← Back
Office only, 2-6 stories
131-22 AVERY AVENUE
QUEENS · BIN 4599108
💬 Discuss this project
2020Year Built
6Stories
O2Building Class
C2-6AZoning
43,504 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: WILSON REALTY MANAGEMENT LLC · 8,645 sf lot · 5.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof3p · 2 filings · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 64p · 2 filings · 20 docs
Floor 51p · 1 filing · 17 docs
Floor 43p · 2 filings · 20 docs
Floor 32p · 1 filing · 17 docs
Floor 22p · 1 filing · 17 docs
Floor 15p · 2 filings · 20 docs
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILSON REALTY MANAGEMENT LLC6207/08/2026
KINGS GROUP NY2107/08/2026
FRONT WAVE CONSTRUCTION2003/22/2026
W L GROUP CONSTRUCTION303/22/2026
BRENMAC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
MEIYUN CHEN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1007/08/2026
W & L GROUP CONSTRUCTIONGeneral Contractor603/21/2026
MPS PLUMBING & HEATING INCFire Protection307/08/2026
MPS PLUMBING & HEATING INCPlumbing207/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
JIA WEI CONSTRUCTION INCGeneral Contractor207/08/2026
FRONT WAVE CONSTRUCTION*General Contractor107/08/2026
KJK ELECTRIC INCElectrical103/22/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TIMES BUILDINGS ENGINEERI710307/20/2023
CMSC, INC6098106/03/2020
Building Lifecycle
All (132)Filed (14)Permit Issued (19)Signed Off (9)Violation (28)Inspection (12)Objection (24)Special Inspection (26)
10/08/2025
Signed off — Alteration
Proposed new 18' curb cut.
Q08036850-I1
10/08/2025
Signed off — Alteration
Proposed new 30' curb cut.
Q08043609-I1
10/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/06/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/29/2025
Signed off — Alteration
HEREWITH FILLING FOR NEW INSTALLATION OF SPRINKLER, STANDPIPE AND PLUMBING SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00315170-I1
08/15/2025
Signed off — Alteration
PROPOSE TO INSTALL NEW HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS FOR 6 STORY MIXED USE BUILDING IN CONJUNCTION WITH DOB NB BIS JOB NO: 421152246.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00315418-I1
03/24/2025
Permit issued — Curb Cut
Q08036850-I1-CC
03/24/2025
Permit issued — Curb Cut
Q08043609-I1-CC
03/19/2025
Permit issued — Mechanical Systems
Q00315418-I1-MS
12/14/2023
Signed off — Alteration
Q00276721-I1
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARD GRINFELD
12/04/2023
Special inspection requirement — Heating Systems
EDUARD GRINFELD
12/04/2023
Special inspection requirement — Mechanical Systems
EDUARD GRINFELD
12/04/2023
Special inspection requirement — Final
BENJAMIN SASSON
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
EDUARD GRINFELD
12/04/2023
Special inspection requirement — Electrical motors and elevators
EDUARD GRINFELD
12/04/2023
Special inspection requirement — Maintenance information
EDUARD GRINFELD
12/04/2023
Special inspection requirement — HVAC insulation and sealing
EDUARD GRINFELD
12/04/2023
Special inspection requirement — HVAC and service water heating system controls
EDUARD GRINFELD
12/04/2023
Special inspection requirement — HVAC and service water heating equipment
EDUARD GRINFELD
11/27/2023
Objection resolved — Addressed
11/21/2023
Objection raised — Scope
11/09/2023
Filed — Alteration
PROPOSE TO INSTALL NEW HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS FOR 6 STORY MIXED USE BUILDING IN CONJUNCTION WITH DOB NB BIS JOB NO: 421152246.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00315418-P1
09/29/2023
Violation issued (FDNY_NOV, closed)
09/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2023
Violation issued (FDNY_NOV, closed)
09/11/2023
Permit issued — Standpipe
Q00315170-I1-PL
09/11/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
08/08/2023
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/08/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/03/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/24/2023
Special inspection requirement — Maintenance information
RUCI LIN
07/24/2023
Special inspection requirement — Sprinkler Systems
RUCI LIN
07/24/2023
Special inspection requirement — Standpipe Systems
RUCI LIN
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUCI LIN
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
RUCI LIN
07/24/2023
Special inspection requirement — HVAC and service water heating equipment
RUCI LIN
07/24/2023
Special inspection requirement — HVAC insulation and sealing
RUCI LIN
07/24/2023
Special inspection requirement — HVAC and service water heating system controls
RUCI LIN
07/20/2023
Filed — Alteration
HEREWITH FILLING FOR NEW INSTALLATION OF SPRINKLER, STANDPIPE AND PLUMBING SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00315170-P1
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUCI LIN
06/29/2023
Special inspection requirement — Sprinkler Systems
RUCI LIN
06/29/2023
Special inspection requirement — Standpipe Systems
RUCI LIN
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
RUCI LIN
06/29/2023
Special inspection requirement — Maintenance information
RUCI LIN
06/29/2023
Special inspection requirement — HVAC insulation and sealing
RUCI LIN
06/29/2023
Special inspection requirement — HVAC and service water heating equipment
RUCI LIN
06/29/2023
Special inspection requirement — HVAC and service water heating system controls
RUCI LIN
01/20/2023
Filed — Alteration
Proposed new 18' curb cut.
Q08036850-I1
01/20/2023
Filed — Alteration
Proposed new 30' curb cut.
Q08043609-I1
01/12/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/21/2022
Signed off — Alteration
installation of plywook fence for vacate lots.
Q00033823-I1
10/13/2022
Signed off — Alteration
Q00277478-I1
10/06/2022
Signed off — Alteration
Q00377372-I1
10/05/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/29/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Q00590139-I1
09/29/2022
Permit issued — Supported Scaffold
Q00590139-I1-SF
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJIA WEI CONSTRUCTION INC03/24/2025
DOB NOWCurb CutSigned-offJIA WEI CONSTRUCTION INC03/24/2025
DOB NOWMechanical SystemsSigned-offFRONT WAVE CONSTRUCTION*03/19/2025
DOB NOWStandpipeSigned-offMPS PLUMBING & HEATING IN09/11/2023
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/29/2022
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC09/26/2022
DOB NOWStandpipeSigned-offMPS PLUMBING & HEATING INC08/30/2022
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN08/30/2022
DOB NOWStandpipeSigned-offMPS PLUMBING & HEATING INC01/06/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/09/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/10/2021
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.12/16/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/11/2020
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/10/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/19/2019
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.12/12/2019
DOB NOWConstruction FenceSigned-offW & L GROUP CONSTRUCTION06/24/2019
DOB NOWConstruction FenceSigned-offW & L GROUP CONSTRUCTION06/25/2018
DOB NOWConstruction FenceSigned-offW & L GROUP CONSTRUCTION04/20/2018
BIS—ISSUEDFRONT WAVE CONSTRUCTION*05/25/2023
BIS—ISSUEDFRONT WAVE CONSTRUCTION*09/07/2022
BISPLISSUEDMPS PLUMBING & HEATING INC08/09/2022
BISEQISSUEDFRONT WAVE CONSTRUCTION*05/27/2022
BIS—ISSUEDFRONT WAVE CONSTRUCTION*05/27/2022
BIS—ISSUEDFRONT WAVE CONSTRUCTION*09/27/2021
BISEQISSUEDCOLGATE ENTERPRISE CORP07/08/2021
BIS—RE-ISSUEDFRONT WAVE CONSTRUCTION*04/20/2021
BISPLISSUEDMPS PLUMBING & HEATING INC01/15/2021
BIS—ISSUEDFRONT WAVE CONSTRUCTION*12/23/2020
BISOTISSUEDFRONT WAVE CONSTRUCTION*09/01/2020
BISOTISSUEDFRONT WAVE CONSTRUCTION*08/26/2020
BIS—ISSUEDFRONT WAVE CONSTRUCTION*08/04/2020
BISEQISSUEDCOLGATE ENTERPRISE CORP07/21/2020
BIS—ISSUEDFRONT WAVE CONSTRUCTION*07/01/2020
BISEQISSUEDFRONT WAVE CONSTRUCTION*06/29/2020
BIS—ISSUEDFRONT WAVE CONSTRUCTION*06/22/2020
BIS—ISSUEDW & L GROUP CONSTRUCTION12/24/2019
BISOTISSUEDW & L GROUP CONSTRUCTION06/21/2019
BISOTISSUEDW & L GROUP CONSTRUCTION04/30/2019
BISOTISSUEDW & L GROUP CONSTRUCTION06/22/2018
+ 7 more permits on file
7 projects · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026CompleteJ Y ELECTRIC INC—
12/10/2021CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
08/21/2020CompleteKJK ELECTRIC INC—
07/09/2020CompleteRICHARD NEU—
06/22/2020CompleteNASH ELECTRIC SERVICES IN—
02/04/2020CompleteAL-LECTRIC ELECT'L CONTRG—
12/18/2019CompleteWCK ELECTRIC CORP.—
1 project · most recent 10/09/2020
Sidewalk Shed
FiledStatusContractorScope
10/09/2020——Sidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/06/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
08/08/2023Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/08/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/03/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/03/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/05/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/04/2023Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
12/04/2023Heating SystemsEDUARD GRINFELDspecial
12/04/2023Mechanical SystemsEDUARD GRINFELDspecial
12/04/2023FinalBENJAMIN SASSONprogress
12/04/2023Energy Code Compliance InspectionsEDUARD GRINFELDprogress
12/04/2023Electrical motors and elevatorsEDUARD GRINFELDenergy_progress
12/04/2023Maintenance informationEDUARD GRINFELDenergy_progress
12/04/2023HVAC insulation and sealing EDUARD GRINFELDenergy_progress
12/04/2023HVAC and service water heating system controls EDUARD GRINFELDenergy_progress
12/04/2023HVAC and service water heating equipment EDUARD GRINFELDenergy_progress
07/24/2023Maintenance informationRUCI LINenergy_progress
07/24/2023Sprinkler SystemsRUCI LINspecial
07/24/2023Standpipe SystemsRUCI LINspecial
07/24/2023Fire-Resistant Penetrations and JointsRUCI LINspecial
07/24/2023Energy Code Compliance InspectionsRUCI LINprogress
07/24/2023HVAC and service water heating equipment RUCI LINenergy_progress
07/24/2023HVAC insulation and sealing RUCI LINenergy_progress
07/24/2023HVAC and service water heating system controls RUCI LINenergy_progress
06/29/2023Fire-Resistant Penetrations and JointsRUCI LINspecial
06/29/2023Sprinkler SystemsRUCI LINspecial
06/29/2023Standpipe SystemsRUCI LINspecial
06/29/2023Energy Code Compliance InspectionsRUCI LINprogress
06/29/2023Maintenance informationRUCI LINenergy_progress
06/29/2023HVAC insulation and sealing RUCI LINenergy_progress
06/29/2023HVAC and service water heating equipment RUCI LINenergy_progress
Latest 25 of 26.
▾Documents — 316 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch6
08/29/2026Q00033823-I1Request digital key ↗
08/27/2026Q00590139-I1Request digital key ↗
08/27/2026Q00590139-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
08/28/2026Q00276721-I1Request digital key ↗
08/28/2026Q00315170-P1Request digital key ↗
08/15/2026Q00315170-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00315170-P1Request digital key ↗
08/15/2026Q00315170-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00315170-P1Request digital key ↗
08/15/2026Q00315170-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026Q00315418-P1Request digital key ↗
08/15/2026Q00315418-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00277478-I1Request digital key ↗
08/27/2026Q00410756-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00377372-I1Request digital key ↗
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION24
08/03/2021421152246Open ↗
07/06/2021421152246Open ↗
02/03/2021421152246Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION23
11/18/2024421152246Open ↗
05/21/2024421152246Open ↗
02/16/2024421152246Open ↗
Showing 3 of 23 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
02/12/2020421572426Open ↗
02/12/2020421572426Open ↗
01/02/2020421152246Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/29/2026Q00033823-I1Open ↗
08/28/2026Q00276721-I1Open ↗
08/28/2026Q00277478-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026Q00315170-I1Open ↗
08/27/2026Q00315170-I1Open ↗
08/26/2026Q00315418-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/16/2020440605025Open ↗
02/14/2017421407089Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/13/2023421813167Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026Q00315170-I1Open ↗
08/26/2026Q00315418-I1Open ↗
08/24/2026Q00315170-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/16/2020440605025Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/16/2020440605025Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/11/2018421407089Open ↗
10/31/2017421407089Open ↗
02/14/2017421407089Open ↗
Showing 3 of 4 on file for this type
▸BISHEATING SYSTEMS1
12/08/2025421152246Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/08/2025421152246Open ↗
▸BISSPRINKLER SYSTEMS1
09/07/2023421152246Open ↗
▸Safety & Tenant Protection8
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
03/13/2023421813167Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
03/19/2024421152246Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos21
▸DOB NOWOER: Notice to Proceed7
08/29/2026Q00033823-I1Open ↗
08/13/2026Q00410756-I1Open ↗
08/13/2026Q00315170-P1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
03/27/2023421813167Open ↗
07/16/2020440605025Open ↗
Showing 2 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
12/16/2025421572426Open ↗
09/25/2025421152246Open ↗
09/12/2023440605025Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/14/2017421407089Open ↗
Showing 1 of 3 on file for this type
▸BISRODENT CONTROL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00315170-I1Open ↗
08/13/2026Q00377372-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/30/2019421152246Open ↗
12/30/2019421152246Open ↗
12/07/2017421572426Open ↗
Showing 3 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/08/2025421152246Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/08/2025421152246Open ↗
▸BISFENESTRATION AREAS1
12/08/2025421152246Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/08/2025421152246Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/08/2025421152246Open ↗
▸BISLIGHTING CONTROLS1
12/08/2025421152246Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00315418-I1Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
12/30/2019421152246Open ↗
07/30/2019421152246Open ↗
04/25/2018421572426Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/21/2020440605025Open ↗
07/16/2020440605025Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/30/2019421152246Open ↗
04/25/2018421572426Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
12/16/2025421572426Open ↗
09/12/2023440605025Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISMASONRY2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
12/16/2025421572426Open ↗
12/08/2025421152246Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/18/2024421152246Open ↗
11/18/2024421152246Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/16/2025421572426Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/16/2025421572426Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/03/2021421152246Open ↗
11/12/2020421572426Open ↗
07/06/2020421152246Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/13/2026421572426Open ↗
09/13/2023440605025Open ↗
04/11/2018421407089Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER5
08/03/2021421152246Open ↗
07/06/2021421152246Open ↗
09/10/2020421152246Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
02/16/2024421152246Open ↗
01/18/2018421152246Open ↗
01/17/2018421152246Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
12/16/2025421572426Open ↗
09/12/2023440605025Open ↗
▸Cost, Insurance & Ownership14
▸BISPROJECT-SPECIFIC GL INSURANCE8
11/12/2020421572426Open ↗
09/10/2020421152246Open ↗
09/10/2020421152246Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT3
04/11/2018421407089Open ↗
12/07/2017421572426Open ↗
02/14/2017421407089Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/18/2025421572426Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION16
03/27/2023421813167Open ↗
06/30/2021440605025Open ↗
08/27/2020421152246Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM15
11/29/2022421813167Open ↗
11/29/2022421813167Open ↗
08/03/2021421152246Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET5
12/07/2017421572426Open ↗
02/14/2017421407089Open ↗
Showing 2 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/16/2020440605025Open ↗
Showing 1 of 2 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/13/2023421813167Open ↗
12/30/2019421152246Open ↗
▸BISUNDERPINNING (2014)2
12/16/2025421572426Open ↗
03/19/2024421152246Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/27/2023421813167Open ↗