| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00820025 ↗ | 61-41 LINDEN STREET QUEENS | Alteration | Signed-off | 01/31/2023 | 02/20/2024 | Owner 25 crescent property LLC Contractor KLE CONSTRUCTION INC | APPLICATION FILED FOR INTERIOR RENOVATION AT CELLAR, 1ST AND 2ND FLOOR AT EXISTING 2 FAMILY DWELLING AS PER PLAN. REMOVE NON-LOAD BEARING PA… |
| Q00578381 ↗ | 68-29 SPRINGFIELD BLVD QUEENS | Alteration CO | Permit Issued | 08/27/2021 | 12/21/2023 | Design THOMAS C. TUNG, P.E. Contractor WXF INC | PROPOSED VERTICAL ENLARGEMENT AT CELLAR. 1ST THRU 2ND FLOOR, ATTIC AND ROOF. PROPOSED CONSTRUCTION WORKS TO CONVERT A ONE FAMILY TO A TWO FA… |
| Q00909526 ↗ | 12-33 ESTATES LANE | Alteration | Signed-off | 08/02/2023 | 08/08/2023 | Design 2 BY 4 ARCHITECTURE PC Contractor STM IMPROVEMENT | Interior renovation of the existing 2nd floor apartment. Work include remove of non-load bearing partition and install new wood flooring. No… |
| B07995421 ↗ | 6517 11 AVENUE BROOKLYN | Alteration | Signed-off | 11/02/2022 | 06/27/2023 | Design 2 BY 4 ARCHITECTURE PC Owner ART WINDOW LLC Contractor A-G HOME IMPROVEMENT CORP | INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING ON 1ST FLOOR STORE & CELLAR. INSTALL BUSINESS AWNING. NO CHANGE IN USE, OCC… |
| Q00863516 ↗ | 36-25 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 04/22/2023 | 05/22/2023 | Design 2 BY 4 ARCHITECTURE PC Owner 304-310 W. 14 REALTY LLC Contractor LEE & COMPANY OF NY, INC | Interior renovation of existing Unit L1 & 2. Removing non-load bearing partitions and doors, Install new flooring. No change in use, egress … |
| B08039771 ↗ | 6517 11 AVENUE BROOKLYN | Alteration | Signed-off | 04/06/2023 | 05/08/2023 | Design 2 BY 4 ARCHITECTURE PC Owner ART WINDOW LLC Contractor WASOFF PLBG & UTILITY CO | SUBMIT BOILER WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. |
| Name | Projects together | Most recent |
|---|---|---|
| 2 BY 4 ARCHITECTURE PC | 29 | 03/06/2025 |
| FLUSHING ENGINEERING SERVICE PC | 3 | 06/25/2023 |
| MARIANNE MADIGAN | 2 | 03/23/2022 |
| THOMAS C. TUNG, P.E. | 2 | 03/06/2025 |
| KOH HO LEE CONSULTING ENGINEER | 1 | 09/26/2020 |
| LAUREN WEGEL ARCHITECT | 1 | 06/16/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| MPS PLUMBING & HEATING IN | 5 | 08/01/2022 |
| TRI STATE PLBG & HTG INC | 3 | 09/23/2021 |
| CK COOLING & HEATING INC | 2 | 10/20/2020 |
| CYC GENERAL CONTRACTING | 2 | 06/25/2023 |
| STM IMPROVEMENT | 2 | 08/08/2023 |
| WASOFF PLBG & UTILITY CO | 2 | 07/21/2023 |
| WXF INC | 2 | 03/06/2025 |
| A-G HOME IMPROVEMENT CORP | 1 | 08/11/2023 |
| ARISTA PLBG & HTG CORP | 1 | 10/04/2022 |
| ARK-POL PLUMBING CORP | 1 | 06/04/2020 |
| CATMAN PLUMBING INC | 1 | 09/26/2020 |
| CROSSFIELD P & H CORP | 1 | 08/08/2023 |
| FLUSHING PLUMBING CORP | 1 | 09/16/2021 |
| G.P. MECHANICAL CORP | 1 | 06/16/2022 |
| GALICJA PLBG AND HTG.CORP | 1 | 03/23/2022 |
| JM CONSTRUCTION GROUP COR | 1 | 09/02/2020 |
| KLE CONSTRUCTION INC | 1 | 06/25/2023 |
| LEE & COMPANY OF NY, INC | 1 | 07/07/2023 |
| NY DYNAMIC CONSTRUCTION C | 1 | 06/13/2022 |
| ORIEL PLUMBING & SWR CORP | 1 | 08/22/2019 |
| P.S.I. MECHANICAL | 1 | 07/28/2021 |
| Q&F CONSTRUCTION INC | 1 | 11/09/2022 |
| QMB PLUMBING & HEATING IN | 1 | 03/17/2020 |
| ROCK E SMALL PLBG&HTG INC | 1 | 03/03/2023 |
| SO PLUMBING & HEATING INC | 1 | 10/20/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| ART WINDOW LLC | 3 | 08/11/2023 |
| 248 PLAZA LLC | 2 | 10/20/2020 |
| BOTANICAL LANDSCAPE INC. | 2 | 10/04/2022 |
| HUBB NYC PROPERTIES LLC | 2 | 07/28/2021 |
| JORDAN COOPER LLC | 2 | 03/03/2023 |
| ZHU & SONS LLC | 2 | 07/21/2022 |
| 25 crescent property LLC | 1 | 06/25/2023 |
| 304-310 W. 14 REALTY LLC | 1 | 07/07/2023 |
| BELL PARK GARDENS | 1 | 09/16/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| K & A INTERIOR DESIGN INC | 11 | 03/06/2025 |
| FANGZHENGCON | 1 | 11/09/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00820025 ↗ | 61-41 LINDEN STREET QUEENS | Alteration | Signed-off | 01/31/2023 | 02/20/2024 | Owner 25 crescent property LLC Contractor KLE CONSTRUCTION INC | APPLICATION FILED FOR INTERIOR RENOVATION AT CELLAR, 1ST AND 2ND FLOOR AT EXISTING 2 FAMILY DWELLING AS PER PLAN. REMOVE NON-LOAD BEARING PA… |
| Q00578381 ↗ | 68-29 SPRINGFIELD BLVD QUEENS | Alteration CO | Permit Issued | 08/27/2021 | 12/21/2023 | Design THOMAS C. TUNG, P.E. Contractor WXF INC | PROPOSED VERTICAL ENLARGEMENT AT CELLAR. 1ST THRU 2ND FLOOR, ATTIC AND ROOF. PROPOSED CONSTRUCTION WORKS TO CONVERT A ONE FAMILY TO A TWO FA… |
| Q00909526 ↗ | 12-33 ESTATES LANE | Alteration | Signed-off | 08/02/2023 | 08/08/2023 | Design 2 BY 4 ARCHITECTURE PC Contractor STM IMPROVEMENT | Interior renovation of the existing 2nd floor apartment. Work include remove of non-load bearing partition and install new wood flooring. No… |
| B07995421 ↗ | 6517 11 AVENUE BROOKLYN | Alteration | Signed-off | 11/02/2022 | 06/27/2023 | Design 2 BY 4 ARCHITECTURE PC Owner ART WINDOW LLC Contractor A-G HOME IMPROVEMENT CORP | INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING ON 1ST FLOOR STORE & CELLAR. INSTALL BUSINESS AWNING. NO CHANGE IN USE, OCC… |
| Q00863516 ↗ | 36-25 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 04/22/2023 | 05/22/2023 | Design 2 BY 4 ARCHITECTURE PC Owner 304-310 W. 14 REALTY LLC Contractor LEE & COMPANY OF NY, INC | Interior renovation of existing Unit L1 & 2. Removing non-load bearing partitions and doors, Install new flooring. No change in use, egress … |
| B08039771 ↗ | 6517 11 AVENUE BROOKLYN | Alteration | Signed-off | 04/06/2023 | 05/08/2023 | Design 2 BY 4 ARCHITECTURE PC Owner ART WINDOW LLC Contractor WASOFF PLBG & UTILITY CO | SUBMIT BOILER WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. |
| B07995423 ↗ | 6517 11 AVENUE BROOKLYN | Alteration | Signed-off | 11/17/2022 | 04/28/2023 | Design 2 BY 4 ARCHITECTURE PC Owner ART WINDOW LLC Contractor WASOFF PLBG & UTILITY CO | PROPOSED PLUMBING WORK ON CELLAR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. |
| M00803182 ↗ | 147 SULLIVAN STREET MANHATTAN | Alteration | Signed-off | 01/03/2023 | 01/19/2023 | Owner JORDAN COOPER LLC Contractor CYC GENERAL CONTRACTING | INTERIOR RENOVATION IN EXISTING 1ST FLOOR COMMERCIAL SPACE (TEA ART CORP), INCLUDING MINOR PARTITION WORK, FLOORING, REPLACE LIGHTING AND PA… |
| M00803185 ↗ | 147 SULLIVAN STREET MANHATTAN | Alteration | Signed-off | 01/03/2023 | 01/18/2023 | Owner JORDAN COOPER LLC Contractor ROCK E SMALL PLBG&HTG INC | INSTALL PLUMBING FIXTURES IN CONJUNCTION WITH GC JOB# M00803182, NO GAS WORK FILED UNDER THIS APPLICATION. |
| B08036123 ↗ | 1820 BAY RIDGE PARKWAY BROOKLYN | Alteration | Signed-off | 11/09/2022 | 12/20/2022 | Design 2 BY 4 ARCHITECTURE PC Contractor Q&F CONSTRUCTION INC Filer FANGZHENGCON | PROPOSED MECHANICAL WORK FOR INSTALLING SPLIT AC UNITS AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS. |
| B08013993 ↗ | 43 APOLLO STREET BROOKLYN | Alteration | Signed-off | 10/07/2022 | 10/24/2022 | Design 2 BY 4 ARCHITECTURE PC Contractor STM IMPROVEMENT | PROPOSED PLUMBING & GAS WORK AT CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00769330 ↗ | 68-29 SPRINGFIELD BLVD QUEENS | New Building | Permit Issued | 07/14/2022 | 09/15/2022 | Design THOMAS C. TUNG, P.E. Contractor WZ CONSULTING CORP | NEW DETACHED ONE-STORY ONE CAR GARAGE. OBTAIN CERTIFICATE OF OCCUPANCY |
| Q00752175 ↗ | 68-29 SPRINGFIELD BLVD QUEENS | Alteration | Signed-off | 07/08/2022 | 07/12/2022 | Design 2 BY 4 ARCHITECTURE PC Contractor WXF INC | INTERIOR RENOVATION ON 1ST AND 2ND FLOORS, ATTIC AND OSP, INSTALL SPLIT AC UNITS AS PER PLAN IN CONJUNCTION WITH A1 JOB# Q00578381. |
| Q00746678 ↗ | 112-02 ROOSEVELT AVENUE QUEENS | Alteration CO | Filed — no permit on record | 07/07/2022 | — | Design 2 BY 4 ARCHITECTURE PC Owner ZHU & SONS LLC | — |
| Q00615373 ↗ | 112-02 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 10/28/2021 | 05/04/2022 | Design 2 BY 4 ARCHITECTURE PC Owner ZHU & SONS LLC Contractor YX CONSTRUCTION INC | INTERIOR RENOVATION OF EXISTING CEL, 1ST FLOOR AND ROOF, WORK INCLUDE INSTALLING A NEW STAIRCASE AND RELOCATE BATHROOM, REMOVE EXISTING COMM… |
| Q00611405 ↗ | 68-29 SPRINGFIELD BLVD QUEENS | Alteration | Signed-off | 02/10/2022 | 04/15/2022 | Design 2 BY 4 ARCHITECTURE PC Contractor MPS PLUMBING & HEATING IN | PROPOSED GAS AND PLUMBING WORK ON CEL, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK WAS FILED UNDER JOB# Q00578381. |
| Q00653480 ↗ | 133-22 BLOSSOM AVENUE QUEENS | Alteration | Signed-off | 01/10/2022 | 02/24/2022 | Design 2 BY 4 ARCHITECTURE PC Owner BOTANICAL LANDSCAPE INC. Contractor ARISTA PLBG & HTG CORP | PROPOSED GAS AND PLUMBING WORK ON CEL, 1ST AND 2ND FLOOR. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION… |
| Q00653477 ↗ | 133-22 BLOSSOM AVENUE QUEENS | Alteration | Signed-off | 01/06/2022 | 01/16/2022 | Design 2 BY 4 ARCHITECTURE PC Owner BOTANICAL LANDSCAPE INC. Contractor NY DYNAMIC CONSTRUCTION C | INTERIOR RENOVATION WITH REPAIRING PARTITION, FLOORING, CEILING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UN… |
| B00310731 ↗ | 700 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 02/27/2020 | 11/01/2021 | Design LAUREN WEGEL ARCHITECT Contractor G.P. MECHANICAL CORP | APPLICATION TO INSTALL (1)NEW TUB, RELOCATE (3) LAV,(2) WC, (1) SHOWER, (1) TUB, (1) WASHER, AND REPLACE (1) KITCHEN SINK, (1) D/W. |
| Q00489168 ↗ | 67-02 SPRINGFIELD BLVD QUEENS | Alteration | Signed-off | 06/15/2021 | 07/21/2021 | Design 2 BY 4 ARCHITECTURE PC Owner BELL PARK GARDENS Contractor FLUSHING PLUMBING CORP | FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 440659850. REMOVE 1 TUB, RELOCATE 1 WASHER, INSTALL 1 SHOWER ON 1ST FLOOR APT.1. |
| Q00461016 ↗ | 85-03 55 AVENUE QUEENS | Alteration | Signed-off | 04/02/2021 | 06/29/2021 | Design 2 BY 4 ARCHITECTURE PC Contractor DW PLUMBING INC | REMOVE 1 OIL TANK, 1 BOILER, 1 H.W.H, 2 TUB; RELOCATE 1 STOVE, 1 SINK, 1 W.C, 1 LAV; REPLACE 1 W.C, 1 LAV; INSTALL 2 BOILER, 2 H.W.H, 1 DRYE… |
| M00369529 ↗ | 300 EAST 4 STREET MANHATTAN | Alteration | Signed-off | 07/15/2020 | 06/09/2021 | Design MARIANNE MADIGAN Contractor GALICJA PLBG AND HTG.CORP | APPLICATION TO REPLACE (1) GAS STOVE, (1) SHOWER/TUB. (1) LAV AND RELOCATE (1) KIT SINK, (1) WC, (1) DW. |
| Q00478533 ↗ | 34-26 72 STREET QUEENS | Alteration | Signed-off | 03/25/2021 | 04/28/2021 | Design 2 BY 4 ARCHITECTURE PC Contractor MPS PLUMBING & HEATING IN | FILE PLUMBING WORK TYPE IN CONJUNCTION WITH BIS JOB# 440607648, PLUMBING WORK ON CEL, 001, 002 AND ATT. TO REMOVE VIOLATION# 34180457M AND #… |
| B00414554 ↗ | 3806 AVENUE R BROOKLYN | Alteration | Signed-off | 10/16/2020 | 04/16/2021 | Design 2 BY 4 ARCHITECTURE PC Contractor DW PLUMBING INC | FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 340777029, REPLACE 1 BOILER, 1 H.W.H ; RELOCATE 1 STOVE, 1 GAS METER, 2 W.C, 2 LAV, 1 SINK, … |
| Q00360788 ↗ | 156-06 65 AVENUE QUEENS | Alteration | Signed-off | 08/05/2020 | 11/04/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor MPS PLUMBING & HEATING IN | FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 440598765. |
| Q00222931 ↗ | 43-08 MAIN STREET QUEENS | Alteration | Signed-off | 09/10/2019 | 11/02/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor CK COOLING HEATING | LEGALIZATION OF REPLACE HVAC CONDENSER UNIT ON THE ROOF FOR 3RD FLOOR, EXISTING DUCT WORK TO REMAIN. NO CHANGE IN USE, OCCUPANCY AND EGRESS… |
| Q00240728 ↗ | 43-09 165TH STREET QUEENS | Alteration | Signed-off | 10/08/2019 | 11/02/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor MPS PLUMBING & HEATING IN | install 3pc bathroom in basement in conjunction with bis job# 421911676. |
| M00390917 ↗ | 452 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 09/02/2020 | 10/31/2020 | Design 2 BY 4 ARCHITECTURE PC Owner HUBB NYC PROPERTIES LLC Contractor JM CONSTRUCTION GROUP COR | FILING MECHANICAL WORK TYPE IN CONJUNCTION WITH JOB# 123797187 AND M00309505, INSTALL KITCHEN HOOD CONNECT TO EXISTING EXHAUST DUCT (FILED U… |
| B00398687 ↗ | 913 78 STREET BROOKLYN | Alteration | Signed-off | 09/26/2020 | 10/07/2020 | Contractor CATMAN PLUMBING INC | Remove (1) H.W.H., (1) Boiler and (1) 2-pc bathroom & Install (2) H.W.H.,(2) Boiler,(1) floor drain,(1) 3-pc bathroom and (1) new gas meter … |
| M00352397 ↗ | 49 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/04/2020 | 09/15/2020 | Design MARIANNE MADIGAN Contractor ARK-POL PLUMBING CORP | APPLICATION TO REMOVE EXISTING PLUMBING FIXTURES AND TO INSTALL NEW PLUMBING FIXTURES. RELATED ALTERATION 2 OT JOB NUMBER IS 140905974. |
| Q00393488 ↗ | 94-31 53 AVENUE QUEENS | Alteration | Signed-off | 09/01/2020 | 09/04/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor MPS PLUMBING & HEATING IN | FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 440621230. REPLACE 1 W.C, 1 LAV AND 1 SINK ON EXISTING ROUGH-IN ON 1ST FLOOR UNIT 1. |
| M00309505 ↗ | 452 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2020 | 07/20/2020 | Design 2 BY 4 ARCHITECTURE PC Owner HUBB NYC PROPERTIES LLC Contractor P.S.I. MECHANICAL | FILE PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 123797187. |
| S00317077 ↗ | 414 PENDALE STREET STATEN ISLAND | Alteration | Signed-off | 02/21/2020 | 07/07/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor DW PLUMBING INC | filed in conjunction with job#540172445.Remove 1 washer 1 dryer 1 sink replace 1 HVAC in cel.Remove 1 tub replace 1 w.c 1 Lav Install 1 sho… |
| Q00307127 ↗ | 248-12 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 01/31/2020 | 07/02/2020 | Design 2 BY 4 ARCHITECTURE PC Owner 248 PLAZA LLC Contractor CK COOLING HEATING | REPLACE FLEXIBLE DUCT AND CEILING DIFFUSER, EXISTING HVAC UNITS AND MAIN DUCT TO REMAIN WITH NO CHANGES. THIS APPLICATION FILED IN CONJUNCTI… |
| Q00282657 ↗ | 248-12 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 12/16/2019 | 06/10/2020 | Design 2 BY 4 ARCHITECTURE PC Owner 248 PLAZA LLC Contractor NICHOLAS SUIDA | REMOVE:1 SINK,1 ICE MAKER,2 W.C,2 LAV,1 G.T.1 STOVE,1 DEEP FLYER,1 OVEN,1 H.W.H. GAS PIPE. RELOCATE:6 SINK, 1 LAV AND 1 W.C. INSTALL 1 LAV, … |
| B00280977 ↗ | 543 72 STREET BROOKLYN | Alteration | Signed-off | 12/17/2019 | 01/31/2020 | Design 2 BY 4 ARCHITECTURE PC Contractor QMB PLUMBING & HEATING INC | FILED PLUMBING WORK IN CONJUNCTION WITH BIS JOB# 322017232. |
| B00204909 ↗ | 177 BAY 44 STREET BROOKLYN | Alteration | Signed-off | 08/22/2019 | 09/16/2019 | Contractor LG ELITE PLUMBING INC | PROPOSED PLUMBING WORK ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00584854 | 68-29 SPRINGFIELD BLVD QUEENS | New Building | Filed — no permit on record | — | — | Design 2 BY 4 ARCHITECTURE PC | — |
| Building | Filings | Most Recent |
|---|---|---|
| 68-29 SPRINGFIELD BLVD ↗ | 9 | 03/06/2025 |
| 68-29 SPRINGFIELD BLVD ↗ | 2 | 05/22/2024 |
| 6517 11 AVENUE ↗ | 6 | 08/11/2023 |
| 43 APOLLO STREET ↗ | 4 | 08/08/2023 |
| 12-33 ESTATES LANE ↗ | 1 | 08/02/2023 |
| 36-25 PARSONS BOULEVARD ↗ | 2 | 07/07/2023 |
| 61-41 LINDEN STREET ↗ | 3 | 06/25/2023 |
| 147 SULLIVAN STREET ↗ | 3 | 03/03/2023 |
| 1820 BAY RIDGE PARKWAY ↗ | 1 | 11/09/2022 |
| 133-22 BLOSSOM AVENUE ↗ | 5 | 10/04/2022 |
| 112-02 ROOSEVELT AVENUE ↗ | 4 | 07/21/2022 |
| 700 PACIFIC STREET ↗ | 3 | 06/16/2022 |
| 300 EAST 4 STREET ↗ | 4 | 03/23/2022 |
| 34-26 72 STREET ↗ | 3 | 01/28/2022 |
| 85-03 55 AVENUE ↗ | 3 | 09/23/2021 |
| 67-02 SPRINGFIELD BLVD ↗ | 2 | 09/16/2021 |
| 452 AMSTERDAM AVENUE ↗ | 4 | 07/28/2021 |
| 3806 AVENUE R ↗ | 4 | 07/08/2021 |
| 156-06 65 AVENUE ↗ | 2 | 11/09/2020 |
| 248-12 NORTHERN BOULEVARD ↗ | 5 | 10/20/2020 |
| 414 PENDALE STREET ↗ | 2 | 09/26/2020 |
| 913 78 STREET ↗ | 1 | 09/26/2020 |
| 94-31 53 AVENUE ↗ | 1 | 09/01/2020 |
| 49 5 AVENUE ↗ | 1 | 06/04/2020 |
| 543 72 STREET ↗ | 2 | 03/17/2020 |
| 43-09 165TH STREET ↗ | 1 | 10/08/2019 |
| 43-08 MAIN STREET ↗ | 1 | 09/10/2019 |
| 177 BAY 44 STREET ↗ | 1 | 08/22/2019 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 03/05/2025 | Concrete - Cast-In-Place | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 03/05/2025 | Fire-Resistant Penetrations and Joints | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 03/05/2025 | Masonry | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 03/05/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 68-29 SPRINGFIELD BLVD | SOORJBALLY HARILALL | special |
| 03/05/2025 | Structural Stability – Alterations of existing buildings | 68-29 SPRINGFIELD BLVD | KY FU | special |
| 03/05/2025 | Subgrade Inspections | 68-29 SPRINGFIELD BLVD | Yanqi Ding | special |
| 03/05/2025 | Subsurface Investigations (Borings/Test Pits) | 68-29 SPRINGFIELD BLVD | Soorjbally Harilall | special |
| 03/05/2025 | Energy Code Compliance Inspections | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 03/05/2025 | Fire-Resistance Rated Construction | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 03/05/2025 | Lighting controls | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Fenestration areas | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Insulation placement and R values | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Interior lighting power | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Fenestration air leakage | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Air barrier - visual inspection | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 03/05/2025 | Fenestration and door U-factor and product ratings | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 05/30/2024 | Fire-Resistant Penetrations and Joints | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 05/30/2024 | Concrete - Cast-In-Place | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 05/30/2024 | Masonry | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 05/30/2024 | Energy Code Compliance Inspections | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 05/30/2024 | Final | 68-29 SPRINGFIELD BLVD | De Gao | progress |
| 05/30/2024 | Footing and Foundation | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 05/30/2024 | Interior lighting power | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 08/13/2023 | Fire-Resistant Penetrations and Joints | 6517 11 AVENUE | CHI WANG LEE | special |
| 08/13/2023 | Energy Code Compliance Inspections | 6517 11 AVENUE | CHI WANG LEE | progress |
| 08/13/2023 | Fire-Resistance Rated Construction | 6517 11 AVENUE | CHI WANG LEE | progress |
| 08/13/2023 | Interior lighting power | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 08/09/2023 | Fire-Resistant Penetrations and Joints | 43 APOLLO STREET | CHI WANG LEE | special |
| 08/04/2023 | Fire-Resistant Penetrations and Joints | 43 APOLLO STREET | CHI WANG LEE | special |
| 08/02/2023 | Interior lighting power | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | energy_progress |
| 08/02/2023 | Footing and Foundation | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 08/02/2023 | Final | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 08/02/2023 | Energy Code Compliance Inspections | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | progress |
| 08/02/2023 | Masonry | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 08/02/2023 | Fire-Resistant Penetrations and Joints | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 08/02/2023 | Concrete - Cast-In-Place | 68-29 SPRINGFIELD BLVD | CHI WANG LEE | special |
| 07/25/2023 | Fire-Resistant Penetrations and Joints | 12-33 ESTATES LANE | CHI WANG LEE | special |
| 07/25/2023 | Final | 12-33 ESTATES LANE | CHI WANG LEE | progress |
| 07/22/2023 | HVAC-R and service water heating equipment | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/22/2023 | HVAC-R and service water heating system controls | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/22/2023 | HVAC-R and service water piping design and insulation | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/22/2023 | Energy Code Compliance Inspections | 6517 11 AVENUE | CHI WANG LEE | progress |
| 07/22/2023 | Maintenance information | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/22/2023 | Fire-Resistant Penetrations and Joints | 6517 11 AVENUE | CHI WANG LEE | special |
| 07/20/2023 | HVAC-R and service water piping design and insulation | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/20/2023 | HVAC-R and service water heating equipment | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/20/2023 | Maintenance information | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/20/2023 | HVAC-R and service water heating system controls | 6517 11 AVENUE | CHI WANG LEE | energy_progress |
| 07/20/2023 | Energy Code Compliance Inspections | 6517 11 AVENUE | CHI WANG LEE | progress |
| 07/20/2023 | Fire-Resistant Penetrations and Joints | 6517 11 AVENUE | CHI WANG LEE | special |