| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00852836 ↗ | 6315 14 AVENUE BROOKLYN | New Building | Permit Issued | 07/18/2023 | 09/29/2026 | Sub-Slab Depressurization System for New School Building |
| Q08026647 ↗ | 64-20 65 AVENUE QUEENS | New Building | Permit Issued | 10/27/2022 | 09/29/2026 | PROPOSED NB-STRUCTURAL WORK FOR SCHOOL PS216Q |
| B01304182 | NEPTUNE AVENUE BROOKLYN | Alteration | Permit Issued | 01/12/2026 | 08/31/2026 | Propose to install new canopy and new pre-engineered kiosk. No change in use, egress or occupancy. |
| Q08023576 ↗ | 179-01 90 AVENUE QUEENS | New Building | Permit Issued | 10/24/2022 | 08/10/2026 | P.S. 95-Q: UNDERGROUND PLUMBING WORK TYPE FOR A NEW SCHOOL BUILDING. |
| X00875055 ↗ | VAN CORTLAND PARK SOUTH BRONX | New Building | Permit Issued | 05/25/2023 | 06/24/2026 | Sub-Slab Depressurization System for New School Building |
| Q01348400 ↗ | 91-32 63 DRIVE QUEENS | Alteration | Signed-off | 02/18/2026 | 06/09/2026 | New steel framed canopy over entryway for tenant space along 63rd Drive |
| Job | Address | Type | Status | Filed | Latest permit | Description |
|---|---|---|---|---|---|---|
| B00852836 ↗ | 6315 14 AVENUE BROOKLYN | New Building | Permit Issued | 07/18/2023 | 09/29/2026 | Sub-Slab Depressurization System for New School Building |
| Q08026647 ↗ | 64-20 65 AVENUE QUEENS | New Building | Permit Issued | 10/27/2022 | 09/29/2026 | PROPOSED NB-STRUCTURAL WORK FOR SCHOOL PS216Q |
| B01304182 | NEPTUNE AVENUE BROOKLYN | Alteration | Permit Issued | 01/12/2026 | 08/31/2026 | Propose to install new canopy and new pre-engineered kiosk. No change in use, egress or occupancy. |
| Q08023576 ↗ | 179-01 90 AVENUE QUEENS | New Building | Permit Issued | 10/24/2022 | 08/10/2026 | P.S. 95-Q: UNDERGROUND PLUMBING WORK TYPE FOR A NEW SCHOOL BUILDING. |
| X00875055 ↗ | VAN CORTLAND PARK SOUTH BRONX | New Building | Permit Issued | 05/25/2023 | 06/24/2026 | Sub-Slab Depressurization System for New School Building |
| Q01348400 ↗ | 91-32 63 DRIVE QUEENS | Alteration | Signed-off | 02/18/2026 | 06/09/2026 | New steel framed canopy over entryway for tenant space along 63rd Drive |
| M01194434 ↗ | 121 EAST 14 STREET MANHATTAN | Alteration | Filed — no permit on record | 05/29/2026 | — | — |
| B01269726 ↗ | 17 DEAN STREET BROOKLYN | Alteration CO | Permit Issued | 08/21/2025 | 05/28/2026 | STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q08012928 ↗ | 107-05 WREN PLACE QUEENS | New Building | Permit Issued | 10/04/2022 | 05/12/2026 | Q116 - SUB-SLAB DEPRESSURIZATION SYSTEM |
| M01344951 ↗ | — | Alteration | Filed — no permit on record | 02/24/2026 | — | — |
| B01304160 | NEPTUNE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 01/12/2026 | — | — |
| M00973266 ↗ | 538 WEST 48 STREET MANHATTAN | Alteration | Signed-off | 12/26/2023 | 01/05/2026 | The West, South, and bulkhead exterior wall brick veneers shall be repaired for the entire exposed height of the building. |
| B00892113 ↗ | NEPTUNE AVENUE BROOKLYN | Alteration | Permit Issued | 10/04/2023 | 12/12/2025 | Voluntary Installation of new EV Charge Station. No change in use egress or occupancy under this application |
| S00892115 ↗ | 1165 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 10/04/2023 | 12/12/2025 | Voluntary Installation of new EV Charge Station. No change in use egress or occupancy under this application |
| X01313577 ↗ | 65 JESUP PLACE BRONX | Alteration | Filed — no permit on record | 12/04/2025 | — | — |
| Q01282989 ↗ | 87-46 123 STREET QUEENS | Alteration | Signed-off | 09/12/2025 | 09/24/2025 | Additional wythe of brick added to south wall after adjacent building demolition |
| X01276088 ↗ | BIN 2131107 BRONX | Alteration | Filed — no permit on record | 09/16/2025 | — | — |
| X01252311 ↗ | 2170 AQUEDUCT AVENUE EAST BRONX | Alteration | Filed — no permit on record | 07/16/2025 | — | — |
| B00836827 ↗ | 323 3 AVENUE BROOKLYN | Alteration | Permit Issued | 09/21/2023 | 05/06/2025 | Replacement of existing H&V Unit with new heat pump energy recovery ventilation unit. |
| Q01217403 ↗ | 35-59 222 STREET QUEENS | Alteration CO | Filed — no permit on record | 05/01/2025 | — | — |
| B00892120 ↗ | 2940 ATLANTIC AVENUE BROOKLYN | Alteration | Permit Issued | 10/04/2023 | 04/17/2025 | Voluntary Installation of new EV Charge Station. No change in use egress or occupancy under this application |
| Q01207891 ↗ | 137-31 45 AVENUE QUEENS | Alteration | Filed — no permit on record | 04/11/2025 | — | — |
| Q01207915 ↗ | 120-30 JAMAICA AVENUE QUEENS | Alteration | Filed — no permit on record | 04/09/2025 | — | — |
| B01207217 ↗ | 443 OVINGTON AVENUE BROOKLYN | Alteration | Filed — no permit on record | 04/08/2025 | — | — |
| X01173413 ↗ | 3448 ROMBOUTS AVENUE BRONX | Alteration | Filed — no permit on record | 02/26/2025 | — | — |
| Q00234077 ↗ | 31-03 20 AVENUE QUEENS | Alteration | Signed-off | 01/30/2020 | 01/30/2025 | Plumbing and sprinkler work for fire truck garage as per plans filed. No change in use, egress or occupancy. |
| B01073118 ↗ | 1102 ATLANTIC AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2024 | 01/09/2025 | Relocation of an existing interior wall and door, and installation of a new, open-faced, downdraft spray booth and associated exhaust stack,… |
| Q01092618 ↗ | 137-31 45 AVENUE QUEENS | New Building | Filed — no permit on record | 12/20/2024 | — | — |
| B01123131 ↗ | 443 OVINGTON AVENUE BROOKLYN | New Building | Filed — no permit on record | 12/12/2024 | — | — |
| M01130802 ↗ | 60 RIVERSIDE BOULEVARD MANHATTAN | Alteration | Signed-off | 10/29/2024 | 11/20/2024 | Installation of trellis on existing 19th Floor Roof Terrace (Apartment 2102) as per plans. No change to use egress or occupancy on this fili… |
| M00870373 ↗ | 121 EAST 14 STREET MANHATTAN | Alteration | Signed-off | 10/04/2023 | 10/22/2024 | Voluntary installation of new EV Charge Station. No change in use egress or occupancy under this application |
| S00892118 ↗ | 1220 RICHMOND TERRACE STATEN ISLAND | Alteration | Signed-off | 10/04/2023 | 10/17/2024 | Voluntary Installation of new EV Charge Station. No change in use egress or occupancy under this application |
| Q01110799 ↗ | 120-30 JAMAICA AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 10/01/2024 | — | — |
| B01072567 ↗ | 617 11 STREET BROOKLYN | Alteration | Filed — no permit on record | 08/07/2024 | — | — |
| B00276383 ↗ | 269 MAC DONOUGH STREET BROOKLYN | Alteration | Signed-off | 10/26/2020 | 07/30/2024 | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF AN 2 FAMILY DWELLING ON THE CELLAR, BASEMENT, 1 THRU 3 FLOORS. NO CHANGE IN USE OCCU… |
| M00390009 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/04/2020 | 07/25/2024 | Helical Piles to be added as a special inspection requirement |
| Q00968879 ↗ | 31-03 20 AVENUE QUEENS | Alteration | Signed-off | 01/08/2024 | 07/23/2024 | LADIES LOCKER AND SHOWER ROOM IMPROVEMENTS, INC. NEW PARTITIONS, PLUMBING FIXTURES AND FINISHES |
| Q00412296 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 11/23/2020 | 06/03/2024 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| B00943884 ↗ | 323 3 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 04/25/2024 | — | — |
| Q00234040 ↗ | 31-03 20 AVENUE QUEENS | Alteration | Permit Issued | 01/30/2020 | 04/19/2024 | Filing mechanical modifications for fire truck garage and adjacent canopy as per plans filed. Install new HVAC system. No change in use, egr… |
| Q00870885 ↗ | 21-24 44 AVENUE QUEENS | Alteration | Filed — no permit on record | 01/26/2024 | — | — |
| Q00399748 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 11/09/2020 | 12/14/2023 | remove existing gas distribution piping in cellar, and replace with new. abandon existing gas risers in pace and install new exposed gas ris… |
| Q00386242 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 09/02/2020 | 12/07/2023 | Removal of existing gas service pipe mains, and replacement with new. Abandoning of gas risers in place, and installation of new exposed gas… |
| Q00393470 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 11/23/2020 | 12/07/2023 | replacement of all existing gas piping distribution lines, including underground piping in between buildings. installation of new exposed ga… |
| Q00397290 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 11/23/2020 | 12/07/2023 | replacement of all existing gas piping distribution lines, including underground. installation of new exposed gas risers in residential kitc… |
| Q00400291 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 09/23/2020 | 12/07/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00408504 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 10/08/2020 | 12/07/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00411643 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 11/23/2020 | 12/07/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00924668 ↗ | 36-23 REVIEW AVENUE QUEENS | Alteration | Filed — no permit on record | 11/20/2023 | — | — |
| Q00386877 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 09/02/2020 | 10/27/2023 | replacement of all existing gas piping distribution lines, including underground. installation of new exposed gas risers in residential kitc… |
| M00380961 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/10/2020 | 10/24/2023 | INSTALL NEW VENTILATION SYSTEM FOR DOMESTIC WATER AND REPLACE DUPLEX VACUUM AND CONDENSATE PUMP AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS,… |
| M00422909 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/16/2021 | 10/23/2023 | Install new gas piping for 3 boilers and 6 unit heaters filed under separate application and replace (2) gas boosters in the gas meter room… |
| M00264551 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/06/2020 | 10/19/2023 | Installation of new concrete pad, hangers and supports as shown on plans filed herewith. |
| M00265587 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 10/19/2023 | Installation of new concrete pad, hangers and supports in cellar boiler room as shown on plans filed herewith. |
| M00265597 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/30/2019 | 10/19/2023 | Installation of new concrete pad, hangers and supports in cellar boiler room in as shown on plans filed herewith. |
| M00269078 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/30/2019 | 10/19/2023 | Installation of new concrete pad, hangers and supports as shown on plans filed herewith. |
| M00269135 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/23/2019 | 10/19/2023 | Installation of new concrete pad, hangers and supports as shown on plans filed herewith. |
| M00265571 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 01/03/2020 | 10/02/2023 | Installation of new concrete pad, hangers and supports in cellar boiler room as shown on plans filed herewith. |
| M00269019 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/30/2019 | 10/02/2023 | Installation of new concrete pad, hangers and supports as shown on plans filed herewith. |
| Q00933486 ↗ | 31 AVENUE QUEENS | Alteration | Signed-off | 09/27/2023 | 09/28/2023 | Partial remediation of concrete topping slab replacement and local exterior asphalt replacement |
| M00380907 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/27/2021 | 09/25/2023 | INSTALLATION OF NEW CONCRETE PAD, HANGERS AND SUPPORTS AS SHOWN ON PLANS FILLED HEREWITH. |
| Q00511558 ↗ | 31-39 FARRINGTON STREET QUEENS | Alteration | Signed-off | 06/09/2023 | 09/15/2023 | Interior addition of shower, locker rm. Structural, Mechanical, General Construction |
| Q00723262 ↗ | 155-25 71 AVENUE QUEENS | Alteration | Signed-off | 07/06/2022 | 05/23/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| M00339190 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/07/2020 | 04/03/2023 | Replacement of underground water line and fire line distribution system between the Polo Grounds Towers Buildings 1 and 2.The address of the… |
| M00341944 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 05/22/2020 | 04/03/2023 | Replacement of the Steam and condensate piping connecting between buildings 3 and 2 of the Polo Grounds NYCHA development. Abandon existing … |
| M00341960 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 05/22/2020 | 04/03/2023 | Replacement of the Steam and condensate piping connecting between buildings 2 and 4 of the Polo Grounds NYCHA development. Abandon existing … |
| M00343559 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 05/28/2020 | 04/03/2023 | Replacement of the Steam and condensate piping connecting between buildings of the Polo Grounds NYCHA development. Abandon existing 12-in st… |
| M00389949 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/04/2020 | 04/03/2023 | REPLACEMENT OF UNDERGROUND UTILITY PIPING. CORE DRILL NEW OPENINGS THROUGH EXISTING FOUNDATION WALLS AND INFILL EXISTING WALL OPENINGS WITH … |
| M00390036 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2020 | 04/03/2023 | CORE DRILL NEW OPENINGS THROUGH EXISTING FOUNDATION WALLS. INFILL EXISTING WALL WITH NON SHRINK DRY-PACK GROUT. |
| M00390039 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2020 | 04/03/2023 | CORE DRILL NEW OPENINGS THROUGH EXISTING FOUNDATION WALLS. INFILL EXISTING WALL WITH NON SHRINK DRY-PACK GROUT. |
| Q00497303 ↗ | 31-03 20 AVENUE QUEENS | Alteration | Permit Issued | 09/28/2021 | 01/26/2023 | Cut existing fence posts. Install new concrete footings and install new fence with gates to match. |
| M00339241 ↗ | 2927 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/07/2020 | 01/06/2023 | Replacement of underground water line and fire line distribution system between the Polo Grounds Towers Buildings. The address of the buildi… |
| M00265559 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| M00265583 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| M00265602 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| M00265671 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump in cellar boiler room as shown on plans |
| M00268350 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| M00269059 ↗ | 1337 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| M00269130 ↗ | 1735 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/03/2020 | 01/05/2023 | Install new ventilation system for domestic water and replace duplex vacuum and condensate pump as shown on plans |
| Q00414266 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 12/21/2020 | 01/05/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00721643 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/05/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00723279 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/05/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00402159 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 10/08/2020 | 01/04/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00407568 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 10/08/2020 | 01/04/2023 | remove existing gas distribution piping in cellar, replace with new. abandon existing gas risers in place and install new exposed gas risers… |
| Q00720662 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00721527 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00721542 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00721613 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00721616 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00722487 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00722514 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00722839 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/06/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00723040 ↗ | 69-01 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00723159 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00723170 ↗ | 70-25 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/05/2022 | 01/04/2023 | Remove existing gas distribution piping in cellar, replace with new. Abandon existing gas risers in place and install new exposed gas risers… |
| Q00234105 ↗ | 31-03 20 AVENUE QUEENS | Alteration | Permit Issued | 01/30/2020 | 12/15/2022 | structural filing for fire truck garage as per plans filed. No change in use, egress or occupancy. |
| B00370216 ↗ | 580 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 08/20/2020 | 09/15/2022 | new wood framing, rebuilt brick wall at font and rear all as per plan in conjunction to alt 1 filing 321440464 and foundation filing 340755… |
| B00348680 ↗ | 110 WAVERLY AVENUE BROOKLYN | Alteration | Signed-off | 09/22/2020 | 09/13/2022 | new wood framing, rebuilt brick wall and new parapet at rear as per plans conjunction to alt 1 filing 321590079 and foundation filing. |
| B00348662 ↗ | 99 WAVERLY AVENUE BROOKLYN | Alteration | Signed-off | 09/22/2020 | 09/09/2022 | New wood framing, shoring proposed, rebuild and repair exterior front and rear wall as per plan. In conjunction to Alt 2 filing 340725200 |
| M00610509 ↗ | 175 WEST 88 STREET MANHATTAN | Alteration | Signed-off | 11/23/2021 | 08/22/2022 | STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF UNIT 1 (CEL, BAS, 001) OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| Person | Filings | Most recent |
|---|---|---|
| Rob Raab | 138 | 05/17/2024 |
| BRIAN VEITH | 23 | 04/03/2026 |
| Christopher Desmond | 20 | 07/28/2026 |
| matt devinney | 12 | 08/22/2025 |
| Brian Aitchison | 2 | 01/29/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| LANGAN ENGINEERING | 3 | 08/11/2026 |
| SHENOY ENGINEERING, P.C. | 3 | 08/14/2026 |
| KPFF CONSULTING ENGINEERS | 2 | 08/14/2026 |
| NV/DESIGN.ARCHITECTURE PLLC | 2 | 03/20/2026 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 2 | 08/11/2026 |
| AKRF, INC. | 1 | 08/14/2026 |
| ALBERT ARONOV ARCHITECT | 1 | 05/11/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 1 | 03/20/2026 |
| DATTNER ARCHITECTS | 1 | 03/11/2026 |
| DEMO ARCHITECTS | 1 | 07/28/2026 |
| DIGROUPARCHITECTURE | 1 | 04/10/2026 |
| DLR GROUP | 1 | 05/19/2025 |
| EME CONSULTING ENGINEERING GROUP | 1 | 05/19/2025 |
| HARTLAND ENGINEERING, DPC | 1 | 05/19/2025 |
| HCN DESIGN | 1 | 12/22/2025 |
| HORACIO REPETTO | 1 | 05/19/2025 |
| JEMA | 1 | 09/16/2025 |
| JFK&M CONSULTING ENGINEERS | 1 | 07/30/2026 |
| KOYSMAN ENGINEERING PLLC | 1 | 05/11/2026 |
| LEVIN ENGINEERING PLLC | 1 | 05/19/2025 |
| LONG ISLAND ENGINEERING & ARCHITECT | 1 | 08/14/2026 |
| LORING CONSULTING ENGINEERS, INC. | 1 | 04/10/2026 |
| NEW AGE ENGINEERING PLLC | 1 | 07/28/2026 |
| PS&S | 1 | 04/10/2026 |
| RAEL AUTOMATIC SPRINKLER CO., INC. | 1 | 08/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| D.D.S. MECH PBG&HTG CORP | 28 | 05/17/2024 |
| FRAMAN MECHANICAL INC | 17 | 06/13/2023 |
| EMPIRE CONTROL ABATEMENT | 8 | 05/03/2024 |
| C.A.C. INDUSTRIES, INC | 4 | 10/04/2023 |
| HORIZON CONSTRUCTION INC | 3 | 09/26/2022 |
| NY FINE INTERIORS & WOODW | 3 | 02/17/2022 |
| PAR PLUMBING CO., INC | 3 | 08/14/2026 |
| TECHNICO CONSTRUCTION | 3 | 08/14/2026 |
| A & F FIRE PROTECTION CO | 2 | 08/14/2026 |
| ATTRI ENTERPRISES INC | 2 | 07/03/2024 |
| COASTAL POINTS CONSTRUCT | 2 | 09/22/2021 |
| HONEST & QUALITY CORP | 2 | 02/03/2021 |
| I.M.P. PLBG & HTG CORP | 2 | 06/15/2023 |
| I.M.P. PLBG. & HTG. CORP | 2 | 06/15/2023 |
| NAVILLUS TILE INC | 2 | 07/30/2026 |
| R.A.M.S. MECHANICAL INC | 2 | 08/14/2026 |
| SATELLITE EAST PLBG. INC | 2 | 07/17/2024 |
| AAH CONTRUCTION CORP | 1 | 05/17/2024 |
| ACS SYSTEM ASSOCIATES INC | 1 | 07/17/2024 |
| ARK SYSTEMS ELECTRIC CORP | 1 | 05/11/2026 |
| BURDA CONSTRUCTION CORP | 1 | 07/01/2021 |
| CASTCAPA CONSTRUCTION LLC | 1 | 10/04/2023 |
| CONSULTING REMODLING INC | 1 | 10/04/2023 |
| D'ONOFRIO GENERAL CONTRAC | 1 | 01/12/2026 |
| EAGLE 1 MECHANICAL, INC | 1 | 04/10/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| NYC Housing Authority | 45 | 05/17/2024 |
| NYCHA | 26 | 04/25/2024 |
| CONSOLITADED EDISON CO OF NY | 7 | 04/25/2024 |
| NYC SCHOOL CONSTRUCTION | 7 | 08/14/2026 |
| CON EDISON | 5 | 07/17/2024 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 3 | 09/16/2025 |
| Consolidated Edison of New York | 2 | 01/12/2026 |
| Icon Realty Management, LLC | 2 | 02/03/2021 |
| AIRWELD INC | 1 | 02/26/2025 |
| ALPHAPOINTE | 1 | 09/12/2025 |
| BARK FRAMEWORKS | 1 | 01/26/2024 |
| BLUE WOODS MANAGEMENT GROUP, INC. | 1 | 03/01/2021 |
| CONSOLIDATED EDISON COMPANY OF NY | 1 | 07/17/2024 |
| FIRE FOE CORP | 1 | 11/20/2023 |
| RESTORING URBAN NEIGHBORHOODS, LLC | 1 | 09/26/2022 |
| VICKI'S REALTY | 1 | 12/22/2025 |
| Wud Furniture LLC | 1 | 01/10/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 4 | 02/26/2025 |
| JM ZONING, LLC. | 4 | 05/11/2026 |
| JMV ASSOCIATES LLC | 2 | 08/14/2026 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 2 | 08/11/2026 |
| SOL BUILDING CONSULTING SERVICES | 2 | 05/19/2025 |
| WALTER T. GORMAN, PE, PC | 2 | 01/12/2026 |
| ALBERT ARONOV ARCHITECT | 1 | 05/11/2026 |
| BROMARK CONSULTING SERVICES | 1 | 05/11/2026 |
| CASO & ASSOCIATES,INC. | 1 | 05/19/2025 |
| HCN DESIGN | 1 | 12/22/2025 |
| J. CALLAHAN CONSULTING, INC. | 1 | 08/07/2024 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/20/2026 |
| NEXUS CONSULTING NYC, INC | 1 | 07/28/2026 |
| S&M EXPEDITING | 1 | 06/14/2022 |
| SBLM | 1 | 08/14/2026 |