BuildNYC
Elevator cooperative
Seward Park Cooperative
131 BROOME STREET · Lower East Side · BIN 1077598
💬 Discuss this project
1972Year Built
26Stories
D4Building Class
R8Zoning
178,320 sfGross Floor Area
200Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Elevator cooperative · Owner of record: Grand St Guild East HDFC · 32,028 sf lot · 5.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSuspended scaffold facade restoration and inspection4p · 1 filing · 3 docs
Floor 1Mechanical system upgrade10p · 3 filings · 20 docs
MezzanineCommunity room renovation10p · 2 filings · 17 docs
Site & exteriorConstruction fence10p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Grand Street Guild East HDFC2304/09/2026
Southwest Grand St Guild HDFC1903/21/2026
Berkowners707/08/2026
Haven Plaza Funding Co HDFC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRW Engineers308/14/2025
Wellworth Consulting108/11/2025
AG Engineering101/20/2024
Cta Architects109/08/2023
Dooling & Company Architects111/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers203/21/2026
Municipal Building Consultants103/21/2026
United Safety Consultants103/21/2026
Sol Building Consulting Services303/21/2026
Arsenal Building Consultants203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold907/08/2026
Maspeth ContractingGeneral Contractor203/21/2026
Ragem ConstructionGeneral Contractor203/21/2026
Technical Comfort of NY*General Contractor207/08/2026
New York Plumbing-Heating-CoolingPlumbing203/22/2026
High Quality Electric ofElectrical103/21/2026
Kings Group NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRW Engineering & Architects1162308/14/2025
Catalpa Special Inspectio2004109/08/2023
Building Lifecycle
All (142)Filed (8)Permit Issued (11)Signed Off (6)Facade (FISP) (15)Violation (60)Objection (20)Special Inspection (22)
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Orah Weisberg
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Orah Weisberg
04/23/2026
Special inspection requirement — Maintenance information
Orah Weisberg
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Orah Weisberg
04/23/2026
Special inspection requirement — Final
Orah Weisberg
04/23/2026
Special inspection requirement — Mechanical Systems
Orah Weisberg
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/31/2026
Signed off — Alteration
M01267984-I1
03/25/2026
Objection resolved — Addressed
10/28/2025
Violation issued (HPD, closed)
C
10/28/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
C
10/21/2025
Violation issued (HPD, closed)
A
10/21/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
B
08/30/2025
Objection raised — Admin
08/14/2025
Filed — Alteration
installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As per plans filed herewith, no change in use, egress or occupancy.
M00900453-P1
08/11/2025
Filed — Alteration
M01267984-I1
08/11/2025
Permit issued — Construction Fence
M01267984-I1-FN
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Violation issued (HPD, closed)
B
07/11/2025
Special inspection requirement — Final
Orah Weisberg
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Orah Weisberg
07/11/2025
Special inspection requirement — Mechanical Systems
Orah Weisberg
07/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Orah Weisberg
07/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Orah Weisberg
07/11/2025
Special inspection requirement — Maintenance information
Orah Weisberg
06/10/2025
Violation issued (HPD, closed)
B
06/10/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
C
05/07/2025
Violation issued (HPD, closed)
C
04/18/2025
Cycle 9 facade report submitted
04/02/2025
Cycle 9 facade inspection completed
02/20/2025
Violation issued (ECB, closed)
Elevators
01/30/2025
Cycle 9 facade report signed — SAFE
01/15/2025
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00997196-I1
12/31/2024
Signed off — Alteration
M00992011-I1
12/02/2024
Signed off — Alteration
M00923896-I1
11/01/2024
Violation issued (HPD, closed)
C
05/22/2024
Violation issued (HPD, closed)
B
05/17/2024
Cycle 9 facade report signed — SWARMP
05/13/2024
Cycle 9 facade inspection completed
05/06/2024
Violation issued (ECB, closed)
Construction
05/06/2024
Violation issued (ECB, closed)
Construction
05/06/2024
Violation issued (ECB, closed)
Construction
04/30/2024
Violation issued (ECB, closed)
Construction
04/24/2024
Permit issued — General Construction
M00992969-I1-GC
04/09/2024
Permit issued — Mechanical Systems
M00900453-I1-MS
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSpring Scaffolding08/11/2025
DOB NOWGeneral ConstructionSigned-offMaspeth Contracting04/24/2024
DOB NOWMechanical SystemsPermit IssuedTechnical Comfort of NY*04/09/2024
DOB NOWSuspended ScaffoldSigned-offMaspeth Contracting03/15/2024
DOB NOWSidewalk ShedSigned-offKings Group NY01/22/2024
DOB NOWGeneral ConstructionSigned-offRagem Construction12/13/2023
DOB NOWMechanical SystemsSigned-offTechnical Comfort of NY*06/12/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/28/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/23/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding10/17/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/01/2018
BISOTISSUEDEdras Group02/14/2020
BISOTISSUEDTindel Replacement Window01/28/2019
BISOTISSUEDTotal Structural Concepts11/16/2017
BISMHISSUEDSage Builders03/31/2017
BISOTISSUEDMDG Design & Construction01/11/2013
BISOTISSUEDMDG Design & Construction01/08/2013
BISPLISSUEDOrion Plumbing & Heating07/16/2012
BISPLISSUEDOrion Plumbing & Heating07/16/2012
BISOTISSUEDMDG Design & Construction05/10/2012
BISMHISSUEDMaximum Mechanical04/04/2012
BISOTISSUEDMDG Design & Construction02/01/2012
BISOTISSUEDMDG Design & Construction01/18/2012
BISMHISSUEDMDG Design & Construction01/18/2012
BISOTISSUEDMDG Design & Construction01/18/2012
BISMHISSUEDMDG Design & Construction11/18/2011
BISPLISSUEDOJ Plumbing & Heating10/13/2011
BISEQISSUEDSpring Scaffolding09/02/2011
BISPLISSUEDOJ Plumbing & Heating08/09/2011
BISMHISSUEDMaximum Mechanical07/26/2011
BISOTISSUEDMDG Design & Construction02/15/2011
BISOTISSUEDMDG Design & Construction02/02/2011
BISOTISSUEDMDG Design & Construction01/20/2011
BISMHISSUEDMDG Design & Construction01/20/2011
BISOTISSUEDMDG Design & Construction11/24/2010
BISPLISSUEDPlumbing & Heating Doctor08/24/2010
BISPLISSUEDAmok06/07/2010
BISMHISSUEDMDG Design & Construction05/17/2010
BISOTISSUEDMDG Design & Construction05/17/2010
BISOTISSUEDMDG Design & Construction05/17/2010
+ 7 more permits on file
1 project · most recent 08/14/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2025Permit IssuedTechnical Comfort of NY*Heating and Air Conditioning Systems
Heat / Cool
Daikin FXAQ07PVJU 16,000 BTU · Vrf Indoor ×2
FXAQ18PVJU 38,000 BTU · Vrf Indoor ×2
FXAQ24PVJU 50,500 BTU · Vrf Indoor ×2
RXTQ48TBVJUA 4 tons · Vrf Outdoor ×2
3 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteHigh Quality Electric of—
06/26/2020Permit IssuedSerenity ElectricGeneral Wiring
11/14/2018CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/23/2026Fire-Resistant Penetrations and JointsOrah Weisbergspecial
04/23/2026HVAC-R and service water heating system controlsOrah Weisbergenergy_progress
04/23/2026Maintenance informationOrah Weisbergenergy_progress
04/23/2026HVAC-R and service water piping design and insulationOrah Weisbergenergy_progress
04/23/2026FinalOrah Weisbergprogress
04/23/2026Mechanical SystemsOrah Weisbergspecial
04/23/2026Tenant Protection Plan Compliance—special
07/11/2025FinalOrah Weisbergprogress
07/11/2025Fire-Resistant Penetrations and JointsOrah Weisbergspecial
07/11/2025Mechanical SystemsOrah Weisbergspecial
07/11/2025Tenant Protection Plan Compliance—special
07/11/2025HVAC-R and service water heating system controlsOrah Weisbergenergy_progress
07/11/2025HVAC-R and service water piping design and insulationOrah Weisbergenergy_progress
07/11/2025Maintenance informationOrah Weisbergenergy_progress
04/22/2020Shutoff dampersOrah Weisbergenergy_progress
03/03/2020Fire-Resistant Penetrations and JointsOrah Weisbergspecial
02/25/2020HVAC insulation and sealing Orah Weisbergenergy_progress
02/25/2020HVAC and service water heating equipment Orah Weisbergenergy_progress
02/25/2020HVAC and service water heating system controls Orah Weisbergenergy_progress
02/25/2020Maintenance informationOrah Weisbergenergy_progress
12/23/2019FinalOrah Weisbergprogress
12/23/2019Mechanical SystemsOrah Weisbergspecial
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/06/2026M00099986-I1Request digital key ↗
08/29/2026M00900453-P1Request digital key ↗
08/29/2026M00900453-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00286468-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION36
03/18/2020123886580Open ↗
03/18/2020123886580Open ↗
02/12/2020123886580Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION29
02/19/2020123818501Open ↗
01/28/2019123375034Open ↗
11/16/2017122878127Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
10/15/2019123375034Open ↗
09/12/2019123818501Open ↗
09/12/2019123818501Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00099986-I1Open ↗
08/29/2026M00900453-I1Open ↗
08/29/2026M00900453-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
08/31/2026M00286468-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/12/2020123886580Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/12/2020123886580Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE18
04/11/2013120058294Open ↗
02/14/2013120058294Open ↗
11/26/2012120058294Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING7
01/28/2013120058294Open ↗
12/13/2012120058294Open ↗
10/12/2012120058294Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/22/2018122877510Open ↗
▸BISEQUIPMENT USE PERMITS1
01/22/2018122877510Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/19/2015120058178Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
02/12/2020123886580Open ↗
09/12/2019123818501Open ↗
06/29/2018123375034Open ↗
Showing 3 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/07/2011120058294Open ↗
▸BISSTREET TREE CHECKLIST1
01/31/2011120582976Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00286468-I1Open ↗
▸Environmental & Asbestos27
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/12/2019123818501Open ↗
08/21/2018123375034Open ↗
08/09/2018123375034Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
01/31/2011120582985Open ↗
01/31/2011120582976Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00900453-P1Open ↗
08/29/2026M00900453-I1Open ↗
08/29/2026M00923896-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/29/2026M00900453-I1Open ↗
08/29/2026M00900453-I1Open ↗
08/13/2026M00900453-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
06/22/2015120058294Open ↗
06/22/2015120058294Open ↗
05/07/2015120058294Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
10/12/2011120789398Open ↗
09/07/2011120789398Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/29/2026M00900453-I1Open ↗
08/13/2026M00900453-P1Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
10/15/2019123375034Open ↗
09/12/2019123818501Open ↗
09/12/2019123818501Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/15/2019123375034Open ↗
02/26/2018122877510Open ↗
01/24/2018122878127Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/07/2020123818501Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/12/2011120789398Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2020123818501Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
10/07/2020123818501Open ↗
10/15/2019123375034Open ↗
02/26/2018122877510Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
01/31/2011120582985Open ↗
01/31/2011120582976Open ↗
Showing 2 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/12/2012120058294Open ↗
07/18/2012120058294Open ↗
07/18/2012120789398Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/29/2026M00923896-I1Open ↗
08/13/2026M00286468-I1Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT27
02/12/2020123886580Open ↗
10/15/2019123375034Open ↗
09/12/2019123818501Open ↗
Showing 3 of 27 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/18/2015122495745Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/07/2020123818501Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET15
02/12/2020123886580Open ↗
09/12/2019123818501Open ↗
06/29/2018123375034Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION9
03/18/2020123886580Open ↗
10/29/2019123818501Open ↗
06/29/2018123375034Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM5
03/18/2020123886580Open ↗
03/18/2020123886580Open ↗
10/15/2019123375034Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/29/2018123375034Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M00997196-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00997196-I1Open ↗