← Back
BuildNYC
Miscellaneous educational facility
133 WEST 21ST STREET
MANHATTAN · BIN 1014771
💬 Discuss this project
1911Year Built
12Stories
W9Building Class
C6-3AZoning
115,895 sfGross Floor Area
5Units
LL97 Covered2 Active Violations 1 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: No Report Filed
Miscellaneous educational facility · Owner of record: SS 133 W 21 · 9,924 sf lot · 11.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary pipe scaffold installation1 filing
RoofSchool of Visual Arts, SVA NYC NYO Animation Department9p · 8 filings · 20 docs
Floor 12School of Visual Arts1p · 3 filings · 18 docs
Floor 11School of Visual Arts1p · 1 filing · 15 docs
Floor 10School of Visual Arts2 filings · 18 docs
Floor 9
Floor 8
Floor 7School of Visual Arts8p · 2 filings · 20 docs
Floor 6SVA NYC NYO Animation Department9p · 4 filings · 18 docs
Floor 5
Floor 4School of Visual Arts1p · 1 filing · 15 docs
Floor 3School of Visual Arts1 filing · 15 docs
Floor 2School of Visual Arts2p · 2 filings · 18 docs
Floor 1School of Visual Arts1p · 2 filings · 18 docs
CellarSchool of Visual Arts1p · 3 filings · 20 docs
BasementTemporary sidewalk shed installation1p · 1 filing · 2 docs
Site & exteriorSchool of Visual Arts6 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
School of Visual Arts10507/08/2026
SS 133 West 21st9003/22/2026
First Pioneer Properties803/21/2026
Collys203/21/2026
Visual Arts Holding203/21/2026
Murray Hill Properties103/21/2026
Rties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thornton Tomasetti312/19/2025
Wellworth Consulting212/19/2025
Laurence G. Jones Architects511/06/2024
EP Engineering1809/19/2024
Paul Perdek, Prof. Engineering206/06/2024
Narinder Chhabra306/09/2022
Ashraf310/31/2020
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold607/08/2026
Creative Team Interiors IGeneral Contractor603/21/2026
Spring ScaffoldingScaffold507/08/2026
Taurino ManagementGeneral Contractor507/08/2026
SPK/Lewis ConstructionGeneral Contractor307/08/2026
General PlumbingFire Protection207/08/2026
Nicholson & GallowayGeneral Contractor203/21/2026
Structural Preserv SystemGeneral Contractor203/21/2026
General PlumbingPlumbing207/08/2026
AinsworthGeneral Contractor107/08/2026
The GrenadierGeneral Contractor104/09/2026
Prospect Electric ServiceElectrical103/22/2026
Top Shelf ElectricElectrical103/21/2026
Access PlumbingPlumbing107/08/2026
Demar PlumbingFire Protection107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
FirequestFire Protection107/08/2026
Sato Construction CoGeneral Contractor107/08/2026
Hig Electric Assc NYCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP Inspections and Commis70792012/19/2025
Crosscheck Inspection Services544106/25/2025
Laurence G. Jones Architects55601111/06/2024
Special Testing & Consulting1688204/22/2020
Building Lifecycle
All (216)Filed (39)Permit Issued (30)Signed Off (26)Facade (FISP) (13)Violation (60)Inspection (18)Special Inspection (30)
05/11/2026
Cycle 10 facade report submitted
05/05/2026
Cycle 10 facade inspection completed
04/17/2026
Signed off — Alteration
Proposed to repair the facade and proposed inspection of the steel welding by a third party as per the plan. No change to Use, egress, or occupancy.
M01330311-I1
04/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT WEST 21ST STREET ELEVATION.
M01315820-I1
04/02/2026
Signed off — Alteration
INITIAL CD5 FISP. INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING NEW DROPS WITH NEW TIE BACK LOCATIONS OPTION.
M01330601-I1
02/10/2026
Signed off — Alteration
Proposed to repair existing terra cotta on facade, all as per plan. No change of the use or occupancy or egress.
M01237160-I1
01/29/2026
Permit issued — Structural
M01237160-I1-ST
01/19/2026
Filed — Alteration
INITIAL CD5 FISP. INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING NEW DROPS WITH NEW TIE BACK LOCATIONS OPTION.
M01330601-P1
01/14/2026
Permit issued — General Construction
M01330311-I1-GC
01/07/2026
Signed off — Alteration
M01289980-I1
01/05/2026
Permit issued — Suspended Scaffold
M01330601-I1-SC
12/19/2025
Filed — Alteration
Proposed to repair the facade and proposed inspection of the steel welding by a third party as per the plan. No change to Use, egress, or occupancy.
M01330311-I1
12/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT WEST 21ST STREET ELEVATION.
M01315820-P1
12/09/2025
Special inspection requirement — Masonry
MOLLY GLENN
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
12/09/2025
Special inspection requirement — Final
Robert Kornfeld
12/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOLLY GLENN
12/08/2025
Filed — Alteration
INITIAL CD5 FISP. INSPECTION, REPAIRS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ADDING NEW DROPS WITH NEW TIE BACK LOCATIONS OPTION.
M01330601-I1
11/10/2025
Permit issued — Sidewalk Shed
M01315820-I1-SH
11/07/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT WEST 21ST STREET ELEVATION.
M01315820-I1
09/29/2025
Permit issued — Suspended Scaffold
M01289980-I1-SC
09/26/2025
Signed off — Alteration
Proposed to repair the ceiling on the 12th floor, all as per plan. No change of use, occupancy or egress.
M01238921-I1
09/19/2025
Filed — Alteration
M01289980-I1
07/23/2025
Permit issued — General Construction
M01238921-I1-GC
06/25/2025
Filed — Alteration
Proposed to repair existing terra cotta on facade, all as per plan. No change of the use or occupancy or egress.
M01237160-I1
06/23/2025
Permit issued — General Construction
M01238921-I1-GC
06/13/2025
Filed — Alteration
Proposed to repair the ceiling on the 12th floor, all as per plan. No change of use, occupancy or egress.
M01238921-I1
02/12/2025
Signed off — Alteration
M01036085-I1
01/07/2025
Signed off — Alteration
RE-FILING OF ALT. 2 SPRINKLER APPLICATION #104782754 FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM.
M00816007-I1
12/20/2024
Signed off — Alteration
RE-FILING OF PLUMBING WORK UNDER ALT. 2 #102085994 AS PER PLANS FILED HEREWITH.
M00816156-I1
12/20/2024
Signed off — Alteration
REFILING OF PLUMBING WORK UNDER ALT. 2 #104464027 AS PER PLANS FILED HEREWITH.
M00816144-I1
12/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/20/2024
Signed off — Alteration
SPRINKLER MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM AND PERMANENT SPRINKLER LAYOUT FOR 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01041244-I1
11/18/2024
Signed off — Alteration
SPRINKLER MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM AND PERMANENT SPRINKLER LAYOUT FOR 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01041244-S2
11/15/2024
Signed off — Alteration
SPRINKLER MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM AND PERMANENT SPRINKLER LAYOUT FOR 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01041244-S1
11/15/2024
Signed off — Alteration
SPRINKLER MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM AND PERMANENT SPRINKLER LAYOUT FOR 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01041244-S3
11/06/2024
Filed — Alteration
SPRINKLER MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM AND PERMANENT SPRINKLER LAYOUT FOR 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
M01041244-P2
11/06/2024
Special inspection requirement — Interior lighting power
MOLLY GLENN
11/06/2024
Special inspection requirement — Lighting controls
MOLLY GLENN
11/06/2024
Special inspection requirement — Final
Laurence Jones
11/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
11/05/2024
Special inspection requirement — Lighting controls
MOLLY GLENN
11/05/2024
Special inspection requirement — Interior lighting power
MOLLY GLENN
11/05/2024
Special inspection requirement — Final
Laurence Jones
11/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/25/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01059275-I1
10/25/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01059283-I1
10/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
09/20/2024
Permit issued — Plumbing
M00816144-I1-PL
09/20/2024
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
09/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
09/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
09/19/2024
Filed — Alteration
RE-FILING OF PLUMBING WORK UNDER ALT. 2 #102085994 AS PER PLANS FILED HEREWITH.
M00816156-P1
09/19/2024
Filed — Alteration
RE-FILING OF ALT. 2 SPRINKLER APPLICATION #104782754 FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM.
M00816007-P1
09/19/2024
Filed — Alteration
REFILING OF PLUMBING WORK UNDER ALT. 2 #104464027 AS PER PLANS FILED HEREWITH.
M00816144-P1
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offThe Grenadier01/29/2026
DOB NOWGeneral ConstructionSigned-offSato Construction Co01/14/2026
DOB NOWSuspended ScaffoldSigned-offSato Construction Co01/05/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/10/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System09/29/2025
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I07/23/2025
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I06/23/2025
DOB NOWPlumbingSigned-offGeneral Plumbing09/20/2024
DOB NOWSprinklersSigned-offGeneral Plumbing09/06/2024
DOB NOWPlumbingSigned-offGeneral Plumbing09/05/2024
DOB NOWMechanical SystemsSigned-offAinsworth09/04/2024
DOB NOWPlumbingSigned-offDPH Plumbing & Heating06/14/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/06/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/06/2024
DOB NOWSprinklersSigned-offDemar Plumbing05/29/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction05/29/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction05/21/2024
DOB NOWGeneral ConstructionSigned-offCreative Team Interiors I03/07/2023
DOB NOWGeneral ConstructionSigned-offTaurino Management12/30/2022
DOB NOWStructuralSigned-offNicholson & Galloway07/27/2022
DOB NOWSprinklersSigned-offFirequest05/09/2022
DOB NOWMechanical SystemsPermit IssuedTaurino Management04/27/2022
DOB NOWGeneral ConstructionSigned-offTaurino Management04/27/2022
DOB NOWPlumbingSigned-offAccess Plumbing04/26/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/05/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation08/01/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation10/19/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation10/19/2020
DOB NOWSprinklersSigned-offGeneral Plumbing01/16/2020
DOB NOWStructuralSigned-offStructural Preserv System11/25/2019
BISSPISSUEDGeneral Plumbing05/01/2025
BISPLISSUEDGeneral Plumbing08/01/2024
BISSPISSUEDGeneral Plumbing08/01/2024
BISSPISSUEDPeak Fire Protection10/12/2022
BISPLISSUEDPeak Plumbing Solutions10/12/2022
BISOTISSUEDPrat Enterprises09/07/2021
BISEQISSUEDPrat Enterprises08/18/2021
BISPLISSUEDPeak Plumbing Solutions01/19/2021
BISSPISSUEDPeak Fire Protection01/19/2021
BISOTISSUEDPratt Construction & Restoration12/01/2020
+ 40 more permits on file
17 projects · most recent 01/21/2026
General Wiring Boiler Controls HVAC Wiring
FiledStatusContractorScope
01/21/2026Permit IssuedTop Shelf Electric—
07/02/2024CompleteJumper ElectricGeneral Wiring
06/07/2024CompleteTop Shelf Electric—
12/09/2022CompleteProspect Electric ServiceGeneral Wiring
12/09/2022CompleteProspect Electric ServiceGeneral Wiring
05/17/2022CompleteHig Electric Assc NYCGeneral Wiring
05/06/2022CompleteHig Electric Assc NYC—
03/29/2021CompleteValmar ElectricGeneral Wiring
03/04/2021CompleteProspect Electric ServiceGeneral Wiring
02/23/2021CompleteSteven Farkas—
10/15/2020CompleteSteven Farkas—
09/02/2020CompleteRomcon ElectricBoiler Controls
07/29/2020CompleteProspect Electric ServiceGeneral Wiring
08/13/2019CompleteJorob Contracting & Electrical CoGeneral Wiring
06/17/2019CompleteCHT ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
12/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/06/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
12/09/2025FinalRobert Kornfeldprogress
12/09/2025Tenant Protection Plan ComplianceMOLLY GLENNspecial
12/09/2025Structural Stability – Alterations of existing buildingsMOLLY GLENNspecial
12/09/2025MasonryMOLLY GLENNspecial
11/06/2024Interior lighting powerMOLLY GLENNenergy_progress
11/06/2024Tenant Protection Plan ComplianceMOLLY GLENNspecial
11/06/2024Lighting controlsMOLLY GLENNenergy_progress
11/06/2024FinalLaurence Jonesprogress
11/06/2024Fire-Resistant Penetrations and JointsLaurence Jonesspecial
11/05/2024Interior lighting powerMOLLY GLENNenergy_progress
11/05/2024Fire-Resistant Penetrations and JointsLaurence Jonesspecial
11/05/2024Tenant Protection Plan Compliance—special
11/05/2024FinalLaurence Jonesprogress
11/05/2024Lighting controlsMOLLY GLENNenergy_progress
09/23/2024Tenant Protection Plan ComplianceMOLLY GLENNspecial
09/20/2024Tenant Protection Plan ComplianceMOLLY GLENNspecial
09/20/2024Sprinkler SystemsMOLLY GLENNspecial
09/20/2024Tenant Protection Plan ComplianceMOLLY GLENNspecial
09/18/2024Tenant Protection Plan Compliance—special
09/18/2024Sprinkler SystemsMOLLY GLENNspecial
09/12/2024Shutoff dampersMOLLY GLENNenergy_progress
09/12/2024HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
09/12/2024Energy Code Compliance InspectionsMOLLY GLENNprogress
09/12/2024FinalMOLLY GLENNprogress
09/12/2024Fire-Resistant Penetrations and JointsLaurence Jonesspecial
Latest 25 of 131.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
School of Visual ArtsEducationCellar, Floors 1–4, 7, 10–12, Roof
Project M01330311 Alteration · LOC Issued · 12/19/2025
Project M01315820 Alteration · LOC Issued · 11/07/2025
Project M01289980 Alteration · LOC Issued · 09/19/2025
Project M01237160 Alteration · LOC Issued · 06/25/2025
Project M01238921 Alteration · LOC Issued · 06/13/2025
Project M01041244 Alteration · LOC Issued · 05/10/2024
Project M01036085 Alteration · LOC Issued · 04/23/2024
Project M00816007 Alteration · LOC Issued · 09/06/2023
Project M00816144 Alteration · LOC Issued · 09/06/2023
Project M00816156 Alteration · LOC Issued · 09/06/2023
Project M00832503 Alteration · LOC Issued · 02/27/2023
Project M00714889 Alteration · LOC Issued · 06/09/2022
Rough TradeRetail—
Project M01330601 Alteration · LOC Issued · 12/08/2025
SVA NYC NYO Animation DepartmentEducationFloor 6, Roof
Project M00708291 Alteration · LOC Issued · 04/14/2022
Project M00705591 Alteration · LOC Issued · 04/13/2022
Project M00708277 Alteration · LOC Issued · 04/13/2022
Project M00708288 Alteration · LOC Issued · 04/13/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,355 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch31
09/02/2026M00708288-I1Request digital key ↗
09/02/2026M00708277-I1Request digital key ↗
09/02/2026M00708277-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00216173-I1Request digital key ↗
08/15/2026M00216173-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00290012-I1Request digital key ↗
08/15/2026M00290012-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00414154-I1Request digital key ↗
08/15/2026M00414154-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00414132-I1Request digital key ↗
▸Applications & Permits250
▸BISPLAN / WORK APPROVAL APPLICATION157
04/24/2025123117698Open ↗
03/26/2025123117714Open ↗
03/24/2025123117714Open ↗
Showing 3 of 157 on file for this type
▸BISWORK PERMIT APPLICATION90
05/02/2025123117714Open ↗
08/01/2024123346753Open ↗
08/01/2024120856476Open ↗
Showing 3 of 90 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
12/01/2020123854043Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/01/2020123854043Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
12/01/2020123854043Open ↗
▸Seals & Professional Certifications315
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION115
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 115 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
09/01/2026M00290012-P1Open ↗
09/01/2026M00290012-P1Open ↗
09/01/2026M00290012-P1Open ↗
Showing 3 of 46 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/05/2026M00216173-I1Open ↗
09/05/2026M00290012-I1Open ↗
09/05/2026M00290012-P1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
11/09/2020140975835Open ↗
Showing 1 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/05/2026M00414154-I1Open ↗
09/01/2026M00216173-P1Open ↗
09/01/2026M00705591-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/09/2020140975835Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/09/2020140975835Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment116
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISEQUIPMENT USE PERMITS21
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
05/11/2023120384413Open ↗
Showing 3 of 21 on file for this type
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING17
03/24/2025123117714Open ↗
05/10/2023123117714Open ↗
Showing 2 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
04/06/2023123349527Open ↗
10/26/2020123423615Open ↗
Showing 2 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT3
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
05/11/2023120856485Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
▸BISSPRINKLER SYSTEMS2
11/21/2024120856476Open ↗
09/25/2024123117714Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes17
11/09/2020140975835Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWTenant Protection Plan5
09/05/2026M00290012-I1Open ↗
09/04/2026M00414132-I1Open ↗
08/13/2026M00290012-P1Open ↗
Showing 3 of 5 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/05/2026M00216173-I1Open ↗
09/05/2026M00290012-I1Open ↗
09/05/2026M00290012-P1Open ↗
Showing 3 of 22 on file for this type
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
02/22/2021123853142Open ↗
07/10/2020123744341Open ↗
06/02/2020123587047Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/11/2022122861705Open ↗
04/26/2022122861705Open ↗
04/25/2022122861705Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)7
05/14/2025123346753Open ↗
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER2
05/24/2023121150468Open ↗
04/26/2022122861705Open ↗
▸BIS* HVAC INSULATION AND SEALING2
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00705591-I1Open ↗
08/13/2026M00708277-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY19
10/24/2022120856467Open ↗
08/12/2022123854043Open ↗
04/21/2022122861705Open ↗
Showing 3 of 19 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
05/14/2025123346753Open ↗
04/10/2025123117698Open ↗
09/25/2024123117714Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL SYSTEMS4
04/10/2025123117698Open ↗
05/24/2023121150468Open ↗
05/11/2023120384413Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs105
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
01/29/2026123117714Open ↗
05/14/2025123346753Open ↗
04/25/2025123117698Open ↗
Showing 3 of 49 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSUPERSEDING LETTER11
05/02/2025123117714Open ↗
08/01/2024120856476Open ↗
08/01/2024123346753Open ↗
Showing 3 of 11 on file for this type
▸BISFINAL7
05/14/2025123346753Open ↗
04/10/2025123117698Open ↗
09/25/2024123117714Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
01/22/2025123363779Open ↗
11/04/2021123363779Open ↗
09/28/2021123363779Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/20/2026M01315820-P1Open ↗
08/20/2026M01315820-I1Open ↗
▸Cost, Insurance & Ownership126
▸BISCOST AFFIDAVIT111
04/26/2022122861705Open ↗
04/26/2022122861705Open ↗
04/25/2022122861705Open ↗
Showing 3 of 111 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW313
01/29/2026123117714Open ↗
05/14/2025123346753Open ↗
04/10/2025123117698Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/08/2021123854043Open ↗
12/01/2020123854043Open ↗
▸Filing & Intake Forms146
▸BISEFILING COVER SHEET57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸BISADDITIONAL INFORMATION47
03/26/2025123117714Open ↗
01/23/2025123363779Open ↗
08/13/2024120856485Open ↗
Showing 3 of 47 on file for this type
▸BISBOROUGH INTAKE FORM39
05/02/2025123117714Open ↗
08/01/2024120856476Open ↗
08/01/2024123346753Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/09/2020140975835Open ↗
Showing 1 of 3 on file for this type
▸Other Documents36
▸BISLOFT BOARD CERTIFICATE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWManufacturer's Specifications2
08/19/2026M01330601-P1Open ↗
08/13/2026M01330601-I1Open ↗
▸DOB NOWCalculations2
08/19/2026M01330601-P1Open ↗
08/13/2026M01330601-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01289980-I1Open ↗
▸DOB NOWLoft Board Certificate1
09/05/2026M00290012-I1Open ↗