RoofUnder Construction37p · 5 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
HMT Quest: Modifications of interior partitions and finishes to accommodate alterations at partial 1st floor as per plans.
On file for this project
17 documents
Exterior facade reconstruction and repairs work as necessary and per plans submitted. No change in use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 379p · 1 filing · 6 docs
Mechanical
Issued Permit Scope
Mechanical Systems
MODIFICATION OF HVAC EQUIPMENT, PIPING AND DUCTWORK TO ACCOMMODATE THE MAKE-UP AIR PROJECT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 1316p · 3 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
HMT LOUNGE: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE NEW RESIDENTIAL LOUNGE AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
3 documents
HMT LOUNGE: MODIFICATIONS OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATION FOR THE NEW RESIDENTIAL LOUNGE AS PER PLANS. REFER TO ALT 122754082 FOR CHANGE OF USE FOR THE LOUNGE.
On file for this project
6 documents
HMT LOUNGE: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCCOMMODATE ALTERATIONS FOR THE NEW ACCESSORY LOUNGE AS INIDCATED ON PLANS FILED HEREWITH.
On file for this project
7 documents
Floor 12
Floor 11
Floor 10
Floor 9
Floor 812p · 2 filings · 11 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
HMT 8: PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE EXISTING BATHROOMS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 4 drawing sheets
Modifications/installations of plumbing fixtures and piping in guest rooms 811 and 812 in the partial 8th floor of the Helmsley Medical Tower as per plans filed.
On file for this project
4 documents
Floor 7Under Construction15p · 1 filing · 6 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
HT6 & HT7: Remove and relocate sprinkler heads in existing offices on partial 6th and 7th floors to accommodate renovations as per plans filed herewith only.
On file for this project
6 documents · 1 drawing sheet
Floor 6Under Construction28p · 3 filings · 19 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
HT6 & HT7: Remove and relocate sprinkler heads in existing offices on partial 6th and 7th floors to accommodate renovations as per plans filed herewith only.
On file for this project
6 documents · 1 drawing sheet
MODIFICATION OF HVAC EQUIPMENT, PIPING AND DUCTWORK TO ACCOMMODATE THE MAKE-UP AIR PROJECT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents · 1 drawing sheet
HT-6: Modification of interior partitions and finishes to accommodate alterations at partial 6th floor as indicated on plans filed herewith. no change to use, egress or occupancy.
On file for this project
7 documents
Floor 59p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE THE REPLACEMENT OF AHU AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 1 drawing sheet
Floor 49p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE THE REPLACEMENT OF AHU AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 1 drawing sheet
Floor 321p · 2 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
HT-3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATED ALTEERATIONS TO THE PEDS SUB SPECIALTY SUITE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 3 drawing sheets
HMT LOUNGE: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE NEW RESIDENTIAL LOUNGE AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
3 documents · 3 drawing sheets
Floor 256p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE THE REPLACEMENT OF AHU AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 2 drawing sheets
PLUMBING AND HVAC MODIFICATIONS TO ACCOMMODATE THE HT-2 HOME DIALYSIS TRAINING UNIT, PHASE 2, IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
On file for this project
7 documents · 3 drawing sheets
MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE HT-2 HOME DIALYSIS TRAINING UNIT, PHASE 2, IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
On file for this project
8 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1Under Construction85p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
HMT Quest: Modifications of interior partitions and finishes to accommodate alterations at partial 1st floor as per plans.
On file for this project
17 documents · 7 drawing sheets
MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR TENANT-FIT-OUT RENOVATIONS OF 1ST FLOOR FOR COMMERCIAL SPACE NAYA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
INSTALLATION OF SPLIT SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 2.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Cellar12p · 2 filings · 18 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Existing parking garage restoration work per plans submitted. No change in use, occupancy or egress.
On file for this project
10 documents
Application is filed for an interior renovation of an existing retail space to install a new grease traps, new waste line piping and water supper lines as necessary and sprinkler system
On file for this project
8 documents
Sub-Cellar12p · 2 filings · 16 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Existing parking garage restoration work per plans submitted. No change in use, occupancy or egress.
On file for this project
10 documents · 2 drawing sheets
HMT Chiller: Modification of HVAC equipment and ductwork to accommodate alteration for the chiller upgrades as indicted on plans filed herewith.
On file for this project
6 documents
Site & exteriorUnder Construction25p · 25 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructuralOther
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign · Supported Scaffold
Installation of a heavy duty sidewalk shed to include storage
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Exterior facade reconstruction and repairs work as necessary and per plans submitted. No change in use, occupancy or egress.
On file for this project
5 documents · 8 drawing sheets
Latest 3 of 25 filings on this floor.
Filed — no permit issued27p · 5 filings · 18 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
INSTALL NON ILLUMINATED AWNING READING "STARBUCKS"
On file for this project
2 documents · 2 drawing sheets
INSTALL NON ILLUMINATED AWNING READING "STARBUCKS"
On file for this project
2 documents · 1 drawing sheet
MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE DIALYSIS IN-CENTER RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.