← Back
Three families
1324 74 STREET
BROOKLYN · Dyker Heights · BIN 3159422
💬 Discuss this project
1905Year Built
2.5Stories
C0Building Class
R4AZoning
2,829 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · 4,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 2 docs
Floor 1
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAPPALARDI CONSTRUCTION1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/19/2022$2.4M—Private party → Private party$841/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARIANNE RUSSO606/06/2022
GRANT ENGINEERING CONSULTANTS, LLC102/16/2021
IMC ARCHITECTURE DPC109/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAPPALARDI CONSTRUCTION LLCGeneral Contractor403/21/2026
A.G.M. P & H INCPlumbing407/08/2026
A G M P HGeneral Contractor303/22/2026
QUALITA' ITALIA CONTRACTOGeneral Contractor303/21/2026
TESTA, RONALDElectrical103/21/2026
RONALD TESTAElectrical103/21/2026
LAZARE, CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666606/06/2022
Building Lifecycle
All (85)Filed (8)Permit Issued (4)Signed Off (2)Violation (13)Inspection (4)Objection (24)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
03/21/2023
Violation issued (HPD, open)
A
06/21/2022
Signed off — Alteration
CEL FL: 1TOILET,1 LAV,3GAS HEATERS, 2FL.DRAIN,1WASHER,1DRYER. 1 FL:1 TOILET,1LAV,1 TUB, 1RES SINK, 1DISHWASH,1STOVE. 2 FL:2TOILETS,2 LAV, 1TUB, 1SHOWER, 1SINK, 1DISHWASHER, 1STOVE, 3 FL:1 TOILET,1LAV,1TUB,1 SINK,1DISHWASH,1STOVE.
B00452143-I1
06/16/2022
Signed off — Alteration
Interior partitions at cellar, first, second floors. rebuild third floor and roof due to fire damage. new porch at rear yard. new Interior steps to cellar from first floor. new exterior steps to cellar floor.
B00452103-I1
06/13/2022
Special inspection requirement — Fenestration areas
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Lighting in dwelling units
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Interior lighting power
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Lighting controls
MARIANNE RUSSO
06/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
06/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/13/2022
Special inspection requirement — Structural Wood Frame
ALEKSANDR LEVIN
06/13/2022
Special inspection requirement — Energy Code Compliance
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/13/2022
Special inspection requirement — Footing and Foundation
ALEKSANDR LEVIN
06/13/2022
Special inspection requirement — Final
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
06/13/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIANNE RUSSO
06/10/2022
Objection raised — Scope
06/10/2022
Objection resolved — Addressed
06/06/2022
Filed — Alteration
Interior partitions at cellar, first, second floors. rebuild third floor and roof due to fire damage. new porch at rear yard. new Interior steps to cellar from first floor. new exterior steps to cellar floor.
B00452103-P3
06/06/2022
Objection raised — Scope
06/06/2022
Objection resolved — Addressed
06/01/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
06/01/2022
Special inspection requirement — Energy Code Compliance
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Final
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/01/2022
Special inspection requirement — Footing and Foundation
ALEKSANDR LEVIN
06/01/2022
Special inspection requirement — Structural Wood Frame
ALEKSANDR LEVIN
06/01/2022
Special inspection requirement — Interior lighting power
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Lighting controls
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Lighting in dwelling units
MARIANNE RUSSO
06/01/2022
Special inspection requirement — Fenestration areas
MARIANNE RUSSO
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIANNE RUSSO
05/11/2022
Filed — Alteration
Interior partitions at cellar, first, second floors. rebuild third floor and roof due to fire damage. new porch at rear yard. new Interior steps to cellar from first floor. new exterior steps to cellar floor.
B00452103-P2
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
12/10/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/08/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
MARIANNE RUSSO
11/29/2021
Filed — Alteration
Interior partitions at cellar, first, second floors. rebuild third floor and roof due to fire damage. new porch at rear yard. new Interior steps to cellar from first floor. new exterior steps to cellar floor.
B00452103-P1
10/25/2021
Filed — Alteration
CEL FL: 1TOILET,1 LAV,3GAS HEATERS, 2FL.DRAIN,1WASHER,1DRYER. 1 FL:1 TOILET,1LAV,1 TUB, 1RES SINK, 1DISHWASH,1STOVE. 2 FL:2TOILETS,2 LAV, 1TUB, 1SHOWER, 1SINK, 1DISHWASHER, 1STOVE, 3 FL:1 TOILET,1LAV,1TUB,1 SINK,1DISHWASH,1STOVE.
B00452143-P1
10/15/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/16/2021
Permit issued — Construction Fence
B00401827-I1-FN
08/23/2021
Permit issued — Plumbing
B00452143-I1-PL
05/10/2021
Permit issued — General Construction
B00452103-I1-GC-CX
04/26/2021
Objection resolved — Addressed
04/26/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Admin
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPAPPALARDI CONSTRUCTION LLC09/16/2021
DOB NOWPlumbingSigned-offA.G.M. P & H INC08/23/2021
DOB NOWGeneral ConstructionSigned-offPAPPALARDI CONSTRUCTION LLC05/10/2021
DOB NOWConstruction FencePermit IssuedQUALITA' ITALIA CONTRACTO03/19/2021
BISOTISSUEDPAPPALARDI CONSTRUCTION LLC11/27/2012
2 projects · most recent 05/09/2022
General Wiring
FiledStatusContractorScope
05/09/2022CompleteTESTA ELECTRIC CO., INCGeneral Wiring
08/30/2021CompleteTESTA ELECTRIC CO., INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/10/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/15/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/28/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/13/2022Fenestration areasMARIANNE RUSSOenergy_progress
06/13/2022Lighting in dwelling unitsMARIANNE RUSSOenergy_progress
06/13/2022Interior lighting powerMARIANNE RUSSOenergy_progress
06/13/2022Lighting controlsMARIANNE RUSSOenergy_progress
06/13/2022HVAC-R and service water piping design and insulationMARIANNE RUSSOenergy_progress
06/13/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
06/13/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/13/2022Structural Wood FrameALEKSANDR LEVINprogress
06/13/2022Energy Code ComplianceMARIANNE RUSSOprogress
06/13/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/13/2022Footing and FoundationALEKSANDR LEVINprogress
06/13/2022FinalMARIANNE RUSSOprogress
06/13/2022Energy Code Compliance InspectionsMARIANNE RUSSOprogress
06/13/2022Fenestration and door U-factor and product ratingsMARIANNE RUSSOenergy_progress
06/01/2022Fenestration and door U-factor and product ratingsMARIANNE RUSSOenergy_progress
06/01/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/01/2022Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
06/01/2022Energy Code ComplianceMARIANNE RUSSOprogress
06/01/2022Energy Code Compliance InspectionsMARIANNE RUSSOprogress
06/01/2022FinalMARIANNE RUSSOprogress
06/01/2022Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/01/2022Footing and FoundationALEKSANDR LEVINprogress
06/01/2022Structural Wood FrameALEKSANDR LEVINprogress
06/01/2022Interior lighting powerMARIANNE RUSSOenergy_progress
06/01/2022Lighting controlsMARIANNE RUSSOenergy_progress
Latest 25 of 33.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch - General Construction5
09/01/2026B00464224-I1Request digital key ↗
09/01/2026B00452103-P1Request digital key ↗
09/01/2026B00452103-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Foundation4
09/01/2026B00452103-P1Request digital key ↗
09/01/2026B00452103-P2Request digital key ↗
08/15/2026B00452103-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/01/2026B00452103-P2Request digital key ↗
08/15/2026B00452103-I1Request digital key ↗
08/15/2026B00452103-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00452143-P1Request digital key ↗
08/14/2026B00452143-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00401827-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/26/2012320564304Open ↗
▸BISWORK PERMIT APPLICATION1
11/28/2012320564304Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B00452103-I1Open ↗
09/01/2026B00452103-I1Open ↗
09/01/2026B00452103-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00464224-I1Open ↗
09/01/2026B00452103-I1Open ↗
09/01/2026B00452103-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00452103-I1Open ↗
08/31/2026B00452103-P3Open ↗
08/25/2026B00452143-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/01/2013320564304Open ↗
11/26/2012320564304Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00452103-P1Open ↗
09/01/2026B00452103-P2Open ↗
09/01/2026B00452143-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/26/2012320564304Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/01/2013320564304Open ↗
11/28/2012320564304Open ↗
11/26/2012320564304Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00452143-I1Open ↗
08/13/2026B00452103-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/01/2013320564304Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/02/2013320564304Open ↗
04/01/2013320564304Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/26/2012320564304Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/02/2013320564304Open ↗
05/02/2013320564304Open ↗