← Back
BuildNYC
Office with commercial, 7-19 stories
134 SPRING STREET
MANHATTAN · BIN 1007286
💬 Discuss this project
1896Year Built
7Stories
O6Building Class
M1-5/R7XZoning
65,972 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: Calliope Realty Associates · 9,942 sf lot · 6.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEmporio Armani27p · 4 filings · 20 docs
Floor 1Emporio Armani, Paul Smith82p · 9 filings · 20 docs
CellarEmporio Armani, Paul Smith74p · 8 filings · 20 docs
Site & exteriorEmporio Armani24p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Calliope Realty Associate13807/08/2026
Kub Capital1307/08/2026
LWL Associates1003/21/2026
KUB103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants1203/21/2026
Arsenal Building Consultants403/21/2026
Cornerstone Consulting103/21/2026
All in Permit Consultants103/21/2026
Code603/21/2026
Patuxent Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nationwide MechanicalFire Protection407/08/2026
Efficient Climate SolutioGeneral Contractor303/21/2026
EurostructGeneral Contractor307/08/2026
Schimenti Construction CoGeneral Contractor203/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection207/08/2026
Urbano's ElectricalElectrical203/22/2026
Nationwide MechanicalPlumbing107/08/2026
Safety Fire SprinklerFire Protection107/08/2026
Drummond RucklinElectrical103/21/2026
Tristate Plumbing ServicesPlumbing107/08/2026
HVAC Servicesspecialty_contractor107/08/2026
Two-Tone ContractingGeneral Contractor107/08/2026
Kings Group NYScaffold107/08/2026
Manhattan D EnterprisesScaffold107/08/2026
National MaintenanceSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HT Engineering6274303/03/2024
Atmosphere Design Group8581404/26/2023
Outsource Special Inspection2827111/15/2022
Rosini Engineering3282312/15/2021
Ryan Special Engineering2018208/20/2019
Building Lifecycle
All (155)Filed (17)Permit Issued (20)Signed Off (11)Facade (FISP) (15)Violation (46)Inspection (6)Objection (16)Special Inspection (24)
07/21/2026
Permit issued — Suspended Scaffold
M01427487-I1-SC
07/08/2026
Filed — Alteration
IRA facade inspections as per the plans
M01427487-I1
03/21/2024
Signed off — Alteration
Removal and installation of sprinkler heads and related work on the cellar and 1st floor as indicated on drawings.
M00833920-I1
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2024
Permit issued — Sprinklers
M00833920-I1-EW-SP
03/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS LORIA
03/06/2024
Special inspection requirement — Final
HENRY TORRES
03/06/2024
Special inspection requirement — Mechanical Systems
HENRY TORRES
03/03/2024
Filed — Alteration
M00834254-P1
02/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/27/2024
Special inspection requirement — Final
HENRY TORRES
02/27/2024
Special inspection requirement — Mechanical Systems
HENRY TORRES
02/20/2024
Signed off — Alteration
Removal and capping of plumbing fixtures on the cellar & 1st floor.
M08019985-I1
02/20/2024
Signed off — Alteration
M08019980-I1
02/20/2024
Signed off — Alteration
M00834244-I1
01/16/2024
Cycle 9 facade report submitted
01/15/2024
Cycle 9 facade report signed — SAFE
01/12/2024
Cycle 9 facade inspection completed
11/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/29/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2023
Violation issued (HPD, closed)
I
10/30/2023
Signed off — Alteration
ERECT NEW FLAG POLE AND FLAG ONTO BUILDING FACADE.
M00856289-I1
07/14/2023
Permit issued — Sprinklers
M00833920-I1-EW-SP
06/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/17/2023
Permit issued — Sprinklers
M00833920-I1-EW-SP
05/16/2023
Permit issued — Plumbing
M08019985-I1-PL
05/10/2023
Permit issued — Sign
M00856289-I1-SG
05/10/2023
Permit issued — Sprinklers
M00833920-I1-EW-SP
05/08/2023
Filed — Alteration
ERECT NEW FLAG POLE AND FLAG ONTO BUILDING FACADE.
M00856289-I1
05/01/2023
Permit issued — General Construction
M00834244-I1-GC
05/01/2023
Permit issued — Mechanical Systems
M00834254-I1-MS
04/26/2023
Filed — Alteration
Removal and installation of sprinkler heads and related work on the cellar and 1st floor as indicated on drawings.
M00833920-I1
04/25/2023
Filed — Alteration
Removal and capping of plumbing fixtures on the cellar & 1st floor.
M08019985-I1
04/24/2023
Filed — Alteration
M00834244-I1
04/24/2023
Filed — Alteration
M00834254-I1
04/06/2023
Special inspection requirement — Final
SALVATOR CARADONNA
03/27/2023
Permit issued — General Construction
M08019980-I1-GC
02/23/2023
Special inspection requirement — Sprinkler Systems
HENRY TORRES
02/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS LORIA
12/28/2022
Signed off — Alteration
M00676078-I1
11/30/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00762698-I1
11/29/2022
Permit issued — General Construction
M08019980-I1-GC
11/18/2022
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00767684-I1
11/15/2022
Filed — Alteration
M08019980-I1
11/14/2022
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
10/12/2022
Special inspection requirement — Final
LOUIS LORIA
07/29/2022
Permit issued — General Construction
M00676078-I1-GC
07/12/2022
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00767684-P1
07/06/2022
Permit issued — Supported Scaffold
M00767684-I1-SF
07/05/2022
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00767684-I1
06/29/2022
Filed — Alteration
M00676078-I1
06/23/2022
Permit issued — Sidewalk Shed
M00762698-I1-SH
06/22/2022
Filed — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00762698-I1
03/04/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE CELLAR AND FIRST FLOORS. PLUMBING AND SPRINKLER WORK TYPES. NO CHANGE OF USE, OCCUPANCY, OR EGRESS.
M00321838-I1
02/24/2022
Permit issued — Plumbing
M00321838-I1-EW-SP
02/14/2022
Cycle 9 facade report submitted
01/28/2022
Cycle 9 facade report signed — SWARMP
01/26/2022
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedElite Quality Construction & Contracting07/21/2026
DOB NOWSprinklersSigned-offNationwide Mechanical03/06/2024
DOB NOWSprinklersSigned-offNationwide Mechanical07/14/2023
DOB NOWSprinklersSigned-offNationwide Mechanical05/17/2023
DOB NOWPlumbingSigned-offNationwide Mechanical05/16/2023
DOB NOWSignSigned-offNational Maintenance05/10/2023
DOB NOWSprinklersSigned-offNationwide Mechanical05/10/2023
DOB NOWGeneral ConstructionSigned-offEurostruct05/01/2023
DOB NOWMechanical SystemsSigned-offHVAC Services05/01/2023
DOB NOWGeneral ConstructionSigned-offEurostruct03/27/2023
DOB NOWGeneral ConstructionSigned-offEurostruct11/29/2022
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting07/29/2022
DOB NOWSupported ScaffoldSigned-offKings Group NY07/06/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises06/23/2022
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler02/24/2022
DOB NOWPlumbingSigned-offTristate Plumbing Services06/16/2020
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler06/11/2020
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co06/09/2020
DOB NOWSprinklersSigned-offSafety Fire Sprinkler02/10/2020
DOB NOWMechanical SystemsSigned-offEfficient Climate Solutio12/12/2019
BISOTISSUEDSchimenti Construction Co06/08/2020
BISOTISSUEDAco-Del Group Company01/27/2020
BISOTISSUEDAco-Del Group Company01/27/2020
BISOTISSUEDAco-Del Group Company12/09/2019
BISEQISSUEDCore Scaffold Systems10/04/2019
BISMHISSUEDEfficient Climate Solutio06/22/2018
BISMHISSUEDEfficient Climate Solutio01/23/2018
BISMHISSUEDAlpine Enterprises NY05/31/2017
BISMHISSUEDNSP Enterprises12/02/2016
BISOTISSUEDNSP Enterprises12/07/2015
BISMHISSUEDBP Mechanical10/14/2015
BISOTISSUEDPMG-Madison Developer08/25/2015
BISSPISSUEDCapitol Fire SPKL Co05/22/2015
BISPLISSUEDVarsity Plumbing and Heating05/08/2015
BISOTISSUEDNSP Enterprises03/31/2015
BIS—ISSUEDRed Hook Sign and Electric02/17/2015
BISMHISSUEDPMG-Madison Developer12/09/2014
BISOTISSUEDPMG-Madison Developer12/09/2014
BISPLISSUEDM.A.C. Plumbing08/27/2014
BISOTISSUEDAco-Del Group Company08/22/2014
+ 30 more permits on file
1 project · most recent 08/20/2019
FiledStatusContractorScope
08/20/2019Signed-offSafety Fire Sprinkler6 heads
8 projects · most recent 05/29/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
05/29/2025CompleteUrbano's ElectricalGeneral Wiring
07/28/2023CompleteBig Shot ElectricGeneral Wiring
06/27/2022Complete5 J'S Electl Conts—
06/12/2020Permit IssuedAmr Electrical ContractingGeneral Wiring
03/06/2020CompleteUrbano's ElectricalGeneral Wiring
02/12/2019CompleteUrbano's ElectricalGeneral Wiring
08/06/2018CompleteUrbano's ElectricalHVAC Wiring
06/26/2018Permit IssuedR.C.M. ElectricGeneral Wiring
1 project · most recent 07/08/2026
FiledStatusContractorScope
07/08/2026Permit IssuedElite Quality Construction & Contracting—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/06/2024Tenant Protection Plan ComplianceLOUIS LORIAspecial
03/06/2024FinalHENRY TORRESprogress
03/06/2024Mechanical SystemsHENRY TORRESspecial
02/27/2024Tenant Protection Plan Compliance—special
02/27/2024FinalHENRY TORRESprogress
02/27/2024Mechanical SystemsHENRY TORRESspecial
04/06/2023FinalSALVATOR CARADONNAprogress
02/23/2023Sprinkler SystemsHENRY TORRESspecial
02/23/2023Tenant Protection Plan ComplianceLOUIS LORIAspecial
11/14/2022Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
10/12/2022FinalLOUIS LORIAprogress
10/19/2021Sprinkler SystemsDavid Rosinispecial
10/19/2021Fire-Resistant Penetrations and JointsDavid Rosinispecial
08/07/2019Sprinkler SystemsWilliam Ryanspecial
07/10/2019FinalWilliam Ryanprogress
07/10/2019HVAC insulation and sealing William Ryanenergy_progress
07/10/2019HVAC and service water heating equipment William Ryanenergy_progress
07/10/2019Duct leakage testing William Ryanenergy_progress
07/10/2019Permanent certificateWilliam Ryanenergy_progress
07/10/2019Maintenance informationWilliam Ryanenergy_progress
07/10/2019Shutoff dampersWilliam Ryanenergy_progress
07/10/2019Electrical motorsWilliam Ryanenergy_progress
07/10/2019HVAC and service water heating system controls William Ryanenergy_progress
07/10/2019Mechanical SystemsWilliam Ryanspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Emporio ArmaniRetailCellar, Floor 1, Roof
Project M00856289 Alteration · LOC Issued · 05/08/2023
Project M00833920 Alteration · LOC Issued · 04/26/2023
Project M08019985 Alteration · LOC Issued · 04/25/2023
Project M00834244 Alteration · LOC Issued · 04/24/2023
Project M00834254 Alteration · Permit Entire · 04/24/2023
Project M08019980 Alteration · LOC Issued · 11/15/2022
Paul SmithRetailCellar, Floor 1
Project M00321824 Alteration · LOC Issued · 03/20/2020
Project M00321838 Alteration · LOC Issued · 03/20/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 814 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch12
09/02/2026M00762698-I1Request digital key ↗
09/02/2026M00676078-I1Request digital key ↗
09/02/2026M00767684-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00206766-I1Request digital key ↗
08/15/2026M00321838-I1Request digital key ↗
08/15/2026M00321838-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00191436-I1Request digital key ↗
09/05/2026M00321824-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/15/2026M00321838-I1Request digital key ↗
08/15/2026M00321838-P1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION84
02/28/2020123570652Open ↗
02/19/2020140887342Open ↗
01/17/2020140878236Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION53
01/28/2020123780827Open ↗
01/28/2020123780827Open ↗
12/09/2019123780827Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWLPC Approval/Permit11
08/13/2026M00676078-I1Open ↗
08/13/2026M00321838-I1Open ↗
08/13/2026M00321824-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications184
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
03/10/2020123780827Open ↗
03/10/2020123780827Open ↗
03/10/2020123780827Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
07/01/2019123780827Open ↗
06/12/2017121291841Open ↗
11/06/2015122555154Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00321824-I1Open ↗
09/02/2026M00676078-I1Open ↗
09/02/2026M00767684-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
01/17/2020140878236Open ↗
10/03/2019140871812Open ↗
07/08/2019123780827Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/26/2026M08019980-I1Open ↗
09/19/2026M00856289-I1Open ↗
08/27/2026M00191436-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/26/2026M08019980-I1Open ↗
08/31/2026M00321838-P1Open ↗
08/31/2026M00321838-P1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/17/2020140878236Open ↗
10/03/2019140871812Open ↗
01/04/2018140728675Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/17/2020140878236Open ↗
10/03/2019140871812Open ↗
01/04/2018140728675Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/19/2020140887342Open ↗
▸Trade Schedules & Equipment99
▸BISEQUIPMENT USE PERMITS34
11/15/2018140728675Open ↗
11/15/2018140728675Open ↗
11/15/2018140728675Open ↗
Showing 3 of 34 on file for this type
▸BISSELF-CERT PLUMBING NOTICE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
08/12/2016121937538Open ↗
03/25/2016121908150Open ↗
02/17/2016121937538Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
11/15/2018140728675Open ↗
11/15/2018140728675Open ↗
11/15/2018140728675Open ↗
Showing 3 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/16/2017121908141Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan5
08/13/2026M00191436-I1Open ↗
08/13/2026M00321824-I1Open ↗
08/13/2026M00321838-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES4
01/17/2020140878236Open ↗
01/04/2018140728675Open ↗
02/28/2020123570652Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos47
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
04/03/2020123570652Open ↗
07/01/2019123780827Open ↗
01/04/2018140728675Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00676078-I1Open ↗
08/31/2026M00834254-P1Open ↗
08/31/2026M00834254-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00321824-I1Open ↗
08/13/2026M00321838-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/02/2020123570652Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
11/15/2018140728675Open ↗
11/15/2018140728675Open ↗
06/12/2017121291841Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/15/2018140728675Open ↗
02/10/2016122493934Open ↗
11/23/2015122555154Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/10/2020140878236Open ↗
01/17/2020140878236Open ↗
01/04/2018140728675Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/17/2020140878236Open ↗
01/04/2018140728675Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
07/01/2019123780827Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/14/2021123570652Open ↗
01/14/2021123570652Open ↗
01/14/2021123570652Open ↗
Showing 3 of 8 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs97
▸BISLANDMARKS APPROVAL35
04/03/2020123570652Open ↗
03/10/2020123780827Open ↗
03/10/2020123780827Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
01/14/2021123570652Open ↗
03/10/2020123780827Open ↗
02/19/2020140871812Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/22/2017121908141Open ↗
Showing 1 of 12 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA/CPC APPROVAL1
04/03/2020123570652Open ↗
▸BISLANDMARKS SIGNOFF1
01/14/2021123570652Open ↗
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT59
01/14/2021123570652Open ↗
03/10/2020123780827Open ↗
02/28/2020123570652Open ↗
Showing 3 of 59 on file for this type
▸Filing & Intake Forms84
▸BISEFILING COVER SHEET39
02/28/2020123570652Open ↗
07/01/2019123780827Open ↗
07/01/2019123780827Open ↗
Showing 3 of 39 on file for this type
▸BISADDITIONAL INFORMATION36
02/28/2020123570652Open ↗
02/28/2020123570652Open ↗
10/17/2019140871812Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/19/2020140887342Open ↗
01/17/2020140878236Open ↗
10/03/2019140871812Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
03/10/2020123780827Open ↗
02/19/2020140871812Open ↗
11/15/2018140728675Open ↗
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/03/2020123570652Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026M08019985-I1Open ↗
08/13/2026M08019980-I1Open ↗
08/13/2026M00834244-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLOFT BOARD CERTIFICATE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLoft Board Certificate2
08/13/2026M00206766-I1Open ↗
08/13/2026M00191436-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/16/2026M01427487-I1Open ↗