Elevator apt, fireproof without stores
Morris I (NYCHA)
1309 PARK AVENUE · Claremont Village-Claremont (East) · BIN 2092101
💬 Discuss this project
1964Year Built
16Stories
D3Building Class
R7-1Zoning
572,187 sfGross Floor Area
546Units
LL97 Covered12 Open Violations 8 unresolved · 4 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 231,956 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Site & exteriorUnder Construction47p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA5407/08/2026
NEW YORK CITY HOUSING AUTHORITY2107/08/2026
NYC Housing Authority203/21/2026
NEW YORK CITY HOUSING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING608/13/2025
PACE ENGINEERING P.C.504/02/2025
ROBERT E. IKES, III409/17/2024
BITOPI CONSULTANTS LLC306/06/2024
AK CONSULTING SERVICES, INC205/24/2024
JOEL PHAGOO P.E. PLLC302/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1003/21/2026
H2M ARCHITECTS + ENGINEERS403/21/2026
RIGGINING CONSULTANTS103/21/2026
AYE CONSULTING GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor3907/08/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor507/08/2026
NAVILLUS TILE INCGeneral Contractor307/08/2026
ZORIA HOUSING, LLCGeneral Contractor307/08/2026
LIT MODE ELECL CONTG INCElectrical103/22/2026
BONARDI, MICHAELElectrical103/21/2026
MURRELL, LElectrical103/21/2026
MICHAEL BONARDIElectrical103/21/2026
CHARNJIT SINGHElectrical103/21/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
LADIKOS, DIMITRIOSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898308/13/2025
ALAN MARGOLIN & ASSOC423504/02/2025
MP ENGINEERS & ARCHITECTS1438409/17/2024
BITOPI CONSULTANTS LLC7036106/06/2024
Building Lifecycle
All (132)Filed (24)Permit Issued (35)Signed Off (12)Facade (FISP) (15)Violation (14)Objection (2)Special Inspection (30)
08/28/2026
Objection resolved — Resolved
08/07/2026
Cycle 10 facade report signed — SAFE
06/25/2026
Cycle 10 facade inspection completed
06/25/2026
Violation issued (ECB, open)
Construction
05/12/2026
Cycle 10 facade report submitted
01/13/2026
Permit issued — Construction Fence
X01179048-I1-FN
01/13/2026
Permit issued — Supported Scaffold
X01179059-I1-SF
01/13/2026
Permit issued — General Construction
X01127438-I1-GC
01/08/2026
Signed off — Alteration
X08004091-S1
12/11/2025
Signed off — Alteration
X08004091-I1
12/03/2025
Permit issued — Sidewalk Shed
X01145026-I1-SH
08/13/2025
Filed — Alteration
X01262942-I1
08/13/2025
Permit issued — Suspended Scaffold
X01262942-I1-SC
08/05/2025
Signed off — Alteration
X01056975-I1
07/29/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
07/29/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
06/19/2025
Signed off — Alteration
X01051113-I1
06/19/2025
Signed off — Alteration
X01086917-I1
06/06/2025
Cycle 10 facade report submitted
06/04/2025
Violation issued (ECB, closed)
Construction
05/22/2025
Cycle 10 facade inspection completed
05/19/2025
Cycle 10 facade report signed — UNSAFE
04/22/2025
Permit issued — General Construction
X01127438-I1-GC
04/18/2025
Permit issued — Construction Fence
X01179048-I1-FN
04/17/2025
Filed — Alteration
Material Hoist Installation for facade repairs.
X01179072-I1
04/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01179048-I1
04/17/2025
Permit issued — Suspended Scaffold
X01179072-I1-SC
04/17/2025
Objection raised — Other
04/10/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
04/10/2025
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
04/02/2025
Filed — Alteration
Local Law 11/98 related Facade repairs project and bulkhead repair. No change in use, egress or occupancy.
X01127438-P5
04/01/2025
Permit issued — Supported Scaffold
X01179059-I1-SF
04/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
04/01/2025
Special inspection requirement — Masonry
Young Suh
04/01/2025
Special inspection requirement — Post-installed Anchors
Young Suh
04/01/2025
Special inspection requirement — Final
Young Suh
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/31/2025
Filed — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 1373 WASHINGTON AVENUE, BRONX, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01179059-I1
03/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/18/2025
Special inspection requirement — Post-installed Anchors
Young Suh
03/18/2025
Special inspection requirement — Final
Young Suh
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/18/2025
Special inspection requirement — Masonry
Young Suh
03/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
03/10/2025
Filed — Alteration
Local Law 11/98 related Facade repairs project and bulkhead repair. No change in use, egress or occupancy.
X01127438-P4
03/10/2025
Special inspection requirement — Masonry
Young Suh
03/10/2025
Special inspection requirement — Final
Young Suh
03/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
03/10/2025
Special inspection requirement — Post-installed Anchors
Young Suh
02/13/2025
Filed — Alteration
Local Law 11/98 related Facade repairs project and bulkhead repair. No change in use, egress or occupancy.
X01127438-P3
01/30/2025
Filed — Alteration
Local Law 11/98 related Facade repairs project and bulkhead repair. No change in use, egress or occupancy.
X01127438-P2
01/27/2025
Signed off — Alteration
X01051147-I1
01/23/2025
Permit issued — Supported Scaffold
X01056975-I1-SF
01/23/2025
Permit issued — Sidewalk Shed
X01145026-I1-SH
01/23/2025
Permit issued — Structural
X08004091-S1-ST
01/23/2025
Permit issued — General Construction
X08004091-I1-GC
01/23/2025
Permit issued — Construction Fence
X01051113-I1-FN
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC01/13/2026
DOB NOWSupported ScaffoldPermit IssuedROMA SCAFFOLDING INC01/13/2026
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC01/13/2026
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC12/03/2025
DOB NOWSuspended ScaffoldPermit IssuedEAST COAST BUILDERS GROUP08/13/2025
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC04/22/2025
DOB NOWConstruction FencePermit IssuedROMA SCAFFOLDING INC04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC04/17/2025
DOB NOWSupported ScaffoldPermit IssuedROMA SCAFFOLDING INC04/01/2025
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/23/2025
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC01/23/2025
DOB NOWStructuralSigned-offROMA SCAFFOLDING INC01/23/2025
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC01/23/2025
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/23/2025
DOB NOWSidewalk ShedPermit IssuedROMA SCAFFOLDING INC11/22/2024
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC10/04/2024
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC08/23/2024
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC08/01/2024
DOB NOWStructuralSigned-offROMA SCAFFOLDING INC08/01/2024
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC06/07/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/28/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC05/28/2024
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI04/16/2024
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC02/23/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/16/2024
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI01/24/2024
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC02/21/2023
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI01/23/2023
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC10/12/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC08/19/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2022
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC11/18/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/03/2021
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC09/04/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC06/08/2020
BISOTISSUEDNAVILLUS TILE INC04/01/2025
BISOTISSUEDNAVILLUS TILE INC05/14/2024
BISPLISSUEDVARSITY PLBG AND HTG INC03/07/2024
BISMHISSUEDINFINITY CONTRACTING SERV11/08/2023
BISOTISSUEDNAVILLUS TILE INC05/11/2023
+ 20 more permits on file
11 projects · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025Permit IssuedLIT MODE ELECL CONTG INC—
09/11/2024CancelledLIT MODE ELECL CONTG INC—
09/11/2024CancelledLIT MODE ELECL CONTG INC—
09/11/2024Permit IssuedLIT MODE ELECL CONTG INC—
09/11/2024CancelledLIT MODE ELECL CONTG INC—
08/22/2024Permit IssuedHYLAN DATACOM & ELECL LLC—
07/09/2024Permit IssuedHYLAN DATACOM & ELECL LLC—
10/18/2022CompleteQ.Y. ELECTRIC, INC—
01/30/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
03/19/2020CompleteKANTA ELECTRIC CORP.General Wiring
05/14/2019CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
2 projects · most recent 04/17/2025
Fence Scaffold
FiledStatusContractorScope
04/17/2025Permit IssuedROMA SCAFFOLDING INCFence
03/31/2025Permit IssuedROMA SCAFFOLDING INCScaffold
1 project · most recent 04/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/17/2025Permit IssuedD&N CONST & CONSULTNG INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/29/2025Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
07/29/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/10/2025Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
04/10/2025Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/01/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
04/01/2025MasonryYoung Suhspecial
04/01/2025Post-installed AnchorsYoung Suhspecial
04/01/2025FinalYoung Suhprogress
04/01/2025Energy Code Compliance InspectionsYoung Suhprogress
04/01/2025Tenant Protection Plan ComplianceYoung Suhspecial
03/18/2025Energy Code Compliance InspectionsYoung Suhprogress
03/18/2025Post-installed AnchorsYoung Suhspecial
03/18/2025FinalYoung Suhprogress
03/18/2025Tenant Protection Plan ComplianceYoung Suhspecial
03/18/2025MasonryYoung Suhspecial
03/18/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/10/2025MasonryYoung Suhspecial
03/10/2025FinalYoung Suhprogress
03/10/2025Energy Code Compliance InspectionsYoung Suhprogress
03/10/2025Tenant Protection Plan ComplianceYoung Suhspecial
03/10/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
03/10/2025Post-installed AnchorsYoung Suhspecial
01/15/2025FinalYoung Suhprogress
01/15/2025MasonryYoung Suhspecial
01/15/2025Post-installed AnchorsYoung Suhspecial
Latest 25 of 46.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch22
08/24/2026X00795413-I1Request digital key ↗
08/23/2026X08044404-I1Request digital key ↗
08/23/2026X00830599-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00353088-I1Request digital key ↗
08/26/2026X00381688-I1Request digital key ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
03/23/2021240228892Open ↗
03/03/2021240228892Open ↗
12/16/2020240231450Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
08/09/2023240228892Open ↗
03/14/2022240228892Open ↗
06/22/2020240231450Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/26/2026X00353088-I1Open ↗
08/23/2026X08044404-I1Open ↗
08/20/2026X08004091-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026X08004091-P1Open ↗
09/01/2026X01127438-I1Open ↗
09/01/2026X01127438-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026X08004091-P1Open ↗
09/01/2026X08004091-P1Open ↗
09/01/2026X08004091-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
06/15/2020240231450Open ↗
06/15/2020240231450Open ↗
05/27/2020240231450Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/23/2018240231450Open ↗
06/24/2016240145106Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/23/2018240231450Open ↗
06/24/2016240145106Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/23/2018240231450Open ↗
06/24/2016240145106Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/26/2018240228892Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/08/2009220026424Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/08/2009220026424Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
08/09/2023240228892Open ↗
03/14/2022240228892Open ↗
09/06/2018240228892Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
05/05/2011220026424Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
09/06/2018240228892Open ↗
08/23/2018240231450Open ↗
06/24/2016240145106Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026X00353088-I1Open ↗
08/13/2026X00381688-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
03/02/2021240228892Open ↗
12/16/2020240231450Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/20/2026X08004091-S1Open ↗
08/20/2026X08004091-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/08/2009220026424Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/23/2018240231450Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
10/06/2020240231450Open ↗
07/19/2020240231450Open ↗
04/30/2020240228892Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/27/2020240231450Open ↗
05/27/2020240231450Open ↗
05/04/2020240231450Open ↗
▸BISNYCECC ANALYSIS1
08/23/2018240231450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/23/2018240231450Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/24/2016240145106Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/06/2020240231450Open ↗
07/19/2020240231450Open ↗
04/30/2020240228892Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
06/18/2020240228892Open ↗
05/27/2020240231450Open ↗
05/27/2020240231450Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/24/2016240145106Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/03/2021240228892Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/20/2026X08004091-S1Open ↗
08/20/2026X08004091-P2Open ↗
08/20/2026X08004091-I1Open ↗
Showing 3 of 24 on file for this type
▸BISSHED LETTER5
09/15/2021240145106Open ↗
07/20/2020240145106Open ↗
07/25/2019240145106Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/20/2026X08004091-S1Open ↗
08/20/2026X08004091-I1Open ↗
08/20/2026X08004091-P2Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/04/2020240231450Open ↗
07/25/2019240145106Open ↗
06/27/2018240145106Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/20/2026X08004091-I1Open ↗
08/20/2026X08004091-S1Open ↗
08/20/2026X01127438-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/20/2026X08004091-I1Open ↗
08/13/2026X00353088-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/08/2009220026424Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/05/2011220026424Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
09/06/2018240228892Open ↗
08/23/2018240231450Open ↗
07/26/2018240228892Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/01/2025240228892Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION4
08/09/2023240228892Open ↗
04/11/2022240228892Open ↗
12/16/2020240231450Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/23/2018240231450Open ↗
07/26/2018240228892Open ↗
06/24/2016240145106Open ↗
▸BISBOROUGH INTAKE FORM3
06/15/2020240231450Open ↗
05/27/2020240231450Open ↗
05/04/2020240231450Open ↗
▸BISEFILING COVER SHEET1
09/08/2009220026424Open ↗
▸Other Documents7
▸DOB NOWCalculations3
08/13/2026X01179072-I1Open ↗
08/13/2026X01262942-I1Open ↗
08/13/2026X01086917-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026X01179072-I1Open ↗
08/13/2026X01086917-I1Open ↗
08/13/2026X01262942-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026X00983833-I1Open ↗