Public elementary, junior or senior high
Redwood Middle School
133-25 GUY R BREWER BLVD · BIN 4270059
💬 Discuss this project
1966Year Built
4Stories
W1Building Class
R6Zoning
304,128 sfGross Floor Area
0Units
LL97 Covered35 Open Violations 4 unresolved · 31 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 161,277 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 1Under Construction37p · 5 filings · 20 docs
Cellar7p · 3 filings · 20 docs
Sub-Basement4p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2207/08/2026
NYC SCHOOL CONSTRUCTION604/09/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION1103/22/2026
DEPT OF ED Q072203/22/2026
DOE 040703/22/2026
DEPT OF EDUCATION JHS72203/22/2026
D.O.E. JHS72 0103/22/2026
DEPT OF ED,PS 72103/22/2026
NYC PARKS 8103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC803/21/2026
HERITAGE ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE CONST SERVICES LLCGeneral Contractor607/08/2026
CEDOMIR MARAElectrical303/21/2026
BOYD MECHANICAL LLCPlumbing307/08/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
PRINCE ELECTRIC CORP.Electrical103/22/2026
SHAHEEN CONSTRUCTION CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351308/14/2026
UNIVERSAL TESTING AND INS400912/03/2025
Building Lifecycle
All (135)Filed (19)Permit Issued (8)Violation (60)Objection (18)Special Inspection (30)
08/19/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/19/2026
Special inspection requirement — Final
Asma Hashmi
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/19/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/19/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/14/2026
Filed — Alteration
INSTALLATION OF SUPPLEMENTAL AIR CONDITIONING IN THE AUDITORIUM, CAFETERIA, GYMNASIUM, AND GIRLS LOCKER ROOM.
Q01318313-P1
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/12/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
08/12/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/12/2026
Special inspection requirement — Final
Asma Hashmi
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
08/12/2026
Special inspection requirement — Maintenance information
Asma Hashmi
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
03/02/2026
Permit issued — General Construction
Q01118397-I1-GC
12/05/2025
Special inspection requirement — Lighting controls
12/05/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
12/05/2025
Special inspection requirement — Interior lighting power
12/05/2025
Special inspection requirement — Maintenance information
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/05/2025
Special inspection requirement — Post-installed Anchors
12/03/2025
Filed — Alteration
AUDITORIUM UPGRADE INCLUDING SEATING REPLACEMENT AND INDUCTION LOOP INSTALLATION.
Q01118397-P1
12/03/2025
Filed — Alteration
ROOM CONVERSION OF CLASSROOM / BAND ROOM 103 INCLUDING ROOM FINISHES REPLACEMENT AND MEDIA EQUIPEMENT INSTALLATION.
Q01118441-P1
12/02/2025
Special inspection requirement — Post-installed Anchors
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
12/02/2025
Special inspection requirement — Interior lighting power
12/02/2025
Special inspection requirement — Maintenance information
11/17/2025
Filed — Alteration
INSTALLATION OF SUPPLEMENTAL AIR CONDITIONING IN THE AUDITORIUM, CAFETERIA, GYMNASIUM, AND GIRLS LOCKER ROOM.
Q01318313-I1
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, closed)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/22/2025
Violation issued (ECB, open)
Construction
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
10/15/2025
Violation issued (FDNY_ORDER, closed)
09/30/2025
Permit issued — Plumbing
Q00603073-I1-PL
06/17/2025
Violation issued (FDNY_NOV, closed)
02/20/2025
Violation issued (FDNY_NOV, closed)
12/02/2024
Objection resolved — Addressed
10/18/2024
Violation issued (ECB, open)
Elevators
10/10/2024
Objection raised — Other
10/04/2024
Filed — Alteration
AUDITORIUM UPGRADE INCLUDING SEATING REPLACEMENT AND INDUCTION LOOP INSTALLATION.
Q01118397-I1
10/04/2024
Filed — Alteration
ROOM CONVERSION OF CLASSROOM / BAND ROOM 103 INCLUDING ROOM FINISHES REPLACEMENT AND MEDIA EQUIPEMENT INSTALLATION.
Q01118441-I1
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSHAHEEN CONSTRUCTION CORP03/02/2026
DOB NOWPlumbingPermit IssuedBOYD MECHANICAL LLC09/30/2025
DOB NOWPlumbingPermit IssuedBOYD MECHANICAL LLC11/03/2023
DOB NOWConstruction FencePermit IssuedCUBE CONST SERVICES LLC06/14/2023
DOB NOWConstruction FencePermit IssuedCUBE CONST SERVICES LLC06/14/2023
DOB NOWPlumbingPermit IssuedBOYD MECHANICAL LLC10/14/2022
DOB NOWConstruction FencePermit IssuedCUBE CONST SERVICES LLC06/08/2022
DOB NOWConstruction FencePermit IssuedCUBE CONST SERVICES LLC07/12/2021
BISOTISSUEDNIKHI CONTRACTING CORP03/26/2024
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/08/2024
BISPLISSUEDFORSYTHE P&H CORP10/13/2023
BISOTISSUEDNIKHI CONTRACTING CORP04/19/2023
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/16/2023
BISOTISSUEDNIKHI CONTRACTING CORP10/11/2022
BISPLISSUEDFORSYTHE P&H CORP10/07/2022
BISOTISSUEDCUBE CONST SERVICES LLC06/15/2022
BISOTISSUEDCUBE CONST SERVICES LLC06/15/2022
BISOTISSUEDCUBE CONST SERVICES LLC06/14/2022
BISOTISSUEDCUBE CONST SERVICES LLC06/14/2022
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/28/2022
BISOTISSUEDADAM'S EUROPEAN CONTRACTING11/29/2021
BISOTISSUEDCUBE CONST SERVICES LLC07/19/2021
BISOTISSUEDCUBE CONST SERVICES LLC07/19/2021
BISOTISSUEDCUBE CONST SERVICES LLC07/19/2021
BISPLISSUEDFORSYTHE P&H CORP02/11/2021
BISOTISSUEDNIKHI CONTRACTING CORP06/16/2020
BISPLISSUEDFORSYTHE P&H CORP01/17/2020
BISOTISSUEDNIKHI CONTRACTING CORP05/29/2019
BISPLISSUEDFORSYTHE P&H CORP12/04/2018
BISOTISSUEDNIKHI CONTRACTING CORP12/04/2018
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/22/2018
BISOTISSUEDMAJOR CONTRACTING INC10/20/2017
BISPLISSUEDDO RITE MECHANICAL CORP08/07/2017
BISOTISSUEDMAJOR CONTRACTING INC08/07/2017
BISOTISSUEDEMPIRE CONTROL ABATEMENT07/21/2017
BISPLISSUEDVARSITY PLBG AND HTG INC05/02/2017
BISPLISSUEDVARSITY PLBG AND HTG INC05/02/2017
BISOTISSUEDEMPIRE CONTROL ABATEMENT07/08/2016
BISOTISSUEDEMPIRE CONTROL ABATEMENT05/12/2016
BISPLISSUEDVARSITY PLBG AND HTG INC05/12/2016
+ 18 more permits on file
2 projects · most recent 08/14/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026——Air Conditioning Systems
Cooling
Fujitsu FUJITSU ASUA36TLAV2 34,000 BTU · Vrf Indoor ×25
FUJITSU ABUA36TLAV2 36,000 BTU · Fan Coil Indoor ×10
AOU96RLAVL 96,000 BTU · Condensing Unit ×10
AOU120RLAVL 120,000 BTU · Condensing Unit ×2
FUJITSU ASUA30TLAV2 30,000 BTU · Vrf Indoor ×4
FUJITSU AOU120RLAVL 120,000 BTU · Condensing Unit ×1
FUJITSU ASUA24TLAV1 24,000 BTU · Fan Coil Indoor ×2
FUJITSU AUUB48TLAV2 48,000 BTU · Vrf Indoor ×4
FUJITSU AUUB36TLAV2 34,000 BTU · Vrf Indoor ×1
01/21/2022——Heating Systems, Ventilation Systems
Heating
Webster JBS2G-S50 5,830 BTU · Boiler ×3
1 project · most recent 01/21/2022
Gas Water/Sanitary
FiledStatusContractorScope
01/21/2022——Gas, Water/Sanitary
21 projects · most recent 12/19/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
01/29/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
11/13/2024CompleteCHARAN ELEC'L ENTERP'S IN—
10/03/2024CompleteCHARAN ELEC'L ENTERP'S IN—
04/10/2024CompleteANCO ELECTL CONTCTNG INC—
04/10/2024CompleteANCO ELECTL CONTCTNG INC—
11/16/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
04/10/2023CompleteCHARAN ELEC'L ENTERP'S IN—
01/09/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
12/30/2022CompletePRINCE ELECTRIC CORP.—
09/01/2022CompleteCHARAN ELEC'L ENTERP'S IN—
07/05/2022CompleteCHARAN ELEC'L ENTERP'S IN—
10/14/2021CompleteLABCO ELETRT CONTNG CORPGeneral Wiring
07/07/2021CompleteZENA ELECTRIC INC—
05/07/2021CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 09/02/2022
Steel Concrete
FiledStatusContractorScope
09/02/2022——Steel
01/21/2022——Steel, Concrete
1 project · most recent 07/22/2021
Fence
FiledStatusContractorScope
07/22/2021Permit IssuedCUBE CONST SERVICES LLCFence
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/19/2026Maintenance informationAsma Hashmienergy_progress
08/19/2026FinalAsma Hashmiprogress
08/19/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/19/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/19/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/19/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/19/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/19/2026Post-installed AnchorsAsma Hashmispecial
08/19/2026Mechanical SystemsAsma Hashmispecial
08/12/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
08/12/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/12/2026Mechanical SystemsAsma Hashmispecial
08/12/2026Post-installed AnchorsAsma Hashmispecial
08/12/2026Energy Code Compliance InspectionsAsma Hashmiprogress
08/12/2026FinalAsma Hashmiprogress
08/12/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/12/2026Maintenance informationAsma Hashmienergy_progress
08/12/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/05/2025Lighting controls—energy_progress
12/05/2025Post-installed AnchorsNELSON LOPEZspecial
12/05/2025Interior lighting power—energy_progress
12/05/2025Maintenance information—energy_progress
12/05/2025Energy Code Compliance Inspections—progress
12/05/2025Fire-Resistant Penetrations and Joints—special
12/05/2025Post-installed Anchors—special
Latest 25 of 53.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.H.S. 72 QueensEducationFloor 1
Project Q01118397 Alteration · Permit Entire · 10/04/2024
Project Q01118441 Alteration · Approved · 10/04/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026Q00531778-I1Request digital key ↗
08/27/2026Q00531778-P1Request digital key ↗
08/27/2026Q00603073-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION11
07/20/2022421901179Open ↗
07/20/2022421901179Open ↗
06/14/2022421901179Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/08/2019440542548Open ↗
10/23/2015421227862Open ↗
10/23/2015421227862Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026Q00603073-I1Open ↗
08/26/2026Q00711691-I1Open ↗
08/21/2026Q01118397-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/02/2017421227862Open ↗
06/02/2017421227862Open ↗
11/24/2015421227862Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
05/08/2019440542548Open ↗
10/23/2015421227862Open ↗
10/23/2015421227862Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q01118397-P1Open ↗
08/29/2026Q00603073-I1Open ↗
08/25/2026Q01118397-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q00603073-I1Open ↗
08/29/2026Q00603073-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/08/2019440542548Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/23/2015421227862Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/08/2019440542548Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/19/2021421899752Open ↗
05/08/2019440542548Open ↗
10/23/2015421227862Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/08/2019440542548Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026Q01118397-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00603073-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/02/2017421227862Open ↗
11/24/2015421227862Open ↗
10/23/2015421227862Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/02/2017421227862Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/08/2019440542548Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/08/2019440542548Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
10/01/2021421899752Open ↗
10/01/2021421899752Open ↗
10/01/2021421899752Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/13/2021421899752Open ↗
05/08/2019440542548Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/19/2021421899752Open ↗
▸Approvals, Objections & Sign-offs50
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/18/2026Q01318313-P1Open ↗
08/18/2026Q01118441-P1Open ↗
08/14/2026Q01118441-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)17
08/18/2026Q01318313-P1Open ↗
08/13/2026Q01118441-P1Open ↗
08/13/2026Q00656835-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026Q01118397-I1Open ↗
08/13/2026Q00656835-I1Open ↗
08/13/2026Q00782491-S3Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/10/2022421901179Open ↗
07/13/2021421899752Open ↗
06/02/2017421227862Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
10/23/2015421227862Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/02/2017421227862Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
05/08/2019440542548Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/08/2019440542548Open ↗
06/02/2017421227862Open ↗
10/23/2015421227862Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
10/23/2015421227862Open ↗
10/23/2015421227862Open ↗
10/23/2015421227862Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/08/2019440542548Open ↗
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/13/2026Q01118441-P1Open ↗
08/13/2026Q00656835-S3Open ↗
08/13/2026Q01118397-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026Q00782491-S3Open ↗
08/13/2026Q00782491-S1Open ↗
08/13/2026Q00782491-S2Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026Q00656835-I1Open ↗