← Back
Four families
131 VERNON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3048649
💬 Discuss this project
1931Year Built
2.5Stories
C3Building Class
R6BZoning
1,880 sfGross Floor Area
4Units
Rent Stabilized73 Open Violations 72 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · 2,000 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 1 filing · 16 docs
Floor 2
Floor 1
Basement1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
131 VERNON ELITE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2024$2.8M—— → —$1,479/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE510/09/2024
AG ENGINEERING PLLC207/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor603/21/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818407/11/2024
Building Lifecycle
All (100)Filed (7)Permit Issued (3)Signed Off (3)Violation (60)Inspection (1)Objection (6)Special Inspection (20)
05/06/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
02/27/2025
Signed off — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-S1
02/24/2025
Signed off — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-I1
02/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2024
Signed off — Alteration
INSTALLATION OF C-JOISTS AND PARTITION FRAMING AS PER DRAWINGS HEREIN. REMOVAL OF BRICK WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01069220-I1
11/25/2024
Violation issued (HPD, open)
I
10/09/2024
Filed — Alteration
B01124570-I1
08/28/2024
Filed — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-S2
08/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/08/2024
Special inspection requirement — Masonry
08/08/2024
Special inspection requirement — Final
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
08/08/2024
Special inspection requirement — Air barrier - visual inspection
08/08/2024
Special inspection requirement — Fenestration air leakage
08/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
08/08/2024
Special inspection requirement — Fenestration areas
07/22/2024
Special inspection requirement — Final
MOHAMMAD AHEAD
07/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
07/17/2024
Objection raised — Scope
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Scope
07/17/2024
Objection resolved — Addressed
07/17/2024
Objection raised — Other
07/17/2024
Objection resolved — Addressed
07/15/2024
Filed — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-P1
07/12/2024
Special inspection requirement — Final
ARIEL GOLSHAN
07/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
07/12/2024
Special inspection requirement — Structural Cold-Formed Steel
NORMAN LOK
07/12/2024
Special inspection requirement — Structural Steel - Details
NORMAN LOK
07/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
07/11/2024
Filed — Alteration
INSTALLATION OF C-JOISTS AND PARTITION FRAMING AS PER DRAWINGS HEREIN. REMOVAL OF BRICK WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01069220-P1
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/11/2024
Special inspection requirement — Final
MOHAMMAD AHEAD
06/26/2024
Permit issued — Structural
B01069220-I1-ST
06/20/2024
Permit issued — Plumbing
B01015855-S1-PL
06/19/2024
Filed — Alteration
INSTALLATION OF C-JOISTS AND PARTITION FRAMING AS PER DRAWINGS HEREIN. REMOVAL OF BRICK WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01069220-I1
06/17/2024
Violation issued (ECB, closed)
Construction
04/12/2024
Violation issued (HPD, open)
A
04/08/2024
Permit issued — General Construction
B01015855-I1-GC
03/07/2024
Filed — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-S1
03/07/2024
Filed — Alteration
SCOPE OF WORK ALTERATION TYPE 2 HEREWITH FILING FOR REMOVAL AND DIRECT REPLACEMENT OF INTERIORNON-BEARING PARTITIONS. DIRECT REPLACEMENT OF KITCHEN CABINETS, FRAMING AND LINTEL. REFINISH FINISHED FLOORS. REPLACE INTERIOR DOORS NO CHANGE IN USE, OCCUPANCY
B01015855-I1
03/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
03/27/2023
Violation issued (HPD, open)
A
03/02/2022
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, closed)
I
08/22/2020
Violation issued (HPD, open)
C
08/22/2020
Violation issued (HPD, open)
C
10/31/2019
Violation issued (HPD, closed)
I
10/22/2018
Violation issued (HPD, closed)
I
11/30/2017
Violation issued (HPD, closed)
I
11/16/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
02/25/2015
Violation issued (HPD, closed)
I
08/19/2009
Violation issued (HPD, open)
C
08/19/2009
Violation issued (HPD, open)
C
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJSB WORKS INC06/26/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC06/20/2024
DOB NOWGeneral ConstructionSigned-offJSB WORKS INC04/08/2024
BISOTISSUEDGUERREROS10/29/2008
BISPLISSUEDAMERICAN NATIONAL PLG & HTG INC10/23/2008
BISOTISSUEDGUERREROS INC06/27/2007
2 projects · most recent 02/04/2025
General Wiring
FiledStatusContractorScope
02/04/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
06/11/2024CompletePOWER DIRECT ELECTRIC INC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/08/2024Tenant Protection Plan Compliance—special
08/08/2024Structural Stability – Alterations of existing buildings—special
08/08/2024Masonry—special
08/08/2024Final—progress
08/08/2024Energy Code Compliance Inspections—progress
08/08/2024Air barrier - visual inspection—energy_progress
08/08/2024Fenestration air leakage—energy_progress
08/08/2024Fenestration and door U-factor and product ratings—energy_progress
08/08/2024Fenestration areas—energy_progress
07/22/2024FinalMOHAMMAD AHEADprogress
07/22/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
07/12/2024FinalARIEL GOLSHANprogress
07/12/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
07/12/2024Structural Cold-Formed SteelNORMAN LOKspecial
07/12/2024Structural Steel - DetailsNORMAN LOKspecial
07/12/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
07/11/2024Tenant Protection Plan Compliance—special
07/11/2024FinalMOHAMMAD AHEADprogress
03/06/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
03/06/2024Fire-Resistant Penetrations and JointsNORMAN LOKspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B01015855-S2Request digital key ↗
08/25/2026B01015855-P1Request digital key ↗
08/25/2026B01015855-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026B01015855-P1Open ↗
08/25/2026B01015855-S2Open ↗
08/25/2026B01015855-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01015855-S1Open ↗
08/25/2026B01069220-I1Open ↗
08/25/2026B01069220-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026B01069220-I1Open ↗
08/24/2026B01015855-I1Open ↗
08/23/2026B01015855-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026B01015855-S2Open ↗
08/25/2026B01015855-P1Open ↗
08/25/2026B01015855-S1Open ↗
Showing 3 of 7 on file for this type