← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Century Tower Condominium
132-27 41ST ROAD · BIN 4619102
💬 Discuss this project
2021Year Built
8Stories
RMBuilding Class
R6Zoning
45,723 sfGross Floor Area
57Units
LL97 Covered0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: N.Y. Excelsior Development · 9,770 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsExcelsior Development LLC1 filing
Roof1 filing · 19 docs
Floor 2Dr. Ling, Unit 2C3p · 3 filings · 20 docs
Floor 1
Site & exteriorExcelsior Development LLC3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
N.Y. Excelsior Development4707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fang Architect409/05/2023
Evan Chan Architect506/28/2023
KZ Engineering208/24/2020
Scalar Architecture102/18/2020
A&B World Consulting108/01/2019
Archinet NY103/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Evan Chan Architect P1003/21/2026
AE Design Solution203/21/2026
Synergy Building Consultants203/21/2026
J.A.M. Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold807/08/2026
Rong MaintenanceGeneral Contractor407/08/2026
AL-Lectric Elect'l ContractingElectrical303/22/2026
Jem Fire PreventionFire Protection307/08/2026
XH&RC Plumbing and HeatingFire Protection207/08/2026
XH&RC Plumbing and HeatingPlumbing207/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
Pacific Plumbing & HeatingFire Protection107/08/2026
NY CC ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fang Architect5513409/05/2023
Evan Chan Architect5605406/28/2023
Times Buildings Engineering710108/01/2019
Building Lifecycle
All (94)Filed (14)Permit Issued (15)Signed Off (8)Violation (14)Inspection (9)Objection (4)Special Inspection (30)
10/27/2023
Signed off — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-S1
10/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Signed off — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-I1
09/13/2023
Signed off — Alteration
Q00878669-I1
09/13/2023
Signed off — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-I1
09/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/06/2023
Special inspection requirement — Lighting controls
DEZHANG FANG
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
09/06/2023
Special inspection requirement — Mechanical Systems
DEZHANG FANG
09/06/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/06/2023
Special inspection requirement — Final
DEZHANG FANG
09/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
09/06/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
09/06/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
09/05/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-P2
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
09/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
08/30/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
08/30/2023
Special inspection requirement — Lighting controls
DEZHANG FANG
08/30/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
08/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/30/2023
Special inspection requirement — Final
DEZHANG FANG
08/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/30/2023
Special inspection requirement — Mechanical Systems
DEZHANG FANG
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-P1
06/29/2023
Special inspection requirement — Sprinkler Systems
Evan Chan
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
06/28/2023
Filed — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-P1
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
06/28/2023
Special inspection requirement — Sprinkler Systems
Evan Chan
06/27/2023
Violation issued (ECB, closed)
Construction
06/27/2023
Violation issued (ECB, closed)
Unknown
06/27/2023
Violation issued (ECB, closed)
Construction
06/27/2023
Violation issued (ECB, closed)
Unknown
06/14/2023
Permit issued — Sprinklers
Q00884483-S1-EW-SP
06/14/2023
Permit issued — Plumbing
Q00884483-S1-PL
06/12/2023
Permit issued — Plumbing
Q00878696-I1-PL
06/12/2023
Permit issued — Sprinklers
Q00878696-I1-EW-SP
06/09/2023
Permit issued — Mechanical Systems
Q00884483-I1-GC-CX
06/02/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-S1
06/02/2023
Filed — Alteration
FILED PLUMBING AND SPRINKLER WORK FOR A DOCTOR'S OFFICE RENOVATION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00884483-I1
06/02/2023
Permit issued — General Construction
Q00878669-I1-GC-CX
06/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
05/22/2023
Filed — Alteration
PLUMBING & SPRINKLER WORK FOR THE INTERIOR RENOVATION OF MEDICAL OFFICE. NEW PARTITIONS, PAINT & MECHANICAL WORK. NO CHANGE IN USE OR OCCUPANCY.
Q00878696-I1
05/22/2023
Filed — Alteration
Q00878669-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offXH&RC Plumbing and Heating06/14/2023
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating06/14/2023
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating06/12/2023
DOB NOWSprinklersSigned-offXH&RC Plumbing and Heating06/12/2023
DOB NOWMechanical SystemsSigned-offRong Maintenance06/09/2023
DOB NOWGeneral ConstructionSigned-offRong Maintenance06/02/2023
DOB NOWCurb CutSigned-offNY CC Construction11/17/2022
DOB NOWStandpipeSigned-offPacific Plumbing & Heating11/03/2022
DOB NOWStandpipeSigned-offJem Fire Prevention06/09/2022
DOB NOWStandpipeSigned-offJem Fire Prevention07/08/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding03/31/2021
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding02/19/2021
DOB NOWSupported ScaffoldSigned-offTri Borough Scaffolding07/15/2020
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding02/19/2020
DOB NOWStandpipeSigned-offJem Fire Prevention02/04/2020
BISPLISSUEDPipestylists06/24/2022
BIS—ISSUEDNY CC Construction05/23/2022
BIS—ISSUEDNY CC Construction04/12/2022
BISEQISSUEDDynasty Contracting01/11/2022
BIS—ISSUEDNY CC Construction04/19/2021
BISPLISSUEDPipestylists01/05/2021
BIS—ISSUEDForeview Contracting11/30/2020
BISEQISSUEDDynasty Contracting11/12/2020
BIS—ISSUEDForeview Contracting09/04/2020
BIS—ISSUEDForeview Contracting09/04/2020
BIS—ISSUEDForeview Contracting08/07/2020
BISEQISSUEDTri Borough Scaffolding07/16/2020
BIS—ISSUEDForeview Contracting06/22/2020
BIS—ISSUEDForeview Contracting02/12/2020
BISEQISSUEDPro-H Development01/28/2019
BISEQISSUEDPro-H Development02/14/2018
BISEQISSUEDWha Shen Construction09/29/2016
BISEQISSUEDWha Shen Construction09/29/2016
BISMHISSUEDCD Housing Construction08/29/2001
7 projects · most recent 06/13/2023
General Wiring
FiledStatusContractorScope
06/13/2023CompleteAL-Lectric Elect'l ContractingGeneral Wiring
06/13/2023CompleteAL-Lectric Elect'l ContractingGeneral Wiring
05/14/2022CompleteEric & NG ElectricalGeneral Wiring
01/10/2021CompleteTuxedo Electrical Contracting—
02/21/2020CompleteV. Vass Electric—
01/27/2020CompleteEric & NG Electrical1 meters, 1 new_meters
12/09/2019CompleteJam Electrical—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/06/2023Lighting controlsDEZHANG FANGenergy_progress
09/06/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/06/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
09/06/2023Mechanical SystemsDEZHANG FANGspecial
09/06/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
09/06/2023FinalDEZHANG FANGprogress
09/06/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
09/06/2023Interior lighting powerDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/06/2023Maintenance informationDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
09/06/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
09/05/2023Tenant Protection Plan ComplianceDEZHANG FANGspecial
08/30/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
08/30/2023Interior lighting powerDEZHANG FANGenergy_progress
08/30/2023Lighting controlsDEZHANG FANGenergy_progress
08/30/2023Maintenance informationDEZHANG FANGenergy_progress
08/30/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
08/30/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
08/30/2023Tenant Protection Plan Compliance—special
08/30/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
08/30/2023FinalDEZHANG FANGprogress
08/30/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
08/30/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/30/2023Mechanical SystemsDEZHANG FANGspecial
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dr. LingMedical / HealthcareFloor 2
Project Q00878669 Alteration · LOC Issued · 05/22/2023
Project Q00878696 Alteration · LOC Issued · 05/22/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
08/25/2026Q00844519-I1Request digital key ↗
08/25/2026Q00844386-I1Request digital key ↗
08/24/2026Q00878669-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00356521-I1Request digital key ↗
08/15/2026Q00356521-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00139398-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00203260-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00317393-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION51
12/01/2022420663302Open ↗
11/16/2022401254432Open ↗
11/03/2022401254432Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION16
09/12/2022420663302Open ↗
07/06/2021420663302Open ↗
10/26/2020420663302Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
05/19/2023420663302Open ↗
11/16/2022401254432Open ↗
11/15/2022420663302Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
12/28/2020420663302Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/23/2022420663302Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/02/2023420663302Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00203260-I1Open ↗
08/28/2026Q00317393-I1Open ↗
08/28/2026Q00356521-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00878696-I1Open ↗
09/02/2026Q00878696-P1Open ↗
08/29/2026Q00884483-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/29/2026Q00884483-S1Open ↗
08/29/2026Q00884483-S1Open ↗
08/27/2026Q00356521-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/14/2020440607988Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/14/2020440607988Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING13
10/05/2022420663302Open ↗
09/28/2022420663302Open ↗
09/14/2022420663302Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/15/2023420663302Open ↗
08/15/2023420663302Open ↗
08/15/2023420663302Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/15/2023420663302Open ↗
04/07/2023420663302Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/05/2022420663302Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
12/05/2022420663302Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/23/2022420663302Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/23/2022420663302Open ↗
▸BIS* BOILER (BL) SIGNOFF1
05/11/2023420663302Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
10/01/2019420663302Open ↗
07/24/2019420663302Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/22/2019420663302Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/19/2021420663302Open ↗
10/19/2021420663302Open ↗
06/05/2019420663302Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/22/2019420663302Open ↗
07/22/2019420663302Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/23/2021420663302Open ↗
11/23/2021420663302Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/05/2022420663302Open ↗
▸BISFENESTRATION AREAS1
12/05/2022420663302Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/05/2022420663302Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/05/2022420663302Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/05/2022420663302Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/05/2022420663302Open ↗
▸BISELECTRIC MOTORS1
12/05/2022420663302Open ↗
▸BISLIGHTING CONTROLS1
12/05/2022420663302Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY13
10/22/2021420663302Open ↗
10/19/2021420663302Open ↗
12/31/2020440607988Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/04/2020420663302Open ↗
10/01/2019420663302Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/05/2022420663302Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/05/2022420663302Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/05/2022420663302Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/05/2022420663302Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE10
11/05/2020420663302Open ↗
02/18/2020420663302Open ↗
02/10/2020420663302Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/28/2022420663302Open ↗
10/26/2020420663302Open ↗
10/15/2020420663302Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/18/2022421381150Open ↗
10/17/2022421381141Open ↗
12/31/2020440607988Open ↗
▸BISFINAL2
10/14/2022421381141Open ↗
10/14/2022421381150Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership6
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
07/06/2021420663302Open ↗
10/26/2020420663302Open ↗
10/01/2020420663302Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/15/2020420663302Open ↗
10/09/2019420663302Open ↗
07/22/2019420663302Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION32
05/11/2023420663302Open ↗
05/11/2023420663302Open ↗
05/08/2023420663302Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET11
09/29/2021421789791Open ↗
Showing 1 of 11 on file for this type
▸BISBOROUGH INTAKE FORM3
07/06/2021420663302Open ↗
10/01/2020420663302Open ↗
05/19/2020421695847Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/14/2020440607988Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00356521-P1Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM2
04/18/2022421789791Open ↗
Showing 1 of 2 on file for this type
▸BISVESTIBULES1
12/05/2022420663302Open ↗
▸BISMAINTENANCE INFORMATION1
12/05/2022420663302Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/05/2022420663302Open ↗