Elevator co-op, conversion from loft/warehouse
133 WOOSTER STREET
MANHATTAN · BIN 1008017
💬 Discuss this project
1893Year Built
7Stories
D0Building Class
M1-5/R7XZoning
32,921 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized0 Active Violations 4 likely answered ▸FISP: SAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: Prince Wooster · 4,850 sf lot · 6.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 5 filings · 20 docs
Floor 6Unit 6F8p · 2 filings · 17 docs
Floor 5
Floor 4Unit 4F, Unit 4RUnder Construction13p · 6 filings · 20 docs
Floor 3Unit 3SE7p · 2 filings · 10 docs
Floor 2Unit 2R30p · 3 filings · 20 docs
Floor 1Dermer Management, INC.Under Construction78p · 5 filings · 20 docs
CellarDermer Management, INC.Under Construction74p · 4 filings · 20 docs
Site & exteriorDermer Management, INC.24p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Prince Wooster4903/22/2026
Aarco Contracting LCC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD Architecture1003/21/2026
Signs Cad203/21/2026
Beam Living1103/21/2026
Code403/21/2026
Safe Rise503/21/2026
Progeny Management & Expediting Services403/21/2026
Expediting603/21/2026
All in Permit Consultants203/21/2026
AO Consulting and Drafting203/21/2026
Nyccode603/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aarco ContractingScaffold1203/21/2026
Exa USAGeneral Contractor807/08/2026
PD Construction GroupGeneral Contractor603/21/2026
R.J.C. MechanicalPlumbing307/08/2026
R.J.C. MechanicalFire Protection307/08/2026
National MaintenanceSign hanger207/08/2026
Everest ScaffoldingScaffold203/21/2026
Callaghan ConstructionGeneral Contractor204/09/2026
Mele ContractingGeneral Contractor203/21/2026
Anchor PlumbingFire Protection207/08/2026
Anchor PlumbingPlumbing207/08/2026
Minos ConstructionGeneral Contractor207/08/2026
Exa USAScaffold107/08/2026
Afgo Mechanical Servicesspecialty_contractor107/08/2026
CarpexGeneral Contractor107/08/2026
Silver Rail AssociatesGeneral Contractor107/08/2026
V. Vass ElectricElectrical103/21/2026
Signs CadSign hanger107/08/2026
Full Capacity FireFire Protection107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Joe Parziale Plumbing CoPlumbing107/08/2026
Mega PlumbingFire Protection107/08/2026
Nice PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Enthink Engineers6247801/29/2026
Katz Engineering238511/18/2025
Katz Architecture1371106/12/2025
Yorkos Engineering, Desig6991506/09/2025
Vincent J. Liotta P. E1974403/10/2025
Trolydia Testing & Inspec4422111/26/2024
Skyline Engineering2671109/23/2024
Erik Sun, Architect3010109/24/2021
Building Lifecycle
All (217)Filed (46)Permit Issued (39)Signed Off (22)Facade (FISP) (12)Violation (34)Inspection (18)Objection (16)Special Inspection (30)
08/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2026
Permit issued — Sprinklers
M00277553-S1-EW-SP
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Permit issued — Plumbing
M01256204-S1-PL
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Cost
02/20/2026
Objection raised — Scope
01/29/2026
Filed — Alteration
Relocate and install plumbing fixtures in apartment 4R on the 4th floor. Plumbing work. No change in use, occupancy or egress
M01256204-S1
01/29/2026
Filed — Alteration
CAP AND REMOVE EXISTING FIXTURES AT ROUGH AND INSTALLATION OF NEW PLUMBING SYSTEM THROUGHOUT APARTMENT 4F.
M00277553-S1
01/26/2026
Special inspection requirement — Sprinkler Systems
Sunil Saigal
01/22/2026
Special inspection requirement — HVAC insulation and sealing
Sunil Saigal
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
01/22/2026
Special inspection requirement — HVAC and service water heating system controls
Sunil Saigal
01/22/2026
Special inspection requirement — Maintenance information
Sunil Saigal
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
01/22/2026
Special inspection requirement — HVAC and service water heating equipment
Sunil Saigal
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
01/13/2026
Permit issued — General Construction
M01237806-I1-GC
01/09/2026
Objection resolved — Addressed
12/19/2025
Objection raised — Admin
12/08/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Plumbing
11/18/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM ON ROOF AND RELATED APPURTENACES SERVICING THE FOURTH FLOOR, APARTMENT 4F. NO CHANGE TO BUILDING OCCUPANCY GROUP, ZONING USE GROUP, OCCUPANCY OR BULK UNDER THIS OR RELATED APPLICATIONS.
M00276848-P2
11/17/2025
Permit issued — General Construction
M01237806-I1-GC
11/13/2025
Filed — Alteration
CAP AND REMOVE EXISTING FIXTURES AT ROUGH AND INSTALLATION OF NEW PLUMBING SYSTEM THROUGHOUT APARTMENT 4F.
M00277553-P1
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
11/12/2025
Special inspection requirement — Mechanical Systems
YURI KATZ
11/12/2025
Special inspection requirement — HVAC and service water heating equipment
Sunil Saigal
11/12/2025
Special inspection requirement — HVAC insulation and sealing
Sunil Saigal
11/12/2025
Special inspection requirement — HVAC and service water heating system controls
Sunil Saigal
11/12/2025
Special inspection requirement — Maintenance information
Sunil Saigal
11/12/2025
Special inspection requirement — Heating Systems
YURI KATZ
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
11/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
11/12/2025
Special inspection requirement — Final
Sunil Saigal
11/12/2025
Special inspection requirement — Shutoff dampers
Sunil Saigal
11/12/2025
Special inspection requirement — Post-installed Anchors
Sunil Saigal
10/15/2025
Permit issued — General Construction
M01256204-I1-GC
08/22/2025
Filed — Alteration
Relocate and install plumbing fixtures in apartment 4R on the 4th floor. Plumbing work. No change in use, occupancy or egress
M01256204-I1
08/06/2025
Special inspection requirement — Final
David Howell
07/16/2025
Signed off — Alteration
Project scope includes a new VRF DX Split System. New exhaust fans will be provided serving the entire project.
M01020354-I1
07/15/2025
Signed off — Alteration
SUSPENDED SCAFFOLD INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01020329-I1
07/02/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Scope
06/26/2025
Signed off — Alteration
Renovating apartment 2R at 133 Wooster St as per plans. New doors and partition work as indicated on plans. Relocate kitchen. Cap and remove existing bathroom. Two bathrooms proposed. No change in occupancy, use, or egress.
M00962036-I1
06/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2025
Filed — Alteration
Installation of security door in lobby
M01237806-I1
06/09/2025
Filed — Alteration
SUSPENDED SCAFFOLD INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01020329-P2
05/20/2025
Filed — Alteration
SUSPENDED SCAFFOLD INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01020329-P1
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
BALTU YORKOS
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BALTU YORKOS
05/20/2025
Special inspection requirement — Sprinkler Systems
BALTU YORKOS
05/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2025
Signed off — Alteration
ERECT A NON-ILLUMINATED BUSINESS BLADE SIGN "LIP LAB", (Black) NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01086988-I1
05/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2025
Permit issued — Sign
M01086988-I1-SG
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedR.J.C. Mechanical06/15/2026
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical04/03/2026
DOB NOWGeneral ConstructionPermit IssuedMinos Construction01/13/2026
DOB NOWGeneral ConstructionPermit IssuedMinos Construction11/17/2025
DOB NOWGeneral ConstructionPermit IssuedCallaghan Construction Co10/15/2025
DOB NOWSignSigned-offSigns Cad04/17/2025
DOB NOWMechanical SystemsSigned-offAfgo Mechanical Services03/21/2025
DOB NOWGeneral ConstructionSigned-offPD Construction Group03/14/2025
DOB NOWMechanical SystemsSigned-offCarpex01/24/2025
DOB NOWMechanical SystemsSigned-offExa USA11/29/2024
DOB NOWSprinklersSigned-offReal Plumbing11/20/2024
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services10/21/2024
DOB NOWPlumbingSigned-offNice Plumbing09/25/2024
DOB NOWGeneral ConstructionSigned-offPD Construction Group08/16/2024
DOB NOWPlumbingSigned-offJoe Parziale Plumbing Co04/27/2023
DOB NOWStructuralSigned-offExa USA04/25/2023
DOB NOWSprinklersSigned-offFull Capacity Fire04/25/2023
DOB NOWGeneral ConstructionSigned-offExa USA04/17/2023
DOB NOWConstruction FenceSigned-offExa USA04/04/2023
DOB NOWGeneral ConstructionSigned-offExa USA03/24/2023
DOB NOWPlumbingSigned-offGregg NY Plumbing01/21/2022
DOB NOWGeneral ConstructionSigned-offMele Contracting11/15/2021
DOB NOWPlumbingSigned-offR.J.C. Mechanical09/03/2021
DOB NOWPlumbingSigned-offAnchor Plumbing12/22/2020
DOB NOWSprinklersSigned-offAnchor Plumbing12/16/2020
DOB NOWSprinklersSigned-offR.J.C. Mechanical11/27/2020
DOB NOWMechanical SystemsPermit IssuedCallaghan Construction Co08/26/2020
DOB NOWSupported ScaffoldSigned-offAarco Contracting06/15/2020
DOB NOWSidewalk ShedSigned-offAarco Contracting06/15/2020
DOB NOWMechanical SystemsSigned-offSilver Rail Associates06/12/2020
DOB NOWSprinklersSigned-offR.J.C. Mechanical02/12/2020
DOB NOWPlumbingSigned-offR.J.C. Mechanical02/12/2020
DOB NOWSprinklersSigned-offAnchor Plumbing12/03/2019
DOB NOWPlumbingSigned-offAnchor Plumbing12/02/2019
DOB NOWSidewalk ShedSigned-offAarco Contracting07/19/2019
DOB NOWSupported ScaffoldSigned-offAarco Contracting07/19/2019
DOB NOWSignSigned-offNational Maintenance06/18/2019
DOB NOWSignSigned-offNational Maintenance06/18/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding01/07/2019
BISOTISSUEDAarco Contracting06/15/2020
+ 40 more permits on file
1 project · most recent 11/18/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/18/2025Permit IssuedCallaghan Construction CoAir Conditioning Systems, Associated Ducts and Piping, Heating Systems
Cooling
Lg ARNU093L1G4 9,600 BTU · Vrf Indoor ×30
ARUN060GSS4 60,000 BTU · Vrf Outdoor ×12
ARNU183L2G4 19,100 BTU · Vrf Indoor ×6
ARNU243M2A4 24,200 BTU · Vrf Indoor ×6
Heating
Steamview Sv16-24 2,564 BTU ×8
Ducts & Piping
N/A N/A Ahu ×2
1 project · most recent 06/09/2025
FiledStatusContractorScope
06/09/2025Signed-offReal Plumbing—
3 projects · most recent 01/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/29/2026Signed-offGreat Oaks MechanicalGas, Water/Sanitary
01/29/2026Permit IssuedGreat Oaks MechanicalGas, Water/Sanitary
06/09/2025Signed-offNice PlumbingGas, Water/Sanitary
8 projects · most recent 09/20/2024
General Wiring
FiledStatusContractorScope
09/20/2024CompleteElpo Electrical ContgGeneral Wiring
03/27/2023CompleteAlba ElectricGeneral Wiring
12/07/2022CancelledMontgomery Electrical ContractingGeneral Wiring
01/13/2022CompleteL&B Electrical InternationalGeneral Wiring
11/24/2020CompleteIndy ElectricGeneral Wiring
02/10/2020Permit IssuedAmber Electl ContngGeneral Wiring
07/25/2019CompleteRichard Neu—
01/07/2019CompleteBorowide Elect'l Contractors—
1 project · most recent 06/09/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/09/2025Signed-offMega PlumbingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
01/26/2026Sprinkler SystemsSunil Saigalspecial
01/22/2026HVAC and service water heating equipment Sunil Saigalenergy_progress
01/22/2026Fire-Resistance Rated ConstructionSunil Saigalprogress
01/22/2026Energy Code Compliance InspectionsSunil Saigalprogress
01/22/2026Fire-Resistant Penetrations and JointsSunil Saigalspecial
01/22/2026HVAC insulation and sealing Sunil Saigalenergy_progress
01/22/2026Maintenance informationSunil Saigalenergy_progress
01/22/2026HVAC and service water heating system controls Sunil Saigalenergy_progress
11/12/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
11/12/2025Heating SystemsYURI KATZspecial
11/12/2025Mechanical SystemsYURI KATZspecial
11/12/2025Post-installed AnchorsSunil Saigalspecial
11/12/2025Energy Code Compliance InspectionsSunil Saigalprogress
11/12/2025FinalSunil Saigalprogress
11/12/2025HVAC insulation and sealing Sunil Saigalenergy_progress
11/12/2025Shutoff dampersSunil Saigalenergy_progress
11/12/2025Maintenance informationSunil Saigalenergy_progress
11/12/2025HVAC and service water heating equipment Sunil Saigalenergy_progress
11/12/2025HVAC and service water heating system controls Sunil Saigalenergy_progress
11/12/2025Fire-Resistance Rated ConstructionSunil Saigalprogress
08/06/2025FinalDavid Howellprogress
05/20/2025Energy Code Compliance InspectionsBALTU YORKOSprogress
05/20/2025Fire-Resistant Penetrations and JointsBALTU YORKOSspecial
05/20/2025Sprinkler SystemsBALTU YORKOSspecial
12/18/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
Latest 25 of 94.
▾Documents — 536 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch27
09/05/2026M00277553-S1Request digital key ↗
09/03/2026M00594433-I1Request digital key ↗
09/03/2026M00591358-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00277567-I1Request digital key ↗
09/05/2026M00213680-I1Request digital key ↗
08/15/2026M00277567-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00335230-I1Request digital key ↗
09/03/2026M00276848-P2Request digital key ↗
09/03/2026M00276848-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00277553-P1Request digital key ↗
09/05/2026M00277553-I1Request digital key ↗
09/05/2026M00213680-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00115653-I1Request digital key ↗
09/04/2026M00194583-I1Request digital key ↗
08/15/2026M00194583-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00194589-I1Request digital key ↗
09/05/2026M00194589-P2Request digital key ↗
09/05/2026M00194589-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00161532-I1Request digital key ↗
09/05/2026M00161619-I1Request digital key ↗
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION32
12/12/2019123862962Open ↗
12/12/2019123865727Open ↗
11/12/2019140876176Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION28
03/13/2020123802956Open ↗
02/10/2020123865727Open ↗
11/14/2019140876176Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit27
09/05/2026M00277553-I1Open ↗
09/05/2026M00277553-P1Open ↗
09/03/2026M00276848-I1Open ↗
Showing 3 of 27 on file for this type
▸Seals & Professional Certifications181
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00115653-I1Open ↗
09/05/2026M00161532-I1Open ↗
09/05/2026M00194589-P2Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/25/2026M00194583-I1Open ↗
09/23/2026M00962036-I1Open ↗
09/01/2026M00115653-I1Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
02/10/2020123865727Open ↗
02/10/2020123865727Open ↗
12/12/2019123865727Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/23/2026M00962036-I1Open ↗
09/01/2026M00825291-P1Open ↗
09/01/2026M00825291-P1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/26/2019123460833Open ↗
01/20/2016122656045Open ↗
12/02/2015122576603Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/12/2019140876176Open ↗
08/25/2019140865810Open ↗
04/26/2019123460833Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/12/2019140876176Open ↗
08/25/2019140865810Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/12/2019140876176Open ↗
08/25/2019140865810Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
04/26/2019123460833Open ↗
05/31/2018123095890Open ↗
05/11/2017123095890Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
02/11/2015122091271Open ↗
10/31/2014122091271Open ↗
▸BISEQUIPMENT USE PERMITS1
07/10/2015122091271Open ↗
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
06/28/2017123095890Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/11/2015122091271Open ↗
▸Safety & Tenant Protection25
▸DOB NOWTenant Protection Plan16
09/05/2026M00194589-I1Open ↗
09/05/2026M00194589-P2Open ↗
09/05/2026M00194589-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTenant Protection Plan and Notes9
01/31/2020123865727Open ↗
12/12/2019123865727Open ↗
08/26/2019123802956Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos47
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/05/2026M00277553-I1Open ↗
09/05/2026M00277553-S1Open ↗
09/05/2026M00277553-P1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/12/2019123865727Open ↗
08/26/2019123802956Open ↗
06/25/2019123780943Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
10/08/2019123862962Open ↗
10/08/2019123862962Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/05/2026M00335230-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/10/2020123865727Open ↗
12/12/2019123865727Open ↗
06/25/2019123780943Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/08/2017122532349Open ↗
01/24/2017122532349Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE2
07/22/2019123780943Open ↗
05/11/2017123095890Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/02/2021123862962Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/04/2021123862962Open ↗
08/04/2021123862962Open ↗
06/02/2021123862962Open ↗
Showing 3 of 9 on file for this type
▸BISFINAL INSPECTION AS PER DIRECTIVE 14 OF1975 AND BB 2018-008.1
08/17/2021123780943Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/08/2017122532349Open ↗
▸Approvals, Objections & Sign-offs38
▸BISLANDMARKS APPROVAL16
02/03/2020123865727Open ↗
11/12/2019140876176Open ↗
10/11/2019123780943Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/17/2021123780943Open ↗
08/04/2021123862962Open ↗
02/19/2021123802956Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLANDMARKS SIGNOFF3
06/02/2021123862962Open ↗
06/02/2021123780943Open ↗
10/08/2019140865810Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/19/2021123802956Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT25
06/02/2021123862962Open ↗
06/02/2021123780943Open ↗
01/31/2020123865727Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/19/2021123802956Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/29/2016122532349Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET19
12/12/2019123865727Open ↗
08/26/2019123802956Open ↗
06/25/2019123780943Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM7
12/12/2019123862962Open ↗
05/10/2019123460833Open ↗
05/08/2019104149324Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
12/17/2019123862962Open ↗
12/16/2019123862962Open ↗
06/08/2018123095890Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/12/2019140876176Open ↗
08/25/2019140865810Open ↗
▸Other Documents13
▸DOB NOWProof of Historic Building9
08/23/2026M01020329-I1Open ↗
08/23/2026M01020329-P1Open ↗
08/13/2026M01020354-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLOCAL LAW 58-1987 WAIVER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01020329-S2Open ↗