Three families
1330 74 STREET
BROOKLYN · BIN 3159423
💬 Discuss this project
1905Year Built
2.5Stories
C0Building Class
R4AZoning
2,829 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 4,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 38p · 4 filings · 20 docs
Floor 27p · 3 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAPPALARDI CONSTRUCTION2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2024$1.7M—— → —$601/sf building
07/26/2022$1.4M—— → —$495/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G ENGINEERING PC401/08/2024
MARIANNE RUSSO401/30/2023
IMC ARCHITECTURE DPC109/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC103/21/2026
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RANDAZZO CONSTRUCTION GROGeneral Contractor903/21/2026
PAPPALARDI CONSTRUCTION LLCGeneral Contractor307/08/2026
A.G.M. P & H INCPlumbing207/08/2026
TESTA ELECTRIC CO., INCElectrical103/22/2026
VERITAS SERVICES, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778201/08/2024
INTEGRITY CONSULTING SERV666401/30/2023
Building Lifecycle
All (98)Filed (9)Permit Issued (8)Signed Off (2)Violation (24)Inspection (6)Objection (19)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, closed)
A
03/15/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; INSTALL NEW COMBINATION BOILERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883022-I1
02/07/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH GENERAL CONSTRUCTION AND PLUMBING WORKS INCLUDE NEW PARTITION WALLS, DOORS,FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883568-I1
01/26/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
01/09/2024
Special inspection requirement — Final
XIONGCAI GU
01/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
01/09/2024
Special inspection requirement — Mechanical Systems
XIONGCAI GU
01/08/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH GENERAL CONSTRUCTION AND PLUMBING WORKS INCLUDE NEW PARTITION WALLS, DOORS,FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883568-P1
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/08/2024
Special inspection requirement — Mechanical Systems
XIONGCAI GU
01/08/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
01/08/2024
Special inspection requirement — Final
XIONGCAI GU
01/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
01/05/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; INSTALL NEW COMBINATION BOILERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883022-P1
12/20/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/02/2023
Violation issued (ECB, closed)
Construction
07/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/13/2023
Permit issued — Plumbing
B00883022-I1-PL
06/08/2023
Permit issued — General Construction
B00883568-I1-GC
06/08/2023
Permit issued — General Construction
B00883568-I1-MS
06/01/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; INSTALL NEW COMBINATION BOILERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883022-I1
06/01/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3-FAMILY HOUSE WITH GENERAL CONSTRUCTION AND PLUMBING WORKS INCLUDE NEW PARTITION WALLS, DOORS,FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00883568-I1
04/21/2023
Permit issued — Construction Fence
B00401389-I1-FN
04/19/2023
Violation issued (ECB, closed)
Construction
03/21/2023
Violation issued (HPD, closed)
A
01/30/2023
Filed — Alteration
interior partitions at cellar, first, second floors. rebuild third floor and roof due to fire damage. new porch at rear yard. new interior steps to cellar from first floor. New exterior steps to cellar floor.
B00621588-P2
01/19/2023
Special inspection requirement — Footing and Foundation
ALEKSANDR LEVIN
01/19/2023
Special inspection requirement — Fenestration areas
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Lighting in dwelling units
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Fenestration air leakage
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
01/19/2023
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
01/19/2023
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Final
MARIANNE RUSSO
01/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
01/19/2023
Special inspection requirement — Structural Wood Frame
ALEKSANDR LEVIN
11/10/2022
Violation issued (HPD, closed)
I
10/18/2022
Objection raised — Accessibility
10/12/2022
Objection resolved — Addressed
10/07/2022
Objection raised — Other
10/05/2022
Filed — Alteration
CELLAR FL: 2 FIXTURE BATHROOM, LAUNDRY, AND HEATING. FIRST FLOOR: BATHROOM AND KITCHEN, SECOND FLOOR: BATHROOMS AND KITCHEN. THIRD FLOOR FLOOR: BATHROOM AND KITCHEN, RELOCATE GAS METERS.
B00619284-P1
09/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIANNE RUSSO
09/17/2022
Special inspection requirement — HVAC-R and service water heating system controls
MARIANNE RUSSO
09/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
MARIANNE RUSSO
09/17/2022
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
09/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
07/22/2022
Permit issued — Plumbing
B00619284-I1-PL
02/22/2022
Permit issued — Mechanical Systems
B00621588-I1-GC-CX
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
I
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.G.M. P & H INC06/13/2023
DOB NOWGeneral ConstructionSigned-offRANDAZZO CONSTRUCTION GRO06/08/2023
DOB NOWGeneral ConstructionSigned-offRANDAZZO CONSTRUCTION GRO06/08/2023
DOB NOWConstruction FencePermit IssuedRANDAZZO CONSTRUCTION GRO04/21/2023
DOB NOWPlumbingPermit IssuedA.G.M. P & H INC07/22/2022
DOB NOWMechanical SystemsPermit IssuedPAPPALARDI CONSTRUCTION LLC02/22/2022
DOB NOWConstruction FencePermit IssuedPAPPALARDI CONSTRUCTION LLC09/20/2021
DOB NOWConstruction FencePermit IssuedVERITAS SERVICES, INC10/14/2020
1 project · most recent 10/05/2022
Gas Water/Sanitary
FiledStatusContractorScope
10/05/2022Permit IssuedA.G.M. P & H INCGas, Water/Sanitary
2 projects · most recent 06/17/2023
General Wiring
FiledStatusContractorScope
06/17/2023CompleteTESTA ELECTRIC CO., INCGeneral Wiring
07/27/2022CompleteTESTA ELECTRIC CO., INC1 meters, 1 new_meters
1 project · most recent 01/30/2023
Wood
FiledStatusContractorScope
01/30/2023Permit IssuedPAPPALARDI CONSTRUCTION LWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
01/09/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/09/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
01/09/2024FinalXIONGCAI GUprogress
01/09/2024Fire-Resistance Rated ConstructionXIONGCAI GUprogress
01/09/2024Mechanical SystemsXIONGCAI GUspecial
01/08/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/08/2024Mechanical SystemsXIONGCAI GUspecial
01/08/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
01/08/2024FinalXIONGCAI GUprogress
01/08/2024Fire-Resistance Rated ConstructionXIONGCAI GUprogress
01/19/2023Footing and FoundationALEKSANDR LEVINprogress
01/19/2023Fenestration areasMARIANNE RUSSOenergy_progress
01/19/2023Lighting in dwelling unitsMARIANNE RUSSOenergy_progress
01/19/2023Fenestration air leakageMARIANNE RUSSOenergy_progress
01/19/2023Fenestration and door U-factor and product ratingsMARIANNE RUSSOenergy_progress
01/19/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
01/19/2023Mechanical SystemsALEKSANDR LEVINspecial
01/19/2023Energy Code Compliance InspectionsMARIANNE RUSSOprogress
01/19/2023FinalMARIANNE RUSSOprogress
01/19/2023Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
01/19/2023Structural Wood FrameALEKSANDR LEVINprogress
09/17/2022HVAC-R and service water piping design and insulationMARIANNE RUSSOenergy_progress
09/17/2022HVAC-R and service water heating system controlsMARIANNE RUSSOenergy_progress
09/17/2022HVAC-R and service water heating equipmentMARIANNE RUSSOenergy_progress
09/17/2022Energy Code Compliance InspectionsMARIANNE RUSSOprogress
Latest 25 of 42.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/28/2026B00619284-I1Request digital key ↗
08/27/2026B00621588-P2Request digital key ↗
08/27/2026B00883568-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00401389-I1Request digital key ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026B00621588-P2Open ↗
09/02/2026B00621588-P2Open ↗
09/02/2026B00621588-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00401389-I1Open ↗
08/28/2026B00619284-P1Open ↗
08/28/2026B00619284-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00621588-P2Open ↗
09/01/2026B00619284-P1Open ↗
08/30/2026B00619284-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B00619284-I1Open ↗
08/27/2026B00621588-P2Open ↗
08/15/2026B00619284-P1Open ↗
Showing 3 of 4 on file for this type