← Back
Contractor
TECHNICAL COMFORT OF NY*
General Contractor
2 jobs with open permitsMANHATTAN · 5
4 buildings
7
Total Filings
5
Jobs on File
4
Buildings Worked
2
Jobs w/ Open Permits
General Contractor
Primary Trade
Activity
Jobs by first filing month5 jobs all-time
0134Feb '20 · 1Jan '22 · 1Aug '23 · 3202120222023
bars = month · line = 3-mo average
Portfolio status
Browse jobs →
Open permit240%
Signed off360%
By job type
Alteration5
Most active buildings
All buildings →
17 PITT STREETMANHATTAN · 1 open · latest 04/09/2024
2 jobs
460 GRAND STREETMANHATTAN · 1 open · latest 04/02/2024
1 jobs
306 EAST 61 STREETMANHATTAN · latest 02/23/2022
1 jobs
CLINTON STREETMANHATTAN · latest 05/31/2024
1 jobs
Most recent jobs
All jobs →
JobAddressTypeStatusFiledLatest permitDescription
M00900353 ↗CLINTON STREET
MANHATTAN
AlterationSigned-off08/03/202305/31/2024Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00900453 ↗17 PITT STREET
MANHATTAN
AlterationPermit Issued08/03/202304/09/2024installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00900443 ↗460 GRAND STREET
MANHATTAN
AlterationPermit Issued08/03/202304/02/2024Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00659255 ↗306 EAST 61 STREET
MANHATTAN
AlterationSigned-off01/24/202202/23/2022APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR & 1ST FLOOR ROOF SETBACK AS PER PLANS FILED HEREWITH. NO CHANGE IN…
M00286468 ↗17 PITT STREET
MANHATTAN
AlterationSigned-off02/25/202006/12/2020Installation of split a/c unit. As per plans file herewith, no change to use occupancy or egress
Counts cover all 5 jobs (5 DOB NOW). Dated by first filing; BIS jobs by first permit issuance.
5 DOB NOW jobs, anchored the same way as Buildings Worked. Status is the job's permit state today: open = at least one permit currently issued. BIS jobs show their raw permit status and are not counted as open.
All 5Open permit 2Signed off 3
5 jobs
JobAddressTypeStatusFiledLatest permitDescription
M00900353 ↗CLINTON STREET
MANHATTAN
AlterationSigned-off08/03/202305/31/2024Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00900453 ↗17 PITT STREET
MANHATTAN
AlterationPermit Issued08/03/202304/09/2024installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00900443 ↗460 GRAND STREET
MANHATTAN
AlterationPermit Issued08/03/202304/02/2024Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As…
M00659255 ↗306 EAST 61 STREET
MANHATTAN
AlterationSigned-off01/24/202202/23/2022APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR & 1ST FLOOR ROOF SETBACK AS PER PLANS FILED HEREWITH. NO CHANGE IN…
M00286468 ↗17 PITT STREET
MANHATTAN
AlterationSigned-off02/25/202006/12/2020Installation of split a/c unit. As per plans file herewith, no change to use occupancy or egress
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
SRW ENGINEERS408/14/2025
MG ENGINEERING D.P.C.101/24/2022
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
BERKOWNERS308/14/2025
C/O JAMESTOWN LP101/24/2022
GRAND STREET GUILD EAST HDFC102/25/2020
Who this entity's jobs were filed with. Top 25 per group by shared jobs.
NameJobs togetherMost recent
SOL BUILDING CONSULTING SERVICES308/14/2025
EA DESIGN GROUP, INC.101/24/2022
Click a row for this entity's own jobs, plans and documents at that building.
BuildingFilingsMost Recent
17 PITT STREET ↗207/08/2026
460 GRAND STREET ↗107/08/2026
CLINTON STREET ↗104/09/2026
306 EAST 61 STREET ↗303/21/2026
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/03/2026M00659255-I1Request digital key ↗
08/29/2026M00900453-I1Request digital key ↗
08/29/2026M00900453-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00286468-I1Request digital key ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature28
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M00900453-P1Open ↗
09/01/2026M00900453-P1Open ↗
08/31/2026M00286468-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00659255-I1Open ↗
08/29/2026M00900453-I1Open ↗
08/29/2026M00900453-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00286468-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00659255-I1Open ↗
08/29/2026M00900453-P1Open ↗
08/29/2026M00900453-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/29/2026M00900453-I1Open ↗
08/29/2026M00900453-I1Open ↗
08/13/2026M00900353-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/29/2026M00900453-I1Open ↗
08/13/2026M00900353-P1Open ↗
Showing 2 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00900353-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/03/2026M00659255-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00286468-I1Open ↗