← Back
BuildNYC
Two stories - detached, small or mid-size
130-60 VAN WYCK EXPRESSWAY
QUEENS · South Ozone Park · BIN 4255957
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3-2Zoning
1,026 sfGross Floor Area
1Units
2 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 13060 Van WYCK · 3,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic19p · 1 filing · 20 docs
Floor 2Demolition of existing building22p · 3 filings · 20 docs
Floor 1Demolition of existing building22p · 3 filings · 20 docs
Cellar22p · 2 filings · 20 docs
Site & exterior26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Skyline Paper Enterprise2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2022$375K—Private party → 13060 VAN WYCK LLC$366/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook701/16/2026
Mohammad Ahead, PE108/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor704/09/2026
Topline NYCScaffold204/09/2026
Zaim ContractorGeneral Contractor104/09/2026
Topline NYC ContractingScaffold104/09/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506601/16/2026
Norman C. Lok818108/23/2023
Building Lifecycle
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2026
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
03/05/2026
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
03/05/2026
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
86 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offTopline NYC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development02/11/2025
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing07/01/2024
DOB NOWMechanical SystemsPermit IssuedL&L Construction Development04/24/2024
DOB NOWFoundationPermit IssuedL&L Construction Development04/24/2024
DOB NOWFoundationPermit IssuedL&L Construction Development04/24/2024
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development04/24/2024
DOB NOWConstruction FenceSigned-offTopline NYC03/29/2024
DOB NOWGeneral ConstructionSigned-offSuffolk Construction Co09/14/2023
DOB NOWConstruction FenceSigned-offTopline NYC Contracting04/27/2023
1 project · most recent 01/16/2026
Heating Systems
FiledStatusContractorScope
01/16/2026Permit IssuedL&L Construction DevelopmentHeating Systems
1 project · most recent 12/11/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/11/2024Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
1 project · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompleteAyyub ElectricGeneral Wiring
1 project · most recent 01/16/2026
Concrete Wood
FiledStatusContractorScope
01/16/2026Permit IssuedL&L Construction DevelopmentConcrete, Wood
1 project · most recent 12/11/2024
Fence
FiledStatusContractorScope
12/11/2024Signed-offTopline NYCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 128
DateRequirementInspectorRole
03/05/2026Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
03/05/2026Fenestration areasXIAOHONG ZHAOenergy_progress
03/05/2026Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
03/05/2026Interior lighting powerXIAOHONG ZHAOenergy_progress
03/05/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
03/05/2026Air barrier — testing XIAOHONG ZHAOenergy_progress
03/05/2026MeteringXIAOHONG ZHAOenergy_progress
03/05/2026Maintenance informationXIAOHONG ZHAOenergy_progress
03/05/2026Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
03/05/2026Permanent certificateXIAOHONG ZHAOenergy_progress
03/05/2026Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
03/05/2026Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
03/05/2026HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
03/05/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
03/05/2026Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
03/05/2026Fenestration air leakageXIAOHONG ZHAOenergy_progress
03/05/2026Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
03/05/2026Footing and FoundationXIAOHONG ZHAOprogress
03/05/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
03/05/2026Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
03/05/2026FinalXIAOHONG ZHAOprogress
03/05/2026Structural Stability – Alterations of existing buildingsXIAOHONG ZHAOspecial
03/05/2026Heating SystemsXIAOHONG ZHAOspecial
03/05/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
03/05/2026Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
Latest 25 of 128.
79 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account