| Owner | Filings | Most Recent |
|---|---|---|
| PLATINUM SERVICES NY | 4 | 07/08/2026 |
| NEW YORK PRESBYTERIAN HOSPITAL | 16 | 07/08/2026 |
| HOUSES PHIPPS SERVICES | 5 | 03/22/2026 |
| ROYAL CHARTER PROPERTIES INC. | 85 | 03/22/2026 |
| NY PRESBYTERIAN HOSPITAL | 2 | 03/21/2026 |
| SOCIETY OF THE N Y HOSPITAL | 6 | 03/21/2026 |
| ROYAL CHARLES PROPERTIES | 2 | 03/21/2026 |
| ROYAL CHARTER PROPERTIES EAST | 23 | 03/21/2026 |
| NEW YORK HOSPITAL | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CRUICKSHANKS ENGINEERING & CONSULTI | 2 | 07/10/2026 |
| JOEL PHAGOO P.E. PLLC | 2 | 07/06/2026 |
| WSP | 2 | 03/25/2026 |
| HORACIO REPETTO | 1 | 03/24/2026 |
| JACOB FEINBERG KATZ & MICHAELI CONS | 3 | 03/12/2026 |
| NICHOLAS J. DEFELICE, P.E. | 1 | 11/21/2025 |
| RIMKUS NEW YORK PLLC | 3 | 10/31/2025 |
| GOLDMAN COPELAND ASSOCIATES | 4 | 08/22/2025 |
| RAHMAN CONSULTING | 2 | 08/19/2024 |
| VINCENT J. LIOTTA P.E. | 1 | 08/08/2024 |
| SHAABAN ENGINEERING, LLC | 13 | 06/04/2024 |
| NEW YORK DESIGN ARCHITECTS, LLP | 4 | 05/15/2024 |
| INTEGRATED DESIGN GROUP | 4 | 03/13/2024 |
| TAN ENGINEERING PC | 3 | 02/27/2024 |
| ALAN FELD | 1 | 02/27/2024 |
| COSENTINI ASSOCIATES | 9 | 11/28/2023 |
| NAROFSKY ARCHITECTURE & DESIGN PC | 3 | 08/04/2023 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 08/01/2023 |
| STANDARD ARCHITECTS | 1 | 02/09/2023 |
| LAFAZIA ARCHITECTURE | 2 | 05/19/2022 |
| ASHRAF CORP | 1 | 07/12/2021 |
| SCALAR ARCHITECTURE PC | 1 | 08/29/2019 |
| MURDOCH ENGINEERING | 7 | 10/31/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL EXPEDITING | 58 | 03/21/2026 |
| KAZAM CONSULTANTS | 14 | 03/21/2026 |
| ENCORE | 13 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| WEST AZE | 4 | 03/21/2026 |
| NEW YORK DESIGN ARCHITECTS | 8 | 03/21/2026 |
| RIMKUS NEW YORK PLLC | 6 | 03/21/2026 |
| CH BUILDING CONSULTANTS | 4 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| NATIONAL MAINTENANCE INC | General Contractor | 16 | 07/08/2026 |
| H.M. HUGHES CO. INC | General Contractor | 10 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 9 | 03/21/2026 |
| BALATON CONSULTING LLC | Scaffold | 7 | 07/08/2026 |
| AMERICAN RESIDENTIAL CON* | General Contractor | 7 | 07/08/2026 |
| BHAGHIANA GENERAL CONSTRU | General Contractor | 6 | 07/11/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 4 | 07/08/2026 |
| CANNON MECHANICAL INC | General Contractor | 4 | 07/05/2026 |
| MAMC CONSULTING REPS LLC | General Contractor | 4 | 07/08/2026 |
| COOPER WORKS INC | General Contractor | 3 | 07/08/2026 |
| RIEHM PLUMBING CORP. | Fire Protection | 3 | 08/26/2026 |
| PRODUCTION CONTRACT. LLC | General Contractor | 3 | 03/21/2026 |
| RIEHM PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 3 | 07/08/2026 |
| YATES EXTERIOR RESTORATION | General Contractor | 3 | 03/21/2026 |
| N Y SIGN ART | Scaffold | 2 | 07/08/2026 |
| HELLMAN CONSTRUCTION CO | General Contractor | 2 | 07/08/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| AL-LECTRIC ELECT'L CONTRG | Electrical | 1 | 03/22/2026 |
| DNA PLUMBING CONTR. INC | Fire Protection | 1 | 07/08/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 1 | 07/08/2026 |
| L.F. DRISCOLL COMPANY LLC | General Contractor | 1 | 07/08/2026 |
| SANG CHEUNG | Electrical | 1 | 03/21/2026 |
| PORRINO, MARIN | Electrical | 1 | 03/21/2026 |
| P.K. CONSTRUCTION NY INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CRUICKSHANKS ENGINEERING | 6370 | 2 | 07/10/2026 |
| JOEL PHAGOO ,PE, PLLC | 2416 | 1 | 07/06/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 34 | 03/25/2026 |
| FENAGH, INC | 6942 | 6 | 03/12/2026 |
| TECTONIC ENGINEERING CONS | 106 | 2 | 03/04/2025 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 08/08/2024 |
| AKS ARCHITECTURAL & ENGIN | 1957 | 4 | 05/15/2024 |
| TAN ENGINEERING, P.C. | 1291 | 3 | 02/27/2024 |
| METROSPEC SIA | 6420 | 4 | 02/27/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | RIEHM PLUMBING CORP. | 08/25/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | BHAGHIANA GENERAL CONSTRU | 07/10/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | BHAGHIANA GENERAL CONSTRU | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | HELLMAN CONSTRUCTION CO | 06/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HELLMAN CONSTRUCTION CO | 06/03/2026 |
| DOB NOW | General Construction | Permit Issued | L.F. DRISCOLL COMPANY LLC | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | BHAGHIANA GENERAL CONSTRU | 04/24/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | BHAGHIANA GENERAL CONSTRU | 04/15/2026 |
| DOB NOW | Construction Fence | Permit Issued | BHAGHIANA GENERAL CONSTRU | 01/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | BLUE TECH CONST. NY, CORP | 12/09/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | BHAGHIANA GENERAL CONSTRU | 11/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CANNON MECHANICAL INC | 09/19/2025 |
| DOB NOW | General Construction | Signed-off | YATES EXTERIOR RESTORATIO | 07/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HM HUGHES CO INC | 03/21/2025 |
| DOB NOW | Sprinklers | Signed-off | VILLAGE P & H NY INC | 10/29/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 10/22/2024 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 08/20/2024 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 08/20/2024 |
| DOB NOW | Mechanical Systems | Signed-off | POWER COOLING INC | 08/14/2024 |
| DOB NOW | Plumbing | Signed-off | VILLAGE P & H NY INC | 07/30/2024 |
| DOB NOW | General Construction | Permit Issued | NATIONAL MAINTENANCE INC | 07/10/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 06/10/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 06/10/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 06/10/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 06/10/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 06/10/2024 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 04/16/2024 |
| DOB NOW | General Construction | Signed-off | AMERICAN RESIDENTIAL CON* | 04/01/2024 |
| DOB NOW | Mechanical Systems | Signed-off | COOPER WORKS | 03/25/2024 |
| DOB NOW | General Construction | Signed-off | COOPER WORKS | 03/25/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 03/22/2024 |
| DOB NOW | General Construction | Permit Issued | NATIONAL MAINTENANCE INC | 03/21/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 03/21/2024 |
| DOB NOW | General Construction | Signed-off | NATIONAL MAINTENANCE INC | 03/21/2024 |
| DOB NOW | Plumbing | Signed-off | SCHUMACHER & FARLEY P&H C | 12/06/2023 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 12/05/2023 |
| DOB NOW | Mechanical Systems | Signed-off | PRODUCTION CONTRACT. LLC | 12/04/2023 |
| DOB NOW | Plumbing | Signed-off | LAB PLBG & HTG CO INC | 11/09/2023 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 10/20/2023 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 10/17/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/22/2025 | Permit Issued | CANNON MECHANICAL INC | Heating and Air Conditioning Systems, Ventilation Systems | |
| 10/28/2022 | — | — | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2026 | Permit Issued | RIEHM PLUMBING CORP | Sprinkler System |
| 03/12/2026 | — | — | 3 heads |
| 10/28/2022 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/12/2026 | — | — | — |
| 10/28/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | Permit Issued | SCHLESINGER ELECT'L CONTR | General Wiring |
| 09/01/2026 | Complete | AL-LECTRIC ELECT'L CONTRG | — |
| 07/28/2026 | Permit Issued | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 04/13/2026 | Permit Issued | SPICE ELECTRIC COMPANY | — |
| 09/26/2025 | Complete | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 12/20/2024 | Complete | GREEN APPLE ELECL SVCS LL | General Wiring |
| 12/17/2024 | Complete | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 09/30/2024 | Pending Payment | ALLAN BRITEWAY ELECTRICAL | General Wiring |
| 09/06/2024 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 07/30/2024 | Complete | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 06/09/2024 | Complete | NETWORK ONE ELECL CONTNG | General Wiring |
| 05/07/2024 | Complete | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 01/19/2024 | Complete | SCHLESINGER ELECT'L CONTR | General Wiring |
| 12/22/2023 | Permit Issued | HARLEY ELECTRIC CO., INC. | General Wiring |
| 12/06/2023 | Complete | JANON ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | Permit Issued | BHAGHIANA GENERAL CONSTRU | Scaffold |
| 01/22/2026 | Permit Issued | BHAGHIANA GENERAL CONSTRU | Fence |
| 11/21/2025 | Signed-off | BHAGHIANA GENERAL CONSTRU | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/22/2025 | Permit Issued | CANNON MECHANICAL INC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | BLUE TECH CONST. NY, CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/07/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/04/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/29/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/22/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/22/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/17/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/17/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/16/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/17/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/14/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/29/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/23/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/07/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/03/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/19/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/06/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/15/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/02/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Post-installed Anchors | JONATHAN CRUICKSHANKS | special |
| 07/08/2026 | Post-installed Anchors | JONATHAN CRUICKSHANKS | special |
| 03/03/2026 | HVAC-R and service water heating equipment | AILANTO DANIEL MINAWI | energy_progress |
| 03/03/2026 | Fire-Resistant Penetrations and Joints | AILANTO DANIEL MINAWI | special |
| 03/02/2026 | Final | AILANTO DANIEL MINAWI | progress |
| 03/02/2026 | Energy Code Compliance Inspections | AILANTO DANIEL MINAWI | progress |
| 03/02/2026 | Mechanical Systems | AILANTO DANIEL MINAWI | special |
| 03/02/2026 | Tenant Protection Plan Compliance | AILANTO DANIEL MINAWI | special |
| 03/02/2026 | Maintenance information | AILANTO DANIEL MINAWI | energy_progress |
| 03/02/2026 | HVAC-R and service water piping design and insulation | AILANTO DANIEL MINAWI | energy_progress |
| 01/07/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 01/07/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 01/07/2026 | Interior lighting power | Young Suh | energy_progress |
| 01/07/2026 | Fire-Resistance Rated Construction | Young Suh | progress |
| 01/07/2026 | Tenant Protection Plan Compliance | Young Suh | special |
| 01/07/2026 | Final | Young Suh | progress |
| 12/18/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 12/18/2025 | Tenant Protection Plan Compliance | Young Suh | special |
| 12/18/2025 | Final | JAMES MONAHAN | progress |
| 10/10/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 10/10/2025 | Final | JAMES MONAHAN | progress |
| 10/10/2025 | Tenant Protection Plan Compliance | Young Suh | special |
| 09/19/2025 | Masonry | Young Suh | special |
| 09/19/2025 | Tenant Protection Plan Compliance | Young Suh | special |
| 09/19/2025 | Final | WILLIAM DAVIS | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Quest Diagnostics | Medical / Healthcare | Floor 1 | Project M01366312 |
| NYP Guest Facility The Helmsley Medical Tower | Medical / Healthcare | Floor 8 | Project M01011306 |
| NewYork-Presbyterian | Medical / Healthcare | Floors 2, 3 | Project M00910501 Project M08016941 |
| The Rogosin Institute | Medical / Healthcare | Floor 2 | Project M08016950 Project M00721859 Project M00734952 Project M00650967 Project M00651252 |