← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Century Tower Condominium
132-27 41 ROAD · BIN 4619102
💬 Discuss this project
2021Year Built
8Stories
RMBuilding Class
R6Zoning
45,723 sfGross Floor Area
57Units
LL97 Covered0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: N.Y. EXCELSIOR DEVELOPMENT, LLC · 9,770 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 24p · 5 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY EXCELSIOR DEVELOPMENT LLC4707/08/2026
TRI BOROUGH SCAFFOLDING907/08/2026
FOREVIEW CONTRACTING703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT409/05/2023
EVAN CHAN ARCHITECT, PC506/28/2023
KZ ENGINEERING, P.C208/24/2020
SCALAR ARCHITECTURE PC102/18/2020
A&B WORLD CONSULTING108/01/2019
ARCHINET NY103/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EVAN CHAN ARCHITECT P C1003/21/2026
AE DESIGN SOLUTION203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
JAM CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor807/08/2026
RONG MAINTENANCE INCGeneral Contractor407/08/2026
AL-LECTRIC ELECT'L CONTRGElectrical303/22/2026
JEM FIRE PREVENTION INCFire Protection307/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
XH&RC PLBG AND HTG INCFire Protection207/08/2026
NY CC CONSTRUCTION CORPGeneral Contractor107/08/2026
PACIFIC PLBG. & HTG. CORPFire Protection107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513409/05/2023
EVAN CHAN ARCHITECT, P.C.5605406/28/2023
TIMES BUILDINGS ENGINEERI710108/01/2019
Building Lifecycle
All (94)Filed (14)Permit Issued (15)Signed Off (8)Violation (14)Inspection (9)Objection (4)Special Inspection (30)
10/27/2023
Signed off — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-S1
10/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Signed off — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-I1
09/13/2023
Signed off — Alteration
Q00878669-I1
09/13/2023
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-I1
09/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/06/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
09/06/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
09/06/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
09/06/2023
Special inspection requirement — Lighting controls
DEZHANG FANG
09/06/2023
Special inspection requirement — Final
DEZHANG FANG
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
09/06/2023
Special inspection requirement — Mechanical Systems
DEZHANG FANG
09/05/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-P2
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
09/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
08/30/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
08/30/2023
Special inspection requirement — Lighting controls
DEZHANG FANG
08/30/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
08/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
08/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/30/2023
Special inspection requirement — Final
DEZHANG FANG
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/30/2023
Special inspection requirement — Mechanical Systems
DEZHANG FANG
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-P1
06/29/2023
Special inspection requirement — Sprinkler Systems
Evan Chan
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
06/28/2023
Filed — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-P1
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
06/28/2023
Special inspection requirement — Sprinkler Systems
Evan Chan
06/27/2023
Violation issued (ECB, closed)
Construction
06/27/2023
Violation issued (ECB, closed)
Unknown
06/27/2023
Violation issued (ECB, closed)
Construction
06/27/2023
Violation issued (ECB, closed)
Unknown
06/14/2023
Permit issued — Sprinklers
Q00884483-S1-EW-SP
06/14/2023
Permit issued — Sprinklers
Q00884483-S1-PL
06/12/2023
Permit issued — Sprinklers
Q00878696-I1-EW-SP
06/12/2023
Permit issued — Sprinklers
Q00878696-I1-PL
06/09/2023
Permit issued — General Construction
Q00884483-I1-GC-CX
06/02/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-S1
06/02/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-I1
06/02/2023
Permit issued — General Construction
Q00878669-I1-GC-CX
06/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
05/22/2023
Filed — Alteration
Q00878669-I1
05/22/2023
Filed — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC06/14/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC06/14/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC06/12/2023
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC06/12/2023
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC06/09/2023
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC06/02/2023
DOB NOWCurb CutSigned-offNY CC CONSTRUCTION CORP11/17/2022
DOB NOWStandpipeSigned-offPACIFIC PLBG. & HTG. CORP11/03/2022
DOB NOWStandpipeSigned-offJEM FIRE PREVENTION INC06/09/2022
DOB NOWStandpipeSigned-offJEM FIRE PREVENTION INC07/08/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/19/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/15/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/19/2020
DOB NOWStandpipeSigned-offJEM FIRE PREVENTION INC02/04/2020
BISPLISSUEDPIPESTYLISTS, INC06/24/2022
BIS—ISSUEDNY CC CONSTRUCTION CORP05/23/2022
BIS—ISSUEDNY CC CONSTRUCTION CORP04/12/2022
BISEQISSUEDDYNASTY CONTRACTING LLC01/11/2022
BIS—ISSUEDNY CC CONSTRUCTION CORP04/19/2021
BISPLISSUEDPIPESTYLISTS, INC01/05/2021
BIS—ISSUEDFOREVIEW CONTRACTING INC11/30/2020
BISEQISSUEDDYNASTY CONTRACTING LLC11/12/2020
BIS—ISSUEDFOREVIEW CONTRACTING INC09/04/2020
BIS—ISSUEDFOREVIEW CONTRACTING INC09/04/2020
BIS—ISSUEDFOREVIEW CONTRACTING INC08/07/2020
BISEQISSUEDTRI BOROUGH SCAFFOLDING07/16/2020
BIS—ISSUEDFOREVIEW CONTRACTING INC06/22/2020
BIS—ISSUEDFOREVIEW CONTRACTING INC02/12/2020
BISEQISSUEDPRO-H DEVELOPMENT INC01/28/2019
BISEQISSUEDPRO-H DEVELOPMENT INC02/14/2018
BISEQISSUEDWHA SHEN CONSTRUCTION INC09/29/2016
BISEQISSUEDWHA SHEN CONSTRUCTION INC09/29/2016
BISMHISSUEDCD HOUSING CONST.08/29/2001
7 projects · most recent 06/13/2023
General Wiring
FiledStatusContractorScope
06/13/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
06/13/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
05/14/2022CompleteERIC & NG ELEC'L, INC.General Wiring
01/10/2021CompleteTUXEDO ELEC'L CONTR'G INC—
02/21/2020CompleteV. VASS ELECTRIC CORP—
01/27/2020CompleteERIC & NG ELEC'L, INC.1 meters, 1 new_meters
12/09/2019CompleteJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/06/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
09/06/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
09/06/2023Interior lighting powerDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/06/2023Maintenance informationDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
09/06/2023Lighting controlsDEZHANG FANGenergy_progress
09/06/2023FinalDEZHANG FANGprogress
09/06/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/06/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
09/06/2023Mechanical SystemsDEZHANG FANGspecial
09/05/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
08/30/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
08/30/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
08/30/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
08/30/2023Maintenance informationDEZHANG FANGenergy_progress
08/30/2023Lighting controlsDEZHANG FANGenergy_progress
08/30/2023Interior lighting powerDEZHANG FANGenergy_progress
08/30/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
08/30/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
08/30/2023Tenant Protection Plan Compliance—special
08/30/2023FinalDEZHANG FANGprogress
08/30/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/30/2023Mechanical SystemsDEZHANG FANGspecial
Latest 25 of 37.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
08/25/2026Q00844519-I1Request digital key ↗
08/25/2026Q00844386-I1Request digital key ↗
08/24/2026Q00878669-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00356521-I1Request digital key ↗
08/15/2026Q00356521-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00139398-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00203260-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00317393-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION51
12/01/2022420663302Open ↗
11/16/2022401254432Open ↗
11/03/2022401254432Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION16
09/12/2022420663302Open ↗
07/06/2021420663302Open ↗
10/26/2020420663302Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
05/19/2023420663302Open ↗
11/16/2022401254432Open ↗
11/15/2022420663302Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
12/28/2020420663302Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/23/2022420663302Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/02/2023420663302Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00203260-I1Open ↗
08/28/2026Q00317393-I1Open ↗
08/28/2026Q00356521-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00878696-I1Open ↗
09/02/2026Q00878696-P1Open ↗
08/29/2026Q00884483-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026Q00884483-S1Open ↗
08/29/2026Q00884483-S1Open ↗
08/27/2026Q00356521-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/14/2020440607988Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/14/2020440607988Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING13
10/05/2022420663302Open ↗
09/28/2022420663302Open ↗
09/14/2022420663302Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/15/2023420663302Open ↗
08/15/2023420663302Open ↗
08/15/2023420663302Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/15/2023420663302Open ↗
04/07/2023420663302Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/05/2022420663302Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
12/05/2022420663302Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/23/2022420663302Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/23/2022420663302Open ↗
▸BIS* BOILER (BL) SIGNOFF1
05/11/2023420663302Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
10/01/2019420663302Open ↗
07/24/2019420663302Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/22/2019420663302Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/19/2021420663302Open ↗
10/19/2021420663302Open ↗
06/05/2019420663302Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/23/2021420663302Open ↗
11/23/2021420663302Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/05/2022420663302Open ↗
▸BISFENESTRATION AREAS1
12/05/2022420663302Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/05/2022420663302Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/05/2022420663302Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/05/2022420663302Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/05/2022420663302Open ↗
▸BISELECTRIC MOTORS1
12/05/2022420663302Open ↗
▸BISLIGHTING CONTROLS1
12/05/2022420663302Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY13
10/22/2021420663302Open ↗
10/19/2021420663302Open ↗
12/31/2020440607988Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/04/2020420663302Open ↗
10/01/2019420663302Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/05/2022420663302Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/05/2022420663302Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/05/2022420663302Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/05/2022420663302Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE10
11/05/2020420663302Open ↗
02/18/2020420663302Open ↗
02/10/2020420663302Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/28/2022420663302Open ↗
10/26/2020420663302Open ↗
10/15/2020420663302Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/18/2022421381150Open ↗
10/17/2022421381141Open ↗
12/31/2020440607988Open ↗
▸BISFINAL2
10/14/2022421381141Open ↗
10/14/2022421381150Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership6
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
07/06/2021420663302Open ↗
10/26/2020420663302Open ↗
10/01/2020420663302Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/15/2020420663302Open ↗
10/09/2019420663302Open ↗
07/22/2019420663302Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION32
05/11/2023420663302Open ↗
05/11/2023420663302Open ↗
05/08/2023420663302Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET11
09/29/2021421789791Open ↗
Showing 1 of 11 on file for this type
▸BISBOROUGH INTAKE FORM3
07/06/2021420663302Open ↗
10/01/2020420663302Open ↗
05/19/2020421695847Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/14/2020440607988Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00356521-P1Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
04/18/2022421789791Open ↗
Showing 1 of 2 on file for this type
▸BISVESTIBULES1
12/05/2022420663302Open ↗
▸BISMAINTENANCE INFORMATION1
12/05/2022420663302Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/05/2022420663302Open ↗