← Back
BuildNYC
Other college and university
Manhattan School of Music
132 CLAREMONT AVENUE · Morningside Heights · BIN 1083664
💬 Discuss this project
1900Year Built
21Stories
W6Building Class
R8Zoning
221,785 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 4 likely answered ▸FISP: SAFE
Other college and university · Owner of record: Manhattan School of Music · 25,272 sf lot · 8.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsManhattan School of MusicUnder Construction1 filing
RoofManhattan School of Music7p · 2 filings · 8 docs
Floor 1Manhattan School of Music2p · 1 filing · 8 docs
Site & exteriorManhattan School of Music2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Manhattan School for Music9408/06/2026
Chief Financial Officer703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Simpson Gumpertz & Heger205/15/2025
Kohler Ronan209/19/2024
Ashraf201/31/2023
Jose M. Landauro, P.E210/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates603/21/2026
Rennon Construction203/21/2026
Right Way Services NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bellet Construction CoGeneral Contractor203/21/2026
Four Star Air Con'd CoGeneral Contractor203/21/2026
Holt ConstructionGeneral Contractor208/06/2026
Rennon ConstructionScaffold203/21/2026
High Quality Electric ofElectrical103/21/2026
Amer. Elevator & Mach. CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843405/15/2025
Jose M. Landauro3500210/07/2022
Building Lifecycle
All (122)Filed (8)Permit Issued (5)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (1)Special Inspection (30)
08/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2026
Permit issued — Structural
M01154822-S1-ST
07/30/2026
Permit issued — Foundation
M01154822-I1-FO
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2025
Filed — Alteration
Non-destructive and destructive concrete testing for strength validation of superstructure. Concrete repairs associated with destructive testing.
M01154822-S1
05/15/2025
Filed — Alteration
Non-destructive and destructive concrete testing for strength validation of superstructure. Concrete repairs associated with destructive testing.
M01154822-I1
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
04/16/2025
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
04/09/2025
Special inspection requirement — Final
JOHN MCMONAGLE
03/30/2025
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
12/12/2024
Special inspection requirement — Footing and Foundation
JOHN MCMONAGLE
12/12/2024
Special inspection requirement — Final
JOHN MCMONAGLE
09/24/2024
Signed off — Alteration
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy.
M00876304-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Final
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
09/20/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/19/2024
Filed — Alteration
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy.
M00876304-P1
09/18/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — Final
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
09/18/2024
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
03/01/2024
Signed off — Alteration
Filing for FISP Local Law 11 Facade Repairs work that includes brick masonry repairs, brick replacement, steel lintel replacement, etc. as per plans filed herewith. No change in use, egress or occupancy.
M00765121-I1
12/19/2023
Cycle 9 facade report signed — SAFE
11/15/2023
Cycle 9 facade report submitted
10/20/2023
Cycle 9 facade inspection completed
08/11/2023
Signed off — Alteration
INSTALLATION OF 190' NEW SIDEWALK SHED AT 136 CLAREMONT AVE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M07994569-I1
08/04/2023
Permit issued — Mechanical Systems
M00876304-I1-MS
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/2023
Filed — Alteration
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy.
M00876304-I1
01/31/2023
Filed — Alteration
INSTALLATION OF 190' NEW SIDEWALK SHED AT 136 CLAREMONT AVE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M07994569-P1
11/16/2022
Permit issued — General Construction
M00765121-I1-GC
10/13/2022
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
10/13/2022
Special inspection requirement — Final
JOSE LANDAURO
10/13/2022
Special inspection requirement — Masonry
JOSE LANDAURO
10/07/2022
Filed — Alteration
Filing for FISP Local Law 11 Facade Repairs work that includes brick masonry repairs, brick replacement, steel lintel replacement, etc. as per plans filed herewith. No change in use, egress or occupancy.
M00765121-P1
10/07/2022
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
10/07/2022
Special inspection requirement — Final
JOSE LANDAURO
08/29/2022
Permit issued — Sidewalk Shed
M07994569-I1-SH
08/27/2022
Filed — Alteration
INSTALLATION OF 190' NEW SIDEWALK SHED AT 136 CLAREMONT AVE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M07994569-I1
06/28/2022
Filed — Alteration
Filing for FISP Local Law 11 Facade Repairs work that includes brick masonry repairs, brick replacement, steel lintel replacement, etc. as per plans filed herewith. No change in use, egress or occupancy.
M00765121-I1
04/22/2021
Violation issued (ECB, closed)
Elevators
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/25/2019
Cycle 8 facade report submitted
01/24/2019
Cycle 8 facade report signed — SWARMP
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHolt Construction08/05/2026
DOB NOWFoundationPermit IssuedHolt Construction07/30/2026
DOB NOWMechanical SystemsSigned-offFour Star Air Cond Co08/04/2023
DOB NOWGeneral ConstructionSigned-offBellet Construction Co11/16/2022
DOB NOWSidewalk ShedSigned-offRennon Construction08/29/2022
BISOTISSUEDHard Safari11/25/2020
BISOTISSUEDBellet Construction Co11/14/2018
BISSPISSUEDAJC Sprinkler10/06/2016
BISSPISSUEDAJC Sprinkler09/30/2016
BISSPISSUEDAJC Sprinkler09/29/2016
BISOTISSUEDBurda Construction08/30/2016
BISOTISSUEDBurda Construction08/30/2016
BISMHISSUEDBurda Construction08/30/2016
BISMHISSUEDBurda Construction08/30/2016
BISOTISSUEDBurda Construction08/30/2016
BISOTISSUEDBurda Construction08/30/2016
BISMHISSUEDBurda Construction08/30/2016
BISOTISSUEDBurda Construction08/30/2016
BISOTISSUEDBurda Construction08/30/2016
BISPLISSUEDWawel Plumbing and Heating08/11/2016
BISPLISSUEDA.M.N07/29/2016
BISEQISSUEDBurda Construction07/28/2016
BISMHISSUEDBurda Construction07/28/2016
BISOTISSUEDBurda Construction07/28/2016
BISOTISSUEDBurda Construction07/28/2016
BISPLISSUEDA.M.N07/22/2016
BISOTISSUEDBurda Construction07/20/2016
BISOTISSUEDBurda Construction07/20/2016
BISMHISSUEDBurda Construction07/20/2016
BISPLISSUEDA.M.N07/14/2016
BISOTISSUEDBurda Construction07/13/2016
BISOTISSUEDBurda Construction07/13/2016
BISMHISSUEDBurda Construction07/13/2016
BISMHISSUEDEvco Mechanical07/08/2016
BISOTISSUEDBellet Construction Co06/02/2016
BISOTISSUEDBellet Construction Co04/05/2016
BISEQISSUEDRockledge Scaffold02/08/2016
BISPLISSUEDWawel Plumbing and Heating08/19/2015
BISMHISSUEDEvco Mechanical07/15/2015
BISEQISSUEDRockledge Scaffold02/20/2015
+ 15 more permits on file
5 projects · most recent 06/25/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedNee Electrical—
09/09/2022Permit IssuedHigh Quality Electric of—
08/04/2020CompleteAmer. Elevator & Mach. CoGeneral Wiring
01/13/2020Permit IssuedCollege ElectricHVAC Wiring
04/27/2018CompleteAmer. Elevator & Mach. Co—
1 project · most recent 05/15/2025
Concrete
FiledStatusContractorScope
05/15/2025Permit IssuedHolt ConstructionConcrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/14/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
05/14/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
04/16/2025Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
04/09/2025FinalJOHN MCMONAGLEprogress
03/30/2025Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
12/12/2024Footing and FoundationJOHN MCMONAGLEprogress
12/12/2024FinalJOHN MCMONAGLEprogress
09/20/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
09/20/2024Post-installed AnchorsJOHN MCMONAGLEspecial
09/20/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/20/2024Mechanical SystemsJOHN MCMONAGLEspecial
09/20/2024FinalJOHN MCMONAGLEprogress
09/20/2024Shutoff dampersJOHN MCMONAGLEenergy_progress
09/20/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
09/20/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
09/20/2024Maintenance informationJOHN MCMONAGLEenergy_progress
09/18/2024Mechanical SystemsJOHN MCMONAGLEspecial
09/18/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
09/18/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
09/18/2024Maintenance informationJOHN MCMONAGLEenergy_progress
09/18/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
09/18/2024FinalJOHN MCMONAGLEprogress
09/18/2024Post-installed AnchorsJOHN MCMONAGLEspecial
09/18/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
09/18/2024Shutoff dampersJOHN MCMONAGLEenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Manhattan School of MusicEducationEntire building
Project M01154822 Alteration · Permit Entire · 05/15/2025
Project M00876304 Alteration · LOC Issued · 05/26/2023
Project M07994569 Alteration · LOC Issued · 08/27/2022
Project M00765121 Alteration · LOC Issued · 06/28/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00765121-I1Request digital key ↗
09/02/2026M00765121-P1Request digital key ↗
09/01/2026M07994569-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits123
▸BISPLAN / WORK APPROVAL APPLICATION79
08/19/2025141028180Open ↗
05/08/2025123382721Open ↗
04/30/2025123382721Open ↗
Showing 3 of 79 on file for this type
▸BISWORK PERMIT APPLICATION41
11/14/2018123126544Open ↗
10/13/2016140503667Open ↗
10/11/2016140503532Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/16/2020102484731Open ↗
▸BISPLACE OF ASSEMBLY1
08/09/2017123037542Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/29/2016122787564Open ↗
▸Seals & Professional Certifications99
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION60
01/17/2020122787911Open ↗
01/17/2020122787911Open ↗
01/17/2020122787911Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026M00765121-P1Open ↗
09/02/2026M00765121-I1Open ↗
09/01/2026M07994569-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00876304-P1Open ↗
09/01/2026M00876304-P1Open ↗
08/29/2026M00765121-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
10/04/2018123167508Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00876304-P1Open ↗
08/29/2026M00765121-I1Open ↗
08/27/2026M00876304-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/04/2018123167508Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
08/19/2025141028180Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING11
08/26/2016140503532Open ↗
08/19/2016140503667Open ↗
08/19/2016140503532Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
09/02/2016122478050Open ↗
08/31/2016122478050Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/17/2020122787911Open ↗
01/17/2020122787911Open ↗
06/26/2019122787920Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
01/17/2020122787911Open ↗
06/26/2019122787920Open ↗
▸BISHEATING SYSTEMS1
01/13/2023122787564Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/04/2017122691211Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/13/2023122787564Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes11
08/17/2018123126544Open ↗
08/31/2016140503667Open ↗
08/31/2016140503532Open ↗
Showing 3 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/17/2018123126544Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
01/17/2020122787911Open ↗
01/17/2020122787911Open ↗
06/26/2019122787920Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
01/17/2020122787911Open ↗
06/26/2019122787920Open ↗
02/05/2019123126544Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/13/2023122787564Open ↗
▸BISELECTRIC MOTORS1
01/13/2023122787564Open ↗
▸BISLIGHTING CONTROLS1
01/13/2023122787564Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/13/2023122787564Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/13/2023122787564Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/13/2023122787564Open ↗
▸BISINTERIOR LIGHTING POWER1
01/13/2023122787564Open ↗
▸BIS* DUCT LEAKAGE TESTING1
01/13/2023122787564Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/27/2020123167508Open ↗
11/23/2020123167508Open ↗
08/31/2016140503532Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
08/31/2016140503667Open ↗
Showing 1 of 3 on file for this type
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
01/13/2023122787564Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/13/2023122787564Open ↗
▸BISMECHANICAL SYSTEMS1
01/13/2023122787564Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/13/2023122787564Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/13/2023122787564Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/13/2023122787564Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/13/2023122787564Open ↗
▸BIS* EXIT SIGNS1
01/13/2023122787564Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
01/19/2023140503532Open ↗
11/27/2020123167508Open ↗
01/17/2020122787911Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/02/2026M00765121-P1Open ↗
09/02/2026M00765121-I1Open ↗
08/13/2026M00876304-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
04/14/2025123382721Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT41
11/27/2020123167508Open ↗
01/17/2020122787911Open ↗
06/26/2019122787920Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
01/18/2023122780534Open ↗
01/13/2023122787564Open ↗
12/29/2022122780525Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/21/2016122787564Open ↗
09/20/2016122787911Open ↗
Showing 2 of 3 on file for this type
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET30
10/04/2018123167508Open ↗
08/17/2018123382721Open ↗
08/17/2018123126544Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION24
01/06/2020122787911Open ↗
12/20/2019102164694Open ↗
10/29/2018123126544Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM9
01/17/2020122787911Open ↗
12/05/2019122787911Open ↗
10/30/2019122787911Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/19/2025141028180Open ↗
Showing 1 of 6 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
06/25/2018123037542Open ↗
08/31/2016140503667Open ↗
08/31/2016140503667Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/07/2017122478050Open ↗
▸BISSHUTOFF DAMPERS1
01/13/2023122787564Open ↗