← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
132 GREENE STREET
MANHATTAN · BIN 1077763
💬 Discuss this project
1886Year Built
6Stories
D0Building Class
M1-5/R7XZoning
61,999 sfGross Floor Area
52Units
LL97 CoveredRent Stabilized0 Active Violations 2 likely answered ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: Greene St Realty · 11,300 sf lot · 5.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof950 Second Ave LLCUnder Construction19p · 6 filings · 20 docs
Floor 3Unit 3R35p · 3 filings · 20 docs
Floor 2Structural brick removal from arch openings1 filing · 8 docs
Floor 1950 Second Ave LLCUnder Construction13p · 9 filings · 20 docs
Mezzanine2p · 1 filing · 15 docs
Cellar950 Second Ave LLCUnder Construction13p · 9 filings · 20 docs
Site & exteriorGreene Street Holding CORP5p · 2 filings · 6 docs
Filed — no permit issued950 Second Ave LLC6p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Greene Street Holding9403/22/2026
950 Second Ave4507/08/2026
Campaniello Enterprises403/21/2026
Marbrose Realty303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Concepts603/21/2026
Metropolis Group1003/21/2026
Perotto Consulting Management1603/21/2026
J Callahan Consulting1203/21/2026
Louis Striar403/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold403/21/2026
CSC RenoGeneral Contractor303/21/2026
Exa USAGeneral Contractor306/02/2026
Schimenti Construction CoGeneral Contractor307/08/2026
Approved ChimneyGeneral Contractor303/21/2026
Arcon Plumbing SolutionsPlumbing207/08/2026
A Plus PlumbingFire Protection106/27/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
U.S. ElectricElectrical103/21/2026
Sean Coakley P & HPlumbing107/08/2026
C.M. Richey Electrical ContractingElectrical103/22/2026
Throop Electric CoElectrical103/21/2026
Vintage Electric ServiceElectrical103/21/2026
Sea-Dar EnterprisesGeneral Contractor107/08/2026
A Plus PlumbingPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HT Engineering6274507/21/2026
PSI Agency254402/09/2026
The Eipel Engineering Group2714202/02/2026
Wavic Engineering1733211/14/2024
Gregory V. Perotto, P.E947710/02/2024
Avt Engineering345211/19/2021
Bazini Engineering1808110/15/2019
Building Lifecycle
10/06/2026
Filed — Alteration
This alteration is being filed for the removal of interior brick at existing archways. 3 hours fire-rated shutter to be installed. There are no change in use, egress or occupancy under this application.
M01456040-I1
10/06/2026
Filed — Alteration
This alteration is being filed for the removal of interior brick at existing archways. 3 hours fire-rated shutter to be installed. There are no change in use, egress or occupancy under this application.
M01456040-S1
09/04/2026
Special inspection requirement — Masonry
09/04/2026
Special inspection requirement — Final
08/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
222 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA Plus Plumbing03/17/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing03/17/2026
DOB NOWMechanical SystemsPermit IssuedExa USA02/17/2026
DOB NOWStructuralPermit IssuedExa USA02/13/2026
DOB NOWGeneral ConstructionPermit IssuedExa USA02/13/2026
DOB NOWMechanical SystemsPermit IssuedSchimenti Construction Co12/06/2024
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co12/06/2024
DOB NOWPlumbingPermit IssuedSean Coakley P & H12/04/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/22/2024
DOB NOWPlumbingSigned-offArcon Plumbing Solutions11/29/2023
DOB NOWPlumbingSigned-offArcon Plumbing Solutions12/01/2022
DOB NOWGeneral ConstructionSigned-offSea-Dar Enterprises10/19/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating01/05/2022
DOB NOWGeneral ConstructionSigned-offCSC Reno09/28/2021
DOB NOWMechanical SystemsSigned-offApproved Chimney10/16/2019
DOB NOWSidewalk ShedSigned-offArsenal Scaffold06/13/2018
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold06/12/2018
BISBLISSUEDJack Piccini05/29/2024
BISPLISSUEDHorbridge Plumbing & Heating01/09/2024
BISPLISSUEDHorbridge Plumbing & Heating10/06/2022
BISBLISSUEDJack Piccini10/21/2021
BISBLISSUEDJack Piccini01/14/2021
BISFBISSUEDDavid Jablon07/22/2020
BISBLISSUEDDavid Jablon07/03/2019
BISEQISSUEDRock Group NY02/26/2018
BISEQISSUEDRock Group NY11/13/2017
BISEQISSUEDRock Group NY02/28/2017
BISEQISSUEDRock Group NY11/02/2016
BISPLISSUEDStar Cities PLB & Heating03/30/2015
BISOTISSUEDChristos Farantatos03/19/2015
BISMHISSUEDTameer08/26/2014
BISSPISSUEDDC Building Services10/25/2012
BISSPISSUEDS.T.P. P & H04/16/2012
BISOTISSUEDFranco Remodeling11/10/2011
BISOTISSUEDVincon Enterprises07/05/2011
BISOTISSUEDVincon Enterprises07/05/2011
BISMHISSUEDVincon Enterprises07/05/2011
BISPLISSUEDHydrokinetic Plumbing & Heating I05/27/2011
BISSPISSUEDArmon Mechanical04/07/2011
BISPLISSUEDArmon Mechanical03/18/2011
+ 27 more permits on file
3 projects · most recent 07/21/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScope
07/21/2026Permit IssuedExa USAHeating and Air Conditioning Systems
10/02/2024Permit IssuedSchimenti Construction CoAir Conditioning Systems
08/30/2023——Air Conditioning Systems
2 projects · most recent 07/21/2026
Sprinkler System
FiledStatusContractorScope
07/21/2026Permit IssuedA Plus PlumbingSprinkler System
10/24/2023——Sprinkler System
4 projects · most recent 07/21/2026
Water/Sanitary
FiledStatusContractorScope
07/21/2026Signed-offA Plus PlumbingWater/Sanitary
10/02/2024Permit IssuedSean Coakley P & HWater/Sanitary
10/24/2023———
08/30/2023——Water/Sanitary
8 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026Permit IssuedForest Brook Electrical ContractingGeneral Wiring
05/02/2025CompleteTriza Electrical—
03/04/2025CompleteC.M. Richey Electrical ContractingGeneral Wiring
08/23/2023CompleteAcm ElectricGeneral Wiring
10/21/2022CompleteV.I.P. Electl ContractingGeneral Wiring
10/08/2021CompleteGoodall ElectricGeneral Wiring
05/24/2019Permit IssuedStar Electrical Contractors—
05/14/2018CompleteNash Electric Services—
4 projects · most recent 10/06/2026
Steel Masonry
FiledStatusContractorScope
10/06/2026——Masonry
07/21/2026Signed-offA Plus PlumbingSteel
09/30/2024——Steel
08/28/2023——Steel
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
09/04/2026Masonry—special
09/04/2026Final—progress
09/04/2026Final—progress
07/24/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
07/24/2026Post-installed AnchorsHENRY TORRESspecial
07/24/2026Tenant Protection Plan Compliance—special
07/14/2026Post-installed AnchorsHENRY TORRESspecial
07/14/2026Tenant Protection Plan Compliance—special
07/14/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
01/21/2026Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
01/21/2026Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
01/21/2026Post-installed AnchorsHENRY TORRESspecial
01/21/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
01/20/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
01/20/2026FinalJoseph Tarellaprogress
11/19/2025Sprinkler SystemsHENRY TORRESspecial
11/14/2024Tenant Protection Plan Compliance—special
11/04/2024Sprinkler SystemsDARIUSZ LUCZAKspecial
09/10/2024Structural Steel - Details—special
09/10/2024Tenant Protection Plan Compliance—special
09/10/2024Structural Steel - Welding—special
09/10/2024Post-installed Anchors—special
09/10/2024Structural Stability – Alterations of existing buildings—special
09/10/2024Structural Steel - High Strength Bolting—special
09/10/2024Final—progress
Latest 25 of 54.
452 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account