1960Year Built
2Stories
B1Building Class
R6Zoning
1,890 sfGross Floor Area
2Units
Rent Stabilized0 Active Violations
Two family brick · 2,247 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Unit 2U14p · 2 filings · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
Site & exterior8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2 by 4 Architecture510/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A Interior Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Dynamic ConstructionGeneral Contractor303/21/2026
Arista Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
2 by 4 Architecture4737510/04/2022
Building Lifecycle
11/29/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
02/17/2023
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON CEL, 1ST AND 2ND FLOOR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. GENERAL CONSTRUCTION WORK WAS FILED UNDER JOB#Q00653477.
Q00653480-I1
11/18/2022
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
10/19/2022
Signed off — Alteration
INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. PLUMBING WORK FILE UNDER SEPARATE APPLICATION.
Q00653477-I1
10/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WANG LEE
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offArista Plumbing & Heating02/24/2022
DOB NOWGeneral ConstructionSigned-offNY Dynamic Construction01/16/2022
1 project · most recent 03/30/2022
General Wiring
FiledStatusContractorScope
03/30/2022CompleteAlto ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/07/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/05/2022HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
10/05/2022Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
10/05/2022Energy Code Compliance InspectionsCHI WANG LEEprogress
10/05/2022HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
10/05/2022HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
09/12/2022HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
09/12/2022Energy Code Compliance InspectionsCHI WANG LEEprogress
09/12/2022Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
09/12/2022HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
09/12/2022HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
08/19/2022HVAC-R and service water piping design and insulationCHI WANG LEEenergy_progress
08/19/2022Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
08/19/2022Energy Code Compliance InspectionsCHI WANG LEEprogress
08/19/2022HVAC-R and service water heating system controlsCHI WANG LEEenergy_progress
08/19/2022HVAC-R and service water heating equipmentCHI WANG LEEenergy_progress
06/15/2022Fire-Resistant Penetrations and JointsCHI WANG LEEspecial
06/15/2022Fire-Resistance Rated ConstructionCHI WANG LEEprogress
06/15/2022Energy Code Compliance InspectionsCHI WANG LEEprogress
06/15/2022Air barrier - visual inspectionCHI WANG LEEenergy_progress
06/15/2022Interior lighting powerCHI WANG LEEenergy_progress
06/15/2022Fenestration air leakageCHI WANG LEEenergy_progress
06/15/2022Fenestration and door U-factor and product ratingsCHI WANG LEEenergy_progress
06/15/2022Fenestration areasCHI WANG LEEenergy_progress
06/06/2022Air barrier - visual inspectionCHI WANG LEEenergy_progress
06/06/2022Fenestration areasCHI WANG LEEenergy_progress
Latest 25 of 31.