← Back
Elevator apt, miscellaneous
Taft (NYCHA)
1337 5 AVENUE · BIN 1080501
💬 Discuss this project
1959Year Built
19Stories
D9Building Class
R7-2Zoning
865,481 sfGross Floor Area
800Units
LL97 Covered2 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: NYC HOUSING AUTHORITY · 298,710 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 3 filings · 16 docs
Floor 194p · 2 filings · 9 docs
Floor 184p · 2 filings · 9 docs
Floor 174p · 2 filings · 9 docs
Floor 164p · 2 filings · 9 docs
Floor 154p · 2 filings · 9 docs
Floor 144p · 2 filings · 9 docs
Floor 134p · 2 filings · 9 docs
Floor 124p · 2 filings · 9 docs
Floor 114p · 2 filings · 9 docs
Floor 104p · 2 filings · 9 docs
Floor 94p · 2 filings · 9 docs
Floor 84p · 2 filings · 9 docs
Floor 74p · 2 filings · 9 docs
Floor 64p · 2 filings · 9 docs
Floor 54p · 2 filings · 9 docs
Floor 44p · 2 filings · 9 docs
Floor 34p · 2 filings · 9 docs
Floor 24p · 2 filings · 9 docs
Floor 14p · 2 filings · 9 docs
Cellar8p · 1 filing · 20 docs
Sub-Basement4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA11109/07/2026
NYCHA 99303/22/2026
TECHNICO CONSTRUCTION SER103/22/2026
NEW YORK CITY HOUSING AUTHORITY1103/22/2026
NYC HOUSING AUTHORITY903/22/2026
NEW YORK CITY HOUSING 996203/22/2026
NEW YORK HOUSING AUTHO040103/22/2026
FDNY103/21/2026
NYC DEPT OF DESIGN &CONSTRUCTION203/21/2026
NYCHA NY HOUSING AUTHORITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1603/21/2026
AK CONSULTING SERVICES603/21/2026
KINGSTON ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRAMAN MECHANICAL INCGeneral Contractor3407/08/2026
MNK ENTERPRISES LLCGeneral Contractor1907/22/2026
SKYWORX CONTRACTING INCGeneral Contractor1207/08/2026
EASTERN PLBG & MECH CONTRPlumbing807/08/2026
WDF INCGeneral Contractor403/21/2026
MAR-SAL PLBG & HTG, INCPlumbing407/08/2026
P & K CONTRACTING INCGeneral Contractor309/07/2026
WDF INCPlumbing207/08/2026
BAKER, WElectrical203/21/2026
RICHARDS P AND H CO, INCPlumbing203/22/2026
AMMITZBOLL, PAULElectrical203/21/2026
VILLAFANE JOHNElectrical103/21/2026
RODLAND, GLENNElectrical103/21/2026
JOHN VILLAFANEElectrical103/21/2026
WHALEN, WILLIAMElectrical103/21/2026
VINCENT SPINAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416107/17/2026
AK CONSULTING SERVICES, I6198103/24/2026
20/20 INSPECTIONS INC1471201/28/2026
RI CONSULTING SERVICES IN8904101/13/2026
TECTONIC ENGINEERING CONS106307/25/2022
NYMS CONSULTING, LLC8442108/27/2019
Building Lifecycle
All (216)Filed (26)Permit Issued (63)Signed Off (6)Facade (FISP) (20)Violation (60)Inspection (9)Objection (2)Special Inspection (30)
08/31/2026
Permit issued — General Construction
M01319205-I1-GC
07/20/2026
Permit issued — Sidewalk Shed
M00246441-I1-SH
07/20/2026
Permit issued — Supported Scaffold
M01398309-I1-SF
07/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01398309-I1
07/16/2026
Permit issued — Construction Fence
M00333290-I1-FN
05/06/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
03/30/2026
Permit issued — Suspended Scaffold
M01376857-I1-SC
03/30/2026
Cycle 10 facade report submitted
03/24/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 1365 5 AVENUE MANHATTAN, NY 10029
M01376857-I1
03/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
03/23/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
03/18/2026
Cycle 10 facade report signed — UNSAFE
03/17/2026
Cycle 10 facade inspection completed
03/12/2026
Signed off — Alteration
Suspended Scaffold out rigger installation for Facade inspections
M01344324-I1
01/28/2026
Filed — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01319205-P1
01/21/2026
Permit issued — Suspended Scaffold
M01344324-I1-SC
01/16/2026
Objection raised — Other
01/16/2026
Objection resolved — Addressed
01/13/2026
Filed — Alteration
Suspended Scaffold out rigger installation for Facade inspections
M01344324-I1
01/11/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
01/11/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
12/04/2025
Filed — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01319205-I1
07/14/2025
Permit issued — Sidewalk Shed
M00246441-I1-SH
07/11/2025
Permit issued — Construction Fence
M00333290-I1-FN
06/26/2025
Violation issued (FDNY_ORDER, closed)
06/26/2025
Violation issued (FDNY_ORDER, closed)
06/26/2025
Violation issued (FDNY_ORDER, closed)
06/26/2025
Violation issued (FDNY_ORDER, closed)
06/26/2025
Violation issued (FDNY_ORDER, closed)
06/26/2025
Violation issued (FDNY_ORDER, closed)
05/08/2025
Violation issued (ECB, closed)
Construction
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_ORDER, closed)
03/25/2025
Violation issued (FDNY_NOV, closed)
02/03/2025
Violation issued (FDNY_NOV, closed)
11/19/2024
Violation issued (FDNY_ORDER, closed)
11/19/2024
Violation issued (FDNY_NOV, closed)
11/19/2024
Violation issued (FDNY_ORDER, closed)
11/01/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PLUMBING PIPING TO CONNECT A TEMPORARY MOBILE BOILER TRAILER WITH BUILDING #3 MAIN HEATING PLANT IN THE EXISTING BOILER ROOM DURING HEATING PLANT UPGRADE IN CONJUNCTION WITH DOB # 123475462. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00205844-I1
10/07/2024
Permit issued — Plumbing
M00205844-I1-PL
09/09/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/26/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/07/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/30/2024
Permit issued — Plumbing
M31905845-I1-PL
07/15/2024
Violation issued (FDNY_NOV, closed)
07/03/2024
Permit issued — Sidewalk Shed
M00246441-I1-SH
07/01/2024
Permit issued — Construction Fence
M00333290-I1-FN
04/29/2024
Signed off — Alteration
Install new gas piping for 3 boilers and 6 unit heaters filed under separate application and replace (2) gas boosters in the gas meter room in the boiler room with associated valves, controls and appurtenances. No change in use, egress or occupancy.
M00422909-I1
03/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HVAC PIPING TO CONNECT A TEMPORARY MOBILE BOILER TRAILER WITH BLDG #3 MAIN HEATING PLANT IN THE EXISTING BOILER ROOM DURING HEATING PLANT UPGRADE IN CONJUNCTION WITH DOB # 123475462. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00217435-I1
02/05/2024
Permit issued — Sidewalk Shed
M00246441-I1-SH
01/31/2024
Permit issued — Construction Fence
M00333290-I1-FN
01/09/2024
Signed off — Alteration
INSTALLATION OF 8' HIGH CHAIN LINK FENCE TO ENCLOSE STAGING AREA, TWO MOBILE BOILER TRAILERS AND TWO FUEL STORAGE DURING THE RENOVATION OF BUILDING HEATING PLANT.
M00250180-I1
01/08/2024
Filed — Alteration
INSTALLATION OF 8' HIGH CHAIN LINK FENCE TO ENCLOSE STAGING AREA, TWO MOBILE BOILER TRAILERS AND TWO FUEL STORAGE DURING THE RENOVATION OF BUILDING HEATING PLANT.
M00250180-P1
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedP & K CONTRACTING INC08/31/2026
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC07/20/2026
DOB NOWSupported ScaffoldPermit IssuedMNK ENTERPRISES LLC07/20/2026
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC07/16/2026
DOB NOWSuspended ScaffoldPermit IssuedVENTURE NK CORP03/30/2026
DOB NOWSuspended ScaffoldSigned-offZIRCON GROUP INC01/21/2026
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC07/14/2025
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC07/11/2025
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR10/07/2024
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR07/30/2024
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC07/03/2024
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC07/01/2024
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC02/05/2024
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC01/31/2024
DOB NOWConstruction FenceSigned-offFRAMAN MECHANICAL01/03/2024
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC10/23/2023
DOB NOWMechanical SystemsSigned-offFRAMAN MECHANICAL03/29/2023
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC03/06/2023
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC03/03/2023
DOB NOWConstruction FenceSigned-offFRAMAN MECHANICAL01/05/2023
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC09/15/2022
DOB NOWPlumbingPermit IssuedWDF INC05/27/2022
DOB NOWGeneral ConstructionPermit IssuedWDF INC05/24/2022
DOB NOWConstruction FenceSigned-offFRAMAN MECHANICAL05/11/2022
DOB NOWMechanical SystemsPermit IssuedFRAMAN MECHANICAL05/11/2022
DOB NOWMechanical SystemsSigned-offFRAMAN MECHANICAL05/11/2022
DOB NOWGeneral ConstructionPermit IssuedWDF INC05/02/2022
DOB NOWConstruction FencePermit IssuedSKYWORX CONTRACTING INC04/14/2022
DOB NOWSidewalk ShedPermit IssuedSKYWORX CONTRACTING INC04/11/2022
DOB NOWSidewalk ShedPermit IssuedSKYWORX CONTRACTING INC12/21/2021
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC10/07/2021
DOB NOWPlumbingPermit IssuedWDF INC08/06/2021
DOB NOWConstruction FencePermit IssuedSKYWORX CONTRACTING INC06/22/2021
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR05/17/2021
DOB NOWPlumbingSigned-offMAR-SAL PLBG & HTG, INC05/12/2021
DOB NOWMechanical SystemsSigned-offFRAMAN MECHANICAL05/05/2021
DOB NOWConstruction FenceSigned-offFRAMAN MECHANICAL05/05/2021
DOB NOWMechanical SystemsPermit IssuedFRAMAN MECHANICAL05/05/2021
DOB NOWMechanical SystemsPermit IssuedFRAMAN MECHANICAL04/27/2021
DOB NOWMechanical SystemsSigned-offFRAMAN MECHANICAL04/27/2021
+ 60 more permits on file
1 project · most recent 05/27/2020
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2020Permit IssuedFRAMAN MECHANICAL INCVentilation Systems
Ventilation
Greenheck SBE1H24-5 1,110 CFM · Exhaust Fan ×2
1 project · most recent 07/20/2021
Water/Sanitary
FiledStatusContractorScope
07/20/2021Permit IssuedWDF INCWater/Sanitary
14 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedLIT MODE ELECL CONTG INC—
08/31/2026Permit IssuedLIT MODE ELECL CONTG INC—
08/31/2026Permit IssuedLIT MODE ELECL CONTG INC—
08/31/2026Permit IssuedLIT MODE ELECL CONTG INC—
07/06/2026Permit IssuedKRISCORP ELECL CONTNG INC1 meters, 1 new_meters
04/17/2026Permit IssuedHYLAN DATACOM & ELECL LLC1 meters, 1 new_meters
03/24/2026Permit IssuedLIT MODE ELECL CONTG INC—
09/05/2024Permit IssuedB.P. ELECTRIC CORP—
03/06/2024CancelledKRISCORP ELECL CONTNG INC1 meters, 1 new_meters
07/11/2023CancelledTOUCHTEL TECHNOLOGY GROUPGeneral Wiring
07/11/2023CompleteTOUCHTEL TECHNOLOGY GROUPGeneral Wiring
05/24/2023CancelledEMENAR ELECL SVCS CONSTGeneral Wiring
04/25/2023CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
10/03/2019Permit IssuedAMIN ELECTRICAL CORP—
1 project · most recent 06/11/2020
Concrete
FiledStatusContractorScope
06/11/2020——Concrete
2 projects · most recent 07/17/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/17/2026Permit IssuedMNK ENTERPRISES LLCScaffold
12/17/2019Permit IssuedMNK ENTERPRISES LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/09/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/26/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/12/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/07/2024Fail-Final CND-Occupancy InspectionFailView ↗
12/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
05/06/2026Post-installed AnchorsJOEL PHAGOOspecial
03/23/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
03/23/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
01/11/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
01/11/2026Post-installed AnchorsMd Istiaque Hasanspecial
11/08/2023Mechanical SystemsSULIMAN AHMEDspecial
11/08/2023Chimneys and ventsSULIMAN AHMEDspecial
11/08/2023FinalSULIMAN AHMEDprogress
11/08/2023HVAC insulation and sealing SULIMAN AHMEDenergy_progress
09/29/2023Chimneys and ventsSULIMAN AHMEDspecial
09/29/2023Mechanical SystemsSULIMAN AHMEDspecial
09/29/2023FinalSULIMAN AHMEDprogress
09/29/2023HVAC insulation and sealing SULIMAN AHMEDenergy_progress
04/04/2022FinalSCOTT SEGALprogress
06/12/2020Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
06/12/2020FinalGEORGE GHEBRYALprogress
06/12/2020Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/12/2020MasonryGEORGE GHEBRYALspecial
06/12/2020Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
06/12/2020Structural Steel - WeldingGEORGE GHEBRYALspecial
05/28/2020HVAC and service water heating system controls GEORGE GHEBRYALenergy_progress
05/28/2020Electrical motorsGEORGE GHEBRYALenergy_progress
05/28/2020Shutoff dampersGEORGE GHEBRYALenergy_progress
05/28/2020HVAC and service water heating equipment GEORGE GHEBRYALenergy_progress
05/28/2020Mechanical SystemsGEORGE GHEBRYALspecial
Latest 25 of 36.
▾Documents — 490 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch7
09/03/2026M00529203-I1Request digital key ↗
09/02/2026M00712294-I1Request digital key ↗
08/20/2026M01319205-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/03/2026M00422909-P2Request digital key ↗
09/03/2026M00422909-I1Request digital key ↗
09/03/2026M00422909-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00217435-I1Request digital key ↗
09/05/2026M00217435-P3Request digital key ↗
09/05/2026M00217435-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/05/2026M00248316-I1Request digital key ↗
09/05/2026M00250180-I1Request digital key ↗
09/05/2026M00250180-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00265609-I1Request digital key ↗
08/15/2026M00265609-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00246441-I1Request digital key ↗
08/15/2026M00246441-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/05/2026M00250183-I1Request digital key ↗
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION52
01/18/2024123475462Open ↗
01/17/2024123475462Open ↗
10/11/2023123475462Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION35
02/11/2021123475462Open ↗
06/29/2020123684496Open ↗
06/29/2020123684496Open ↗
Showing 3 of 35 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZRD1-Zoning Resolution Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications107
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
07/03/2019123475462Open ↗
06/21/2019123684496Open ↗
06/21/2019123684496Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00217435-I1Open ↗
09/05/2026M00217435-P3Open ↗
09/05/2026M00217435-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00250183-I1Open ↗
09/02/2026M00217435-I1Open ↗
09/02/2026M00217435-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026M00217435-I1Open ↗
09/02/2026M00217435-I1Open ↗
09/01/2026M00248316-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/14/2023123475462Open ↗
08/13/2019123475462Open ↗
08/12/2019123475462Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/01/2018123475462Open ↗
09/03/2014140223032Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/03/2014140223032Open ↗
08/27/2014140223050Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/03/2014140223032Open ↗
08/27/2014140223050Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING9
12/20/2021123475462Open ↗
08/26/2021123475462Open ↗
08/24/2021123475462Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
08/14/2019123475462Open ↗
10/01/2018123475462Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/01/2018123475462Open ↗
Showing 1 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/25/2024123475462Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/26/2023123475462Open ↗
▸BISEQUIPMENT USE PERMITS1
04/10/2024123475462Open ↗
▸BISHEATING SYSTEMS1
01/25/2024123475462Open ↗
▸BISPLUMBING (PL) SIGNOFF1
02/02/2024123475462Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan15
09/05/2026M00265609-I1Open ↗
09/04/2026M00265616-I1Open ↗
09/03/2026M00422909-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTenant Protection Plan and Notes2
06/21/2019123684496Open ↗
10/16/2018123475462Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00217435-P3Open ↗
09/05/2026M00217435-P1Open ↗
09/05/2026M00217435-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/06/2016121967906Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
08/28/2019123475462Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00422909-I1Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
04/11/2024123475462Open ↗
07/07/2023123475462Open ↗
06/26/2023123475462Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/03/2019123475462Open ↗
06/21/2019123684496Open ↗
10/01/2018123475462Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/25/2022123684496Open ↗
06/06/2016121967906Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
01/25/2024123475462Open ↗
03/25/2022123684496Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00217435-I1Open ↗
08/13/2026M00250183-I1Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/25/2022123684496Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY18
04/11/2024123475462Open ↗
10/25/2023123475462Open ↗
10/25/2023123475462Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/29/2019123475462Open ↗
07/29/2019123475462Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
01/25/2024123475462Open ↗
03/25/2022123684496Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
01/25/2024123475462Open ↗
01/25/2024123475462Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
01/25/2024123475462Open ↗
01/25/2024123475462Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
03/25/2022123684496Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONCRETE SAMPLING & TESTING1
04/09/2024123475462Open ↗
▸BISCONCRETE DESIGN MIX1
04/09/2024123475462Open ↗
▸BISMECHANICAL SYSTEMS1
01/25/2024123475462Open ↗
▸Approvals, Objections & Sign-offs69
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
09/05/2026M00217435-I1Open ↗
09/05/2026M00217435-P3Open ↗
09/05/2026M00217435-P1Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
04/12/2024123475462Open ↗
03/28/2022123684496Open ↗
06/06/2016121967906Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
09/05/2026M00265609-I1Open ↗
09/04/2026M00265616-I1Open ↗
08/13/2026M00265609-P1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026M00265616-I1Open ↗
08/13/2026M00265609-I1Open ↗
08/13/2026M00246441-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/11/2021123475462Open ↗
09/02/2015140223050Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL2
01/25/2024123475462Open ↗
03/25/2022123684496Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
11/17/2014121967906Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/09/2015121967906Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT17
06/21/2019123684496Open ↗
06/21/2019123684496Open ↗
10/16/2018123475462Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/10/2024123475462Open ↗
03/08/2022123684496Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
09/27/2018123460049Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET13
06/21/2019123684496Open ↗
06/21/2019123684496Open ↗
10/01/2018123475462Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION13
08/02/2022123475462Open ↗
12/15/2021123475462Open ↗
09/21/2020123684496Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/03/2014140223032Open ↗
08/27/2014140223050Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM1
08/12/2019123475462Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/21/2019123684496Open ↗
Showing 1 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
10/31/2014121967906Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01344324-I1Open ↗
08/13/2026M01376857-I1Open ↗
▸DOB NOWWaiver Document2
08/13/2026M00265609-I1Open ↗
08/13/2026M00265616-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01376857-I1Open ↗
08/13/2026M01344324-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/17/2014140223032Open ↗
▸BISCHIMNEYS AND VENTS1
01/25/2024123475462Open ↗
▸BISMAINTENANCE INFORMATION1
01/25/2024123475462Open ↗