Roof5p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Exterior scope of work to create a two-story Loggia at the 15th/16th floors as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
19 documents · 1 drawing sheet
General Construction to take place on the 15th & 16th floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 482p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
See COMMENTS.
On file for this project
10 documents · 1 drawing sheet
Filing herewith mechanical drawings showing modification to existing mechanical system on the 47th and 48th floor. No change in Use, Egress or Occupancy under this application.
On file for this project
19 documents · 1 drawing sheet
Filing herewith structural drawings to show partial structural work on the underside of the 48th floor slab, for structural hangers related to mech units and ductwork on the 47th floor. No change in use, egress or occupancy under this application.
On file for this project
9 documents
Floor 477p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
See COMMENTS.
On file for this project
10 documents · 1 drawing sheet
Filing herewith drawings showing relocation of (1) existing FHC on the 47th floor. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Filing herewith mechanical drawings showing modification to existing mechanical system on the 47th and 48th floor. No change in Use, Egress or Occupancy under this application.
On file for this project
19 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 462p · 1 filing · 9 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications taking place on the 26th and 46th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 2 drawing sheets
Floor 45
Floor 446p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Structural modifications taking place on the 38th floor as indicated on the drawings.
On file for this project
28 documents · 6 drawing sheets
Floor 43Under Construction6p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 41st through 43rd floor as per plans filed herewith. No change in use, egress, or occupancy. (Floors listed as 42nd though 44th Marketing)
On file for this project
61 documents · 6 drawing sheets
Floor 42Under Construction6p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 41st through 43rd floor as per plans filed herewith. No change in use, egress, or occupancy. (Floors listed as 42nd though 44th Marketing)
On file for this project
61 documents · 6 drawing sheets
Floor 41Under Construction6p · 1 filing · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 41st through 43rd floor as per plans filed herewith. No change in use, egress, or occupancy. (Floors listed as 42nd though 44th Marketing)
On file for this project
61 documents · 6 drawing sheets
Floor 40Under Construction6p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 37th through 40th Construction Floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as Marketing Floor 38 through 41st.)
On file for this project
43 documents · 6 drawing sheets
Floor 39Under Construction4p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 37th through 40th Construction Floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as Marketing Floor 38 through 41st.)
On file for this project
43 documents · 4 drawing sheets
Floor 38Under Construction14p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications on 37th through 40th Construction Floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as Marketing Floor 38 through 41st.)
On file for this project
43 documents · 5 drawing sheets
Structural modifications taking place on the 38th floor as indicated on the drawings.
On file for this project
28 documents · 9 drawing sheets
Floor 37Under Construction15p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications on 37th through 40th Construction Floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as Marketing Floor 38 through 41st.)
On file for this project
43 documents · 8 drawing sheets
Structural modifications taking place on the 38th floor as indicated on the drawings.
On file for this project
28 documents · 7 drawing sheets
Floor 36Under Construction1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 33rd through 36th floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as Marketing floor 34 through 37.)
On file for this project
35 documents
Floor 35Under Construction1p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 33rd through 36th floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as Marketing floor 34 through 37.)
On file for this project
35 documents · 1 drawing sheet
Floor 34Under Construction1p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 33rd through 36th floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as Marketing floor 34 through 37.)
On file for this project
35 documents · 1 drawing sheet
Floor 33Under Construction1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on 33rd through 36th floor as per drawings filed herewith. No change in use, egress, or occupancy. (Listed as Marketing floor 34 through 37.)
On file for this project
35 documents
Floor 32Under Construction5p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 28th, 30th, 31st, 32nd Construction floor per plans filed herewith. No change in use, egress, or occupancy. (Listed as 29th, 31st, 32nd, and 33rd Marketing floor.)
On file for this project
49 documents · 5 drawing sheets
Floor 31Under Construction9p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 28th, 30th, 31st, 32nd Construction floor per plans filed herewith. No change in use, egress, or occupancy. (Listed as 29th, 31st, 32nd, and 33rd Marketing floor.)
On file for this project
49 documents · 9 drawing sheets
Floor 30Under Construction11p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications taking place on the 29th- 30th floors (30th - 31st Marketing floors) as indicated on the drawings.
On file for this project
42 documents
Structural modifications to take place on the 28th, 30th, 31st, 32nd Construction floor per plans filed herewith. No change in use, egress, or occupancy. (Listed as 29th, 31st, 32nd, and 33rd Marketing floor.)
On file for this project
49 documents · 3 drawing sheets
Removal of Sprinkler heads and installation of a temp loop on the 29th and 30th floors as indicated on the drawings.
On file for this project
19 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 29Under Construction11p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications taking place on the 29th- 30th floors (30th - 31st Marketing floors) as indicated on the drawings.
On file for this project
42 documents · 6 drawing sheets
Removal of Sprinkler heads and installation of a temp loop on the 29th and 30th floors as indicated on the drawings.
On file for this project
19 documents · 5 drawing sheets
Structural modifications to take place on the 28th & 29th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents
Floor 28Under Construction16p · 12 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications to take place on the 28th, 30th, 31st, 32nd Construction floor per plans filed herewith. No change in use, egress, or occupancy. (Listed as 29th, 31st, 32nd, and 33rd Marketing floor.)
On file for this project
49 documents · 2 drawing sheets
Sprinkler modifications taking place on the 28th floor as indicated on the drawings.
On file for this project
56 documents · 8 drawing sheets
Sprinkler modifications to take place on the 28th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 2712p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modification to existing sprinkler and standpipe taking place on the 27th floor per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 1 drawing sheet
Sprinkler modifications taking place on the 27th floor per plans filed herewith - temporary SP loop. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Mechanical systems modifications taking place on the 27th floor per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
29 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 26Under Construction2p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Change of use and increase of occupancy on the 14th, 15th, 16th, & 29th floors (30th Marketing floor). Removal of PA space on the 41st floor (42nd Marketing floor).
On file for this project
14 documents
Mechanical modifications taking place on the 26th and 46th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 2 drawing sheets
Floor 25
Floor 24
Floor 23Under Construction30p · 17 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications to take place on the 23rd floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
28 documents · 11 drawing sheets
Sprinkler modifications taking place on the 23rd floor as indicated on the drawings.
On file for this project
18 documents · 2 drawing sheets
Plumbing modifications to take place on the 23rd floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 2218p · 4 filings · 16 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing Modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy
On file for this project
7 documents · 6 drawing sheets
Sprinkler Modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 3 drawing sheets
Mechanical modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2122p · 16 filings · 18 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Plumbing modifications to take place on the 21st floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler modifications to take place on the 21st floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
10 documents · 4 drawing sheets
General Construction to take place on the 21st floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 7 drawing sheets
Latest 3 of 16 filings on this floor.
Floor 2024p · 13 filings · 20 docs
ArchitectureElectricalFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler modifications to take place on the 20th floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications to take place on the 20th floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
10 documents · 2 drawing sheets
Plumbing modifications on 20th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 13 filings on this floor.
Floor 1919p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 19TH AND 20TH FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
10 documents · 5 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
MECHANICAL SYSTEMS MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
31 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 1819p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Plumbing modifications to take place on the 18th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications to take place on the 18th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Sprinkler modifications to take place on the 18th floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
7 documents · 3 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 17Under Construction10p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications taking place on the 16th - 17th floors as indicated on the drawings.
On file for this project
43 documents
Structural modifications to take place on the 15th, 16th, and 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Mechanical modifications to take place on the 17th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 16Under Construction19p · 9 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler & Standpipe modifications to take place on the 15th & 16th Floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Structural modifications taking place on the 15-16th floors as indicated on the drawings.
On file for this project
45 documents · 3 drawing sheets
Structural modifications taking place on the 16th - 17th floors as indicated on the drawings.
On file for this project
43 documents · 13 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 15Under Construction24p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler & Standpipe modifications to take place on the 15th & 16th Floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Structural modifications taking place on the 14t-15th floors as indicated on the drawings.
On file for this project
57 documents · 1 drawing sheet
Structural modifications taking place on the 15-16th floors as indicated on the drawings.
On file for this project
45 documents · 20 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 14Under Construction24p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications taking pace on the 13 -14th floor as indicated on the drawings.
On file for this project
53 documents · 1 drawing sheet
Structural modifications taking place on the 14t-15th floors as indicated on the drawings.
On file for this project
57 documents · 21 drawing sheets
Change of use and increase of occupancy on the 14th, 15th, 16th, & 29th floors (30th Marketing floor). Removal of PA space on the 41st floor (42nd Marketing floor).
On file for this project
14 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 13Under Construction15p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural modifications taking pace on the 13 -14th floor as indicated on the drawings.
On file for this project
53 documents · 14 drawing sheets
Structural modifications taking place on the 14t-15th floors as indicated on the drawings.
On file for this project
57 documents · 1 drawing sheet
Plumbing modifications on 13th floor through 15th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 12Under Construction11p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications taking pace on the 13 -14th floor as indicated on the drawings.
On file for this project
53 documents
Plumbing modifications to take place on the 9th, 10th, 12th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Standpipe modifications to take place on the 9th floor as per plans filed herewith. No change in use, egress, or occupancy.,
On file for this project
11 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1124p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications to take place on the 10th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents
Plumbing Modifications to take place on the 11th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 5 drawing sheets
Sprinkler Modifications to take place on the 11th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1030p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Mechanical modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 4 drawing sheets
Sprinkler Modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 8 drawing sheets
Plumbing Modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 6 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 99p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler modifications taking place on the 9th floor as indicated on the drawings.
On file for this project
35 documents · 2 drawing sheets
Plumbing modifications to take place on the 9th, 10th, 12th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Standpipe modifications to take place on the 9th floor as per plans filed herewith. No change in use, egress, or occupancy.,
On file for this project
11 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 8Under Construction19p · 16 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Partial renovation of existing sprinkler distribution system to include new and relocated sprinkler heads as per plans. No change to egress, use or occupancy.
On file for this project
5 documents · 2 drawing sheets
Partial interior renovation of 8th floor including limited demolition, new non-bearing drywall partitions, flooring, ceiling tiles & lighting as per plans. There will be no change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Partial renovation of existing air conditioning system to include new and relocated ductwork, new controls and new diffusers and registers. No change to egress, use or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 16 filings on this floor.
Floor 74 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Single tenant build out of 4 interior floors with new interconnecting stairs in existing office building. No change of use or occupancy.
On file for this project
9 documents
New distribution ductwork from main building supply mains w/ VAV boxes. Supplemental AC units provided for meetings spaces and AC units provided for IT rooms. All supplemental AC units are cooled by building condenser water w/ waterside economizers.
On file for this project
17 documents
Single tenant fit out of 4 interior fls, 2 fls of restroom fit out, 1 floor with a caf and 1 floor with a pantry. Single tenant fit out of 4 interior floors, sprinkler loop on each floor, sprinkler heads installed through out the floor as per NFPA 13
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 68p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Single tenant build out of 4 interior floors with new interconnecting stairs in existing office building. No change of use or occupancy.
On file for this project
9 documents
New distribution ductwork from main building supply mains w/ VAV boxes. Supplemental AC units provided for meetings spaces and AC units provided for IT rooms. All supplemental AC units are cooled by building condenser water w/ waterside economizers.
On file for this project
17 documents
Single tenant fit out of 4 interior fls, 2 fls of restroom fit out, 1 floor with a caf and 1 floor with a pantry. Single tenant fit out of 4 interior floors, sprinkler loop on each floor, sprinkler heads installed through out the floor as per NFPA 13
On file for this project
8 documents
Latest 3 of 10 filings on this floor.
Floor 56p · 11 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural
Single tenant build out of 4 interior floors with new interconnecting stairs in existing office building. No change of use or occupancy.
On file for this project
9 documents
New distribution ductwork from main building supply mains w/ VAV boxes. Supplemental AC units provided for meetings spaces and AC units provided for IT rooms. All supplemental AC units are cooled by building condenser water w/ waterside economizers.
On file for this project
17 documents
Single tenant fit out of 4 interior fls, 2 fls of restroom fit out, 1 floor with a caf and 1 floor with a pantry. Single tenant fit out of 4 interior floors, sprinkler loop on each floor, sprinkler heads installed through out the floor as per NFPA 13
On file for this project
8 documents
Latest 3 of 11 filings on this floor.
Floor 422p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural
Modifying existing base building interior air system to provide new VAVs & ductwork distribution. New water-cooled VRF heat pump units to provide supplemental cooling throughout the 3rd& 4th fl. New water-cooled computer grade AC units will be provided
On file for this project
26 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 14 drawing sheets
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 318p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural
Modifying existing base building interior air system to provide new VAVs & ductwork distribution. New water-cooled VRF heat pump units to provide supplemental cooling throughout the 3rd& 4th fl. New water-cooled computer grade AC units will be provided
On file for this project
26 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents · 10 drawing sheets
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 21 filing · 4 docs
ElectricalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sign
NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - INSIDE PROPERTY LINES - A/B. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 19p · 19 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural
Sprinkler modifications to take place on the first floor as per drawings filed herewith. no change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications to take place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
General Construction to take place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 19 filings on this floor.
CellarUnder Construction17p · 21 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications taking pace on the 13 -14th floor as indicated on the drawings.
On file for this project
53 documents · 1 drawing sheet
Construction modifications taking place in the cellar (Concourse Marketing floor) as indicated on the drawings.
On file for this project
4 documents
Modifying existing base building interior air system to provide new VAVs & ductwork distribution. New water-cooled VRF heat pump units to provide supplemental cooling throughout the 3rd& 4th fl. New water-cooled computer grade AC units will be provided
On file for this project
26 documents · 1 drawing sheet
Latest 3 of 21 filings on this floor.
Sub-Cellar2p · 2 filings · 18 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Mechanical modifications to take place on the subcellar as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 2 drawing sheets
Plumbing modifications taking place in the sub-cellar and cellar floors as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
8 documents
Site & exteriorUnder Construction8 filings · 19 docs
ArchitectureCivilElectricalEquipmentGeneralStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
TEMPORARY FENCE ENCLOSURE AS PER DRAWINGS. CONSTRUCTION FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. PIPE SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Filed — no permit issued7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbing
No filed description on record for this project.
On file for this project
36 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
18 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.