← Back
Elevator cooperative
Toulaine
130 WEST 67 STREET · BIN 1028847
💬 Discuss this project
1975Year Built
25Stories
D4Building Class
C4-7Zoning
186,737 sfGross Floor Area
245Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: TOULAINE OWNERS CORP · 15,263 sf lot · 12.23 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof4p · 1 filing · 6 docs
Floor 263p · 1 filing · 6 docs
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 76p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 7 docs
Basement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
130 W 67TH ST207/08/2026
130 W 67TH LLC503/22/2026
YORK RESTORATION CORP.503/22/2026
TOULANE OWNERS CORP9703/22/2026
JOULAINE OWNERS CORP.103/22/2026
HOFFMAN MANAGEMENT2303/22/2026
130 WEST 67 ST. TOULAINE103/22/2026
130 W 67 ST TOULAINE203/22/2026
GALICIA CONTRACTING RESTORATIO403/21/2026
TULAINE OWNERS1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1403/21/2026
STONE ENGINEERING & ARCHITECTURE DP203/21/2026
JME BUILDING CONSULTING, LLC103/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & M STRONGWATER LLCGeneral Contractor403/21/2026
LCS RESTORATION CORPGeneral Contractor407/08/2026
E&E GENERAL CONTRACTORSGeneral Contractor303/21/2026
NYC REMOLDERS INCGeneral Contractor303/21/2026
GEO CREATE SOLUTIONS INCGeneral Contractor203/21/2026
YORK RESTORATION CORPGeneral Contractor203/21/2026
WHITE HALL RESTORATIONElectrical103/21/2026
AMERIFLO PLUMBING AND HEAPlumbing107/08/2026
EZ RUNER CONSTRUCTION CORPPlumbing107/08/2026
FRED SMITH P&H CO INCPlumbing107/08/2026
HI-TECH PLUMBING & HEATINGPlumbing107/08/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
TESTERMAN PLBG & HTG INCPlumbing107/08/2026
COSIMO CURCIOElectrical103/21/2026
CURCIO COSIMOElectrical103/21/2026
DAIDONE, SElectrical103/21/2026
GLEICH, BERNARDElectrical103/21/2026
TODARO JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADS & Y INC3783211/30/2023
WINTON GROUP ARCHITECTURE4343411/10/2023
ROBERT F. GERMAIN JR. PE5100303/02/2022
STONE ENGINEERING & ARCHI1362112/26/2019
Building Lifecycle
All (162)Filed (22)Permit Issued (15)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (18)Objection (2)Special Inspection (22)
11/20/2025
Violation issued (ECB, open)
Zoning
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Signed off — Alteration
Interior renovation of existing apartment to combine two apartments into one unit. To include removal of non load bearing partitions, new partitions to create new bedroom.
M01191511-I1
05/22/2025
Signed off — Alteration
Interior alteration to remove gas line back to riser and cap in second kitchen location
M01191512-I1
04/23/2025
Filed — Alteration
Interior alteration to remove gas line back to riser and cap in second kitchen location
M01191512-P1
04/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/27/2025
Permit issued — Plumbing
M01191512-I1-PL
03/25/2025
Permit issued — General Construction
M01191511-I1-GC
03/16/2025
Filed — Alteration
Interior renovation of existing apartment to combine two apartments into one unit. To include removal of non load bearing partitions, new partitions to create new bedroom.
M01191511-I1
03/16/2025
Filed — Alteration
Interior alteration to remove gas line back to riser and cap in second kitchen location
M01191512-I1
03/06/2025
Special inspection requirement — Final
Anthony Tavella
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2024
Signed off — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-I1
05/09/2024
Signed off — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-S1
03/29/2024
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-P4
03/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2024
Signed off — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor on an existing residential building. Plumbing work type file in conjunction with GC. No change to use, occupancy or egress.
M00738808-I1
01/11/2024
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-P3
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/26/2023
Permit issued — Plumbing
M00894993-S1-PL
12/01/2023
Special inspection requirement — Final
SIDERIS CARAMINTZOS
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
SIDERIS CARAMINTZOS
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIDERIS CARAMINTZOS
11/30/2023
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-P1
11/30/2023
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-P2
11/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2023
Special inspection requirement — Energy Code Compliance Inspections
SIDERIS CARAMINTZOS
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
11/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIDERIS CARAMINTZOS
11/16/2023
Special inspection requirement — Final
SIDERIS CARAMINTZOS
11/10/2023
Filed — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor on an existing residential building. Plumbing work type file in conjunction with GC. No change to use, occupancy or egress.
M00738808-P2
11/08/2023
Signed off — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor of an existing residential building. General Construction work type. No change to use, occupancy or egress.
M00738750-I1
10/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
09/19/2023
Permit issued — General Construction
M00894993-I1-GC
09/14/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/07/2023
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-I1
09/07/2023
Filed — Alteration
REPLACE BATHROOM FIXTURES (LAV, WC,), REMOVE AND REPLACE EXISITNG BATHTUB WITH NEW SHOWER. RELOCATE KITCHEN FIXTURES (SINK, DISHWASHER AND STOVE. REPLACE ROUGHING TO THE COLUMN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00894993-S1
08/02/2023
Filed — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor on an existing residential building. Plumbing work type file in conjunction with GC. No change to use, occupancy or egress.
M00738808-P1
07/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2023
Permit issued — Plumbing
M00738808-I1-PL
01/26/2023
Permit issued — General Construction
M00738750-I1-GC
11/16/2022
Signed off — Alteration
PROPOSED MINOR PLUMBING WORK AT APARTMENT #26F AS PER PLANS SUBMITTED HEREWITH.
M00573028-I1
09/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2022
Signed off — Alteration
PROPOSE TO RENOVATE EXISTING APARTMENT #26F AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY, OR MEANS OF EGRESS.
M00573017-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/12/2022
Objection raised — Scope
07/12/2022
Objection resolved — Addressed
07/06/2022
Filed — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor on an existing residential building. Plumbing work type file in conjunction with GC. No change to use, occupancy or egress.
M00738808-I1
07/06/2022
Filed — Alteration
Apartment combination and interior renovations to apartments 9E and 9F on the ninth floor of an existing residential building. General Construction work type. No change to use, occupancy or egress.
M00738750-I1
06/29/2022
Cycle 9 facade report signed — SAFE
06/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2022
Signed off — Alteration
RECONNECT EXISTING WATER LINES. REPLACEMENT BOILER FILER UNDER SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M00528474-I1
05/25/2022
Filed — Alteration
PROPOSED MINOR PLUMBING WORK AT APARTMENT #26F AS PER PLANS SUBMITTED HEREWITH.
M00573028-P1
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERIFLO PLUMBING AND HEA03/27/2025
DOB NOWGeneral ConstructionSigned-offE&E GENERAL CONTRACTORS03/25/2025
DOB NOWPlumbingSigned-offHI-TECH PLUMBING & HEATIN12/26/2023
DOB NOWGeneral ConstructionSigned-offNYC REMOLDERS INC09/19/2023
DOB NOWPlumbingSigned-offEZ RUNER CONSTRUCTION COR01/30/2023
DOB NOWGeneral ConstructionSigned-offGEO CREATE SOLUTIONS INC01/26/2023
DOB NOWGeneral ConstructionSigned-offJ M STRONGWATER01/27/2022
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC12/28/2021
DOB NOWGeneral ConstructionSigned-offJ M STRONGWATER12/03/2021
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP11/06/2021
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP09/14/2021
DOB NOWBoiler EquipmentSigned-offABILENE, INC09/13/2021
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP08/17/2020
DOB NOWPlumbingPermit IssuedFRED SMITH P&H CO INC03/20/2020
DOB NOWConstruction FencePermit IssuedYORK RESTORATION CORP07/26/2018
BISPLISSUEDMCMANUS MECH MAINT P&H INC09/29/2025
BISOTISSUEDLCS RESTORATION CORP03/17/2021
BISOTISSUEDLCS RESTORATION CORP11/19/2020
BISOTISSUEDYORK RESTORATION CORP06/17/2019
BISPLISSUEDWYNNE PLBG & HEATING CORP12/20/2018
BISOTISSUEDATLAS & DESIGN CONTRACTORS12/18/2018
BISOTISSUEDYORK RESTORATION CORP06/25/2018
BISPLISSUEDIDEAL PLUMBING CORP01/29/2018
BISOTISSUEDA.G.C CONTRACTORS INC01/17/2018
BISPLISSUEDSUPERIOR PLUMBING & HEATING12/26/2017
BISOTISSUEDDR CARDINAL INC12/13/2017
BISOTISSUEDKORNEL DESIGN INC09/15/2017
BISOTISSUEDAMERICAN C CONST INC09/21/2016
BISOTISSUEDAMERICAN INDUSTRIES LLC02/23/2016
BISOTISSUEDKORNEL DESIGN INC02/02/2016
BISOTISSUEDGALICIA CONTRACTING & REST.11/13/2015
BISPLISSUEDULTIMATE PLBG AND HTG COR11/02/2015
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/07/2015
BISPLISSUEDFLYTIGER P & H LTD06/19/2015
BISMHISSUEDAMERICAN C CONST INC06/08/2015
BISOTISSUEDAMERICAN C CONST INC06/08/2015
BISPLISSUEDEVERYDAY MECHANICAL CORP01/26/2015
BISOTISSUEDAMERICAN INDUSTRIES LLC01/20/2015
BISMHISSUEDDUTCHMAN CONTRACTING INC12/19/2014
BISOTISSUEDDUTCHMAN CONTRACTING INC12/19/2014
+ 25 more permits on file
1 project · most recent 12/26/2019
Gas
FiledStatusContractorScope
12/26/2019Permit IssuedFRED SMITH P&H CO INCGas
21 projects · most recent 02/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
02/11/2025CompleteELECTRIC A/C INCGeneral Wiring
12/23/2024CompleteELECTRIC A/C INC—
07/30/2024CompleteRAL-BAR ELECTRIC INCGeneral Wiring
03/09/2024CompleteKINGS ELECTRIC CO., INC.—
11/08/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/29/2023CompleteSEABRAVE ELECTRIC CORPGeneral Wiring
08/18/2023CompleteVERTEX ELECTRIC CORP.General Wiring
09/02/2022CompleteABILENE ELECTRIC INCBoiler Controls
01/12/2022CompleteMONFORTE ELECTIRC CORPGeneral Wiring
07/09/2021CompleteABILENE ELECTRIC INC—
01/30/2021Permit IssuedJOSEPH SGROI & SONS, INC.General Wiring
11/30/2020CompleteALL CITY ELECTRICAL INCGeneral Wiring
11/06/2020CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
10/08/2020CompleteNASH ELECTRIC SERVICES IN—
04/27/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
2 projects · most recent 08/13/2020
Sidewalk Shed Fence
FiledStatusContractorScope
08/13/2020Signed-offLCS RESTORATION CORPSidewalk Shed
07/25/2018Permit IssuedYORK RESTORATION CORPFence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/14/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/20/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/06/2025FinalAnthony Tavellaprogress
12/01/2023FinalSIDERIS CARAMINTZOSprogress
12/01/2023Energy Code Compliance InspectionsSIDERIS CARAMINTZOSprogress
12/01/2023Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
11/25/2023Energy Code Compliance InspectionsSIDERIS CARAMINTZOSprogress
11/20/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
11/16/2023Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
11/16/2023FinalSIDERIS CARAMINTZOSprogress
10/31/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
07/26/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
05/16/2022Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
05/16/2022Lighting in dwelling unitsKRISTIN LUKSenergy_progress
05/16/2022FinalKRISTIN LUKSprogress
03/02/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/23/2021Insulation placement and R valuesmartin heroenergy_progress
08/10/2021Fire-Resistance Rated Constructionmartin heroprogress
08/10/2021Energy Code Compliance Inspectionsmartin heroprogress
08/09/2021Finalmartin heroprogress
05/25/2021Fire-Resistant Penetrations and JointsRobert Germain Jr.special
08/13/2020FinalMUHAMMAD MUHAYSINprogress
12/23/2019Fire-Resistant Penetrations and JointsMUHAMMAD MUHAYSINspecial
12/23/2019Energy Code Compliance InspectionsMUHAMMAD MUHAYSINprogress
▾Documents — 588 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch20
09/06/2026M00059464-I1Request digital key ↗
09/03/2026M00528523-I1Request digital key ↗
09/03/2026M00528474-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00271724-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00385210-I1Request digital key ↗
▸Applications & Permits107
▸BISWORK PERMIT APPLICATION53
09/30/2025104562769Open ↗
11/19/2020140869415Open ↗
12/21/2018123441169Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION52
09/17/2025104562769Open ↗
02/16/2022121243369Open ↗
10/20/2021140869415Open ↗
Showing 3 of 52 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
01/13/2020122095972Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications130
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
02/24/2020122095972Open ↗
02/24/2020122095972Open ↗
01/28/2020122095972Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/06/2026M00059464-I1Open ↗
09/03/2026M00528523-I1Open ↗
09/03/2026M00528474-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00573017-I1Open ↗
09/01/2026M00573017-I1Open ↗
08/30/2026M01191511-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M00528523-I1Open ↗
08/31/2026M00528474-P1Open ↗
08/25/2026M00738750-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/10/2020140963884Open ↗
10/06/2015140411490Open ↗
09/09/2015140389522Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/10/2020140963884Open ↗
10/06/2015140411490Open ↗
09/09/2015140389522Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/10/2020140963884Open ↗
10/06/2015140411490Open ↗
09/09/2015140389522Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/07/2019140869415Open ↗
▸Trade Schedules & Equipment44
▸BISSELF-CERT PLUMBING NOTICE21
08/13/2015122357715Open ↗
06/30/2015122222059Open ↗
Showing 2 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
12/13/2018123441169Open ↗
02/06/2018122610488Open ↗
09/07/2017122095972Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
12/13/2018123441169Open ↗
06/14/2017121243369Open ↗
03/28/2016122610488Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00271724-I1Open ↗
08/13/2026M00385210-I1Open ↗
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026M00528523-I1Open ↗
09/03/2026M00528474-P1Open ↗
09/03/2026M00528474-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/25/2020140869415Open ↗
12/13/2018123441169Open ↗
03/28/2016122610488Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00573028-I1Open ↗
08/13/2026M00573017-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/15/2022121243369Open ↗
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
09/04/2019123441169Open ↗
12/13/2018123441169Open ↗
07/17/2018122610488Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
04/13/2022140869415Open ↗
02/15/2022121243369Open ↗
02/07/2022121243369Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/13/2022140869415Open ↗
02/15/2022121243369Open ↗
02/07/2022121243369Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00573017-I1Open ↗
08/13/2026M00738750-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/06/2015140411490Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00528523-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY13
10/21/2025104562769Open ↗
10/21/2025104562769Open ↗
10/20/2025104562769Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/17/2018122610488Open ↗
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
10/21/2025104562769Open ↗
04/14/2022140869415Open ↗
02/15/2022121243369Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/21/2017122095972Open ↗
03/18/2016122422468Open ↗
Showing 2 of 7 on file for this type
▸BISSUPERSEDING LETTER2
09/30/2025104562769Open ↗
12/14/2017122095972Open ↗
▸BISCCD1-Construction Code Determination2
01/13/2020122095972Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT55
04/13/2022140869415Open ↗
02/15/2022121243369Open ↗
02/07/2022121243369Open ↗
Showing 3 of 55 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/21/2025104562769Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET19
12/13/2018123441169Open ↗
06/14/2017121243369Open ↗
03/28/2016122610488Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION19
11/16/2021140869415Open ↗
12/10/2020140869415Open ↗
12/13/2018123441169Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM12
02/24/2020122095972Open ↗
02/24/2020122095972Open ↗
01/28/2020122095972Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/10/2020140963884Open ↗
11/07/2019140869415Open ↗
10/06/2015140411490Open ↗
Showing 3 of 5 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/26/2018121243369Open ↗
08/31/2016122059155Open ↗
08/31/2016122059155Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type