | 106 AVENUE X BROOKLYN | Alteration | Signed-off | 11/13/2023 | 01/26/2026 | Design HANSEN ENGINEERING, PC Contractor TECHNICO CONSTRUCTION | 358K- Support of Excavation in conjunction with 3 story new building # B00795046. Filed for Foundation and Detention Tanks. All as per plan… |
| Q01093550 | 64-20 175TH STREET QUEENS | Alteration | Signed-off | 08/16/2024 | 01/26/2026 | Design HANSEN ENGINEERING, PC Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 216Q- EB_ SOE DESIGN FOR THE EXISTING BUILDING ELEVATOR LIFT PIT AND ENTRANCE STAIR REMOVALS FILED IN CONJUNCTION WITH Q00857440. ALL AS PE… |
| Q08008041 | 65-30 DIETERLE CRESCENT QUEENS | Alteration | Permit Issued | 09/26/2022 | 01/26/2026 | Design LMW ENGINEERING GROUP LLC Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 174Q- Support of Excavation in conjunction with 2 story new building # 421902686 |
| B00447989 ↗ | 20 DEBEVOISE AVENUE BROOKLYN | Alteration | Signed-off | 01/21/2021 | 01/22/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipi… |
| B00596277 ↗ | 231 THROOP AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 01/21/2026 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | Replacement of: existing vacuum pump and connections; control valve and by-pass valve system; steam piping to existing DHWH. Installation o… |
| B00444062 ↗ | 290 FROST STREET BROOKLYN | Alteration | Signed-off | 01/21/2021 | 01/05/2026 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building #4-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipi… |
| B00595993 ↗ | 10 LEWIS AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 12/24/2025 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | STRUCTURAL WORK -NYCHA SUMNER HOUSES BUILDING # 4. REPAIR TO EXISTING MECHANICAL ROOM. |
| X00684564 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 02/25/2022 | 12/18/2025 | Design TAREK M. ZEID, PE, PLLC Contractor THE MORGANTI GROUP, INC | Construction Fence in conjunction with SOE/ FO & NB Phases. All as per plans filed herewith. |
| B00447308 ↗ | 295 JACKSON STREET BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 11/20/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA Boiler - Building 11 - Civil General Construction work to include underground fuel oil tank removal. All as per plans filed herewith |
| B00595847 ↗ | 868 PARK AVENUE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 11/18/2025 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor RICHARDS PLUM & HTG CO,IN | NYCHA Sumner BOILER Bldg #1- PLUMBING work related to the replacement of existing steam-fed instantaneous domestic hot water heaters with n… |
| B00447246 ↗ | 295 JACKSON STREET BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 11/13/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building 11-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipi… |
| Q00979347 | 88-40 179TH PLACE QUEENS | Alteration | Signed-off | 12/19/2023 | 10/31/2025 | Design TAREK M. ZEID, PE, PLLC Owner NYC SCHOOL CONSTRUCTION Contractor NAVILLUS TILE INC | SIDEWALK SHED FILED IN CONJUNCTION WITH 4 STORY ADDITION TO SCHOOL BUILDING Q08023576. ALL AS PER PLANS FILED HEREWITH. |
| Q00990552 | 88-40 179TH PLACE QUEENS | Alteration | Signed-off | 01/16/2024 | 08/29/2025 | Design RA ENGINEERING LLP Owner NYC SCHOOL CONSTRUCTION Contractor NAVILLUS TILE INC | SOE FOR 4 STORY NEW SCHOOL ADDITION. |
| B01228846 ↗ | 178 BOND STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01228860 ↗ | 423 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229037 ↗ | 420 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229042 ↗ | 420 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229048 ↗ | 241 HOYT STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B01229050 ↗ | 244 BOND STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B01229536 ↗ | 182 BOND STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229672 ↗ | 427 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229680 ↗ | 414 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B01229691 ↗ | 426 BALTIC STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B01229710 ↗ | 225 HOYT STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design RKTB ARCHITECTS Owner NYCHA | — |
| B01229721 ↗ | 224 BOND STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B00443568 ↗ | 60 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 01/27/2021 | 07/25/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Bldg.2: Demolition of exist. HW tank,cold water supply & HW supply/return to the tank.Install new gas WH, HW recirculation pumps &associated… |
| B00447668 ↗ | 340 FROST STREET BROOKLYN | Alteration | Signed-off | 01/27/2021 | 07/25/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building 6 -Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipi… |
| B00447707 ↗ | 417 MORGAN AVENUE BROOKLYN | Alteration | Signed-off | 01/27/2021 | 07/25/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building -7- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pip… |
| Q01245728 | 88-40 179TH PLACE QUEENS | Alteration | Signed-off | 06/25/2025 | 07/21/2025 | Design TAREK M. ZEID, PE, PLLC Owner NYC SCHOOL CONSTRUCTION Contractor NAVILLUS TILE INC | SUPPORTED SCAFFOLD FILED IN CONJUNCTION WITH 4 STORY ADDITION TO SCHOOL BUILDING Q08023576. ALL AS PER PLANS FILED HEREWITH. |
| B01230115 ↗ | 130 3RD AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/15/2025 | — | Design LAKHANI & JORDAN Owner NYCHA | — |
| B01230128 ↗ | 185 NEVINS STREET BROOKLYN | Alteration | Filed — no permit on record | 07/15/2025 | — | Owner NYCHA | — |
| B00443443 ↗ | 389 MORGAN AVENUE BROOKLYN | Alteration | Permit Issued | 01/21/2021 | 07/10/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | NYCHA Boiler-Building 8-Natural Gas piping will be run underground from the gas meter room and domestic hot water heater rooms. |
| B00443515 ↗ | 275 JACKSON STREET BROOKLYN | Alteration | Permit Issued | 01/27/2021 | 04/23/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC US, INC | Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuu… |
| B08016789 ↗ | 1031 MYRTLE AVENUE BROOKLYN | Alteration | Permit Issued | 11/15/2022 | 04/22/2025 | Design CAMERON ENGINEERING Owner NYC Housing Authority Contractor WDF INC | Structural filing for Removal of existing steam piping and installation of new piping. Bldg 7 All as per plans filed herewith |
| S01026627 | 555 PAGE AVENUE STATEN ISLAND | Alteration | Permit Issued | 09/24/2024 | 04/07/2025 | Design IMEG Consulting Corp. Contractor ACS SYSTEM ASSOCIATES INC. | 6R-Temporary chiller will be installed while the existing mechanical equipment is being replaced |
| Q01146750 | 88-40 179TH PLACE QUEENS | Alteration | Signed-off | 11/26/2024 | 03/28/2025 | Owner NYC SCHOOL CONSTRUCTION Contractor PHASE 1 GROUP INC | 95Q- SOE/Utilities for onsite drainage system & site utilities & plumbing, filed in conjunction with New 4 story school building # Q08023576 |
| B01000106 | 9115 5TH AVENUE BROOKLYN | Alteration | Permit Issued | 02/18/2024 | 03/27/2025 | Design BGM ENGINEERING Contractor INFINITY CONTRACTING SERV | 104K- SUPPORT OF EXCAVATION PLANS HEREWITH BEING FILED FOR THE INSTALLATION OF FOUNDATION WATERPROOFING |
| X01167015 | 475 GRAND CONCOURSE BRONX | Alteration | Filed — no permit on record | 02/10/2025 | — | Design DEWBERRY ENGINEERS INC | — |
| B00443555 ↗ | 275 JACKSON STREET BROOKLYN | Alteration | Signed-off | 01/27/2021 | 01/13/2025 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | B1-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW… |
| B00995397 ↗ | 3021 WEST 25TH STREET BROOKLYN | Alteration | Signed-off | 02/15/2024 | 01/08/2025 | Design THE LIRO GROUP Contractor D.D.S. MECH PBG&HTG CORP | BLDG 3- NYCHA- EMERGENCY WORK _Replacement of gas piping and risers |
| X00708142 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Signed-off | 03/30/2022 | 01/03/2025 | Design VACHRIS ENGINEERING, PC Contractor THE MORGANTI GROUP, INC | 138X- Proposed shoring and excavation for 3 story new building, application # 201204268. All as per plans filed herewith. |
| B00447179 ↗ | 50 DEBEVOISE AVENUE BROOKLYN | Alteration | Signed-off | 01/21/2021 | 12/27/2024 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | BUILDING10-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipin… |
| X00224238 | 475 GRAND CONCOURSE BRONX | Alteration | Signed-off | 09/18/2019 | 12/23/2024 | Design DEWBERRY ENGINEERS INC Contractor VARSITY PLBG AND HTG INC | Hostos CC- Related Plumbing work for replacement of air handling units and piping. |
| X00830005 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Signed-off | 02/16/2023 | 12/19/2024 | Design JRS ENGINEERING SERVICES Contractor THE MORGANTI GROUP, INC | 138X- Proposed SOE for Site Utility (Sewer) filed in conjunction with NB # 201204268. All as per plans filed herewith |
| B00444118 ↗ | 389 MORGAN AVENUE BROOKLYN | Alteration | Signed-off | 01/21/2021 | 12/17/2024 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building 8-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipin… |
| B01046032 ↗ | 295 JACKSON STREET BROOKLYN | Alteration | Signed-off | 05/31/2024 | 12/12/2024 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Bldg 11 - Proposed Boiler application filed to remove 4 existing dual fuel boilers (Oil/Gas) and replace with 3 new GAS boilers. All as per… |
| B00447410 ↗ | 330 FROST STREET BROOKLYN | Alteration | Signed-off | 01/21/2021 | 11/21/2024 | Design CAMERON ENGINEERING Owner NYCHA Contractor DYNAMIC CONTRACTING CORP | Building #5-Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas pipi… |
| B00995391 ↗ | 3040 WEST 24TH STREET BROOKLYN | Alteration | Signed-off | 02/15/2024 | 10/10/2024 | Design THE LIRO GROUP Contractor D.D.S. MECH PBG&HTG CORP | BLDG 1- NYCHA- Plumbing Scope of work for Replacement of gas piping and risers. All as per plans filed herewith. |
| Q08007929 | 195-15 73RD AVENUE QUEENS | Alteration | Signed-off | 09/26/2022 | 05/14/2024 | Design SEAL ENGINEERING PC Owner NYC SCHOOL CONSTRUCTION Contractor NAVILLUS TILE INC | PS 26Q - Proposed Fence and shed filed in conjunction to: 4 Story NB # 421899930 & Q00548727 & Q00594545. All as per plans filed herewit… |
| S00763429 | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 08/03/2022 | 04/09/2024 | Design ALEXANDER BADALAMENTI Contractor NKN CONSTRUCTION INC | SLB Bldg-EMERGENCY -Plumbing-WORK FOR 7th Floor Roof FOR SLB BUILDING LOCATED AT RICHMOND UNIVERSITY MEDICAL CENTER. ALL AS PER PLANS FILED… |
| B00657227 | 2953 BRIGHTON 6 STREET BROOKLYN | Alteration | Signed-off | 01/18/2022 | 03/26/2024 | Design TAREK M. ZEID, PE, PLLC Contractor T. MORIARTY & SON, INC | 253K-Proposed Construction Fence correspondent to 4 Story New Building application # 322050917 for correspondent SOE and foundation phase on… |
| X00606899 | 4200 GRACE AVENUE BRONX | Alteration | Signed-off | 10/08/2021 | 03/08/2024 | Design ZI ENGINEERING, P.C Contractor TECHNICO CONSTRUCTION | 87X- Proposed Excavation for NB application # 201204099. All as per plans filed herewith. |
| B00897236 ↗ | 2410 SURF AVENUE BROOKLYN | Alteration | Signed-off | 06/30/2023 | 02/15/2024 | Design THE LIRO GROUP Contractor D.D.S. MECH PBG&HTG CORP | BLDG 2- NYCHA- EMERGENCY WORK _Replacement of gas piping and risers |
| X00962331 | 2080 CRUGER AVENUE BRONX | Alteration | Signed-off | 11/21/2023 | 02/05/2024 | Design TAREK M. ZEID, PE, PLLC Contractor MPCC CORP | 105X- Proposed Support of Excavation for Utilities related to 4 Story NB and all related applications. All As per plans filed herewith |
| Q00582389 | 34-06 214TH LANE QUEENS | Alteration | Signed-off | 11/16/2021 | 01/23/2024 | Design ZI ENGINEERING, P.C Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 41Q- Proposed Excavation for NB application & Link Building as described in related application section. All as per plans filed herewith. |
| Q00731012 | 34-06 214TH LANE QUEENS | Alteration | Signed-off | 05/05/2022 | 01/15/2024 | Design JRS ENGINEERING SERVICES Owner NYC SCHOOL CONSTRUCTION Contractor TECHNICO CONSTRUCTION | 41Q- Proposed SOE Utility Drainage application filed correspondent to NB application 421898058 as described in related application section.… |
| X00583080 | 1260 WARD AVENUE BRONX | Alteration | Signed-off | 08/31/2021 | 12/12/2023 | Design TAREK M. ZEID, PE, PLLC Contractor NAVILLUS TILE INC | PROPOSED CONSTRUCTION FENCE IN CONJUNCTION WITH REMOVAL OF TCB AND NEW BUILDING APPLICATIONS. ALL AS PER PLANS FILED HEREWITH. |
| Q00342597 | 244-04 NORTH CONDUIT AVENUE QUEENS | Alteration | Signed-off | 06/24/2021 | 10/19/2023 | Design TAREK M. ZEID, PE, PLLC Contractor CITNALTA CONSTRUCTION | 116th Precinct (NYPD) - Construction Fence in conjunction with 2 story new building (420665211) and related applications. |
| B00350265 | 4308 4TH AVENUE BROOKLYN | Alteration | Signed-off | 05/19/2020 | 09/28/2023 | Design BRAND ACCESS SOLUTIONS Contractor SAFWAY ATLANTIC, LLC | 557K- Installation of temporary fence during construction of new 4 Story School Building under app # 302582783, filed separately. No change … |
| X00921274 | 2058 LAFAYETTE AVENUE BRONX | Alteration | Signed-off | 08/24/2023 | 09/28/2023 | Design VACHRIS ENGINEERING, PC Contractor THE MORGANTI GROUP, INC | 138X-Remediation of emerg. conditions due to partial formwork failure in response to STOP WORK ORDER. Work will include concrete removals,al… |