← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Farrington
134-37 35TH AVENUE · BIN 4618575
💬 Discuss this project
2017Year Built
15Stories
RMBuilding Class
R6Zoning
292,390 sfGross Floor Area
113Units
LL97 CoveredRent Stabilized11 Active Violations ▸FISP: No Report FiledFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Farrington Realty · 38,775 sf lot · 7.54 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 31 filing
Floor 23 filings
Floor 11 filing
Cellar8 filings
Sub-Cellar1 filing
Site & exterior7 filings
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Farrington Realty5603/21/2026
Century Development Group3709/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Raymond Chan Architect807/21/2026
Lucid Building Engineering106/29/2026
Ejc Engineering701/22/2025
CX Consulting803/24/2023
Allen Shinfeld, P.E.211/10/2022
HCD Architect202/17/2022
Shaaban Engineering301/14/2020
KZ Engineering105/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Youn Design403/21/2026
Raymond Chan Architect203/21/2026
G Design Drafting603/21/2026
Hcdarchitect403/21/2026
National Sign and Lighting603/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triborough Construction SGeneral Contractor803/21/2026
Dve ConstructionGeneral Contractor603/21/2026
Great City Mechanicalspecialty_contractor511/06/2026
Tri Borough ScaffoldingScaffold407/08/2026
HV ElectricElectrical303/22/2026
A M Plumbing CompanyPlumbing303/21/2026
National MaintenanceSign hanger307/08/2026
Chef Creative OfficeGeneral Contractor207/08/2026
Tri State Plumbing & HeatingPlumbing207/08/2026
Monarch MechanicalPlumbing203/21/2026
KJK ElectricElectrical203/22/2026
Neptune Signs & AwningsSign hanger207/08/2026
Century Construction GroupGeneral Contractor203/21/2026
American Standard Plumbingspecialty_contractor207/08/2026
DLC Developmentspecialty_contractor203/21/2026
Rightway Plumbing and HeatingFire Protection107/17/2026
Nova Plumbing & HeatingPlumbing103/21/2026
Wagner Ziv Plumbing & HeatingPlumbing103/21/2026
Joe Parziale PlumbingPlumbing107/08/2026
A1 SpecializedSign hanger107/28/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
Centauri DevelopmentGeneral Contractor107/08/2026
CS RenovationGeneral Contractor107/08/2026
DLC DevelopmentGeneral Contractor103/21/2026
N Y Business Fire SystemsFire Protection103/21/2026
FK ConstructionGeneral Contractor103/21/2026
Good-Will MechanicalGeneral Contractor103/21/2026
Chief Fire SprinklerFire Protection103/21/2026
AAA Total PlumbingFire Protection110/24/2019
Big Brothers InternationalGeneral Contractor207/24/1997
CentrifugalFire Protection109/14/2018
Commercial Fire Protection ServicesFire Protection209/27/2017
Master Fire Prevention SystemFire Protection106/25/1998
MC SuperstructureGeneral Contractor411/14/2016
Nova PLG and HeatingGeneral Contractor106/11/2002
Nova PLG and HeatingPlumbing106/11/2002
Orion Plumbing & HeatingFire Protection110/01/2015
PSS of NYCFire Protection112/16/1997
Samco MechanicalPlumbing206/15/1998
Sukhmany ConstructionGeneral Contractor110/29/2013
Tan DevelopmentGeneral Contractor312/27/2013
Top Plumbing GroupPlumbing111/25/2016
Tri Borough ScaffoldingGeneral Contractor711/14/2019
Tri Borough ScaffoldingGeneral Contractor210/28/2020
Wagner Weintraub PLGPlumbing107/14/1997
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Just Consulting Engineering5865407/21/2026
Ejc Engineering4502701/22/2025
XC Engineering6692803/24/2023
KL Innovative Design7225102/28/2023
Z & T Engineering591202/17/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/05/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Q01470739-I1
11/05/2026
Permit renewed — Plumbing
Renewed with changes
Q01376812-S1-EW-SP
10/22/2026
Elevator Category 1 inspection report filed
10/19/2026
Altered/ changed building occupied without a valid co as per 28-118.3.1 - 28-118.3.2. At time of inspection, observed, the work is in progress…
ECB violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
686 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account