| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01329419 ↗ | 851 8 AVENUE MANHATTAN | Alteration | Permit Issued | 01/20/2026 | 09/24/2026 | Design CFS ENGINEERING, DPC Contractor BARTON CONSTRUCTION LLC | Herewith filing Cooling Tower Replacement as per the plans. No change in use, egress or occupancy |
| M01296870 ↗ | 790 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2025 | 08/27/2026 | Design CFS ENGINEERING, DPC Contractor BARTON CONSTRUCTION LLC | Herewith filing Cooling Tower Replacement as per the plans. No change in use, egress or occupancy |
| M01371834 ↗ | 1 CHRISTOPHER STREET MANHATTAN | Alteration | Permit Issued | 05/14/2026 | 08/05/2026 | Design CFS ENGINEERING, DPC Contractor RJ BRUNO INC | Scope of work will include installation sanitary plumbing fixtures with associated drains and piping as indicated on plans. No change in Eg… |
| M01360896 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 05/06/2026 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PAR PLUMBING CO., INC Filer RIZZO GROUP | Installation of plumbing fixtures and associated piping on the 32nd floor (EQT Partners) as per plans. No change to use, egress or occupancy… |
| M01360913 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 05/05/2026 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor ARCHER CONSULTANTS GROUP Filer RIZZO GROUP | Modification to the existing sprinkler system on the 32nd Floor (EQT Partners), as per plans. No change to use, egress, or occupancy. |
| M01360768 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 04/13/2026 | Design METHOD ARCHITECTS PLLC Owner SL GREEN REALTY CORP Contractor HUNTER ROBERTS CONSTRUCTION Filer RIZZO GROUP | Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change t… |
| Name | Projects together | Most recent |
|---|---|---|
| CFS ENGINEERING, DPC | 121 | 05/14/2026 |
| JAROS BAUM & BOLLES | 55 | 10/22/2024 |
| GENSLER | 11 | 08/18/2023 |
| TPG ARCHITECTURE, LLP | 4 | 03/19/2025 |
| CAPRON DESIGN LLC | 3 | 11/25/2025 |
| TED MOUDIS ASSOCIATES | 3 | 01/29/2026 |
| ANTHONY MONTALTO, ARCHITECT | 1 | 08/10/2023 |
| B+W ARCHITECTURE DPC | 1 | 01/30/2025 |
| ETNA CONSULTING STRUCTURAL ENGINEER | 1 | 06/16/2022 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 06/13/2022 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 1 | 08/19/2024 |
| METHOD ARCHITECTS PLLC | 1 | 03/19/2026 |
| RANDALL P. COLLINS ARCHITECT, PC | 1 | 05/18/2021 |
| Spectorgroup Architecture LLP | 1 | 06/20/2024 |
| WAVIC ENGINEERING PLLC | 1 | 08/14/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| L&K PARTNERS, INC | 20 | 08/15/2023 |
| JAMES E FITZGERALD INC | 15 | 11/25/2025 |
| FULL CAPACITY FIRE CORP | 10 | 04/02/2025 |
| ABCO-PEERLESS SPRKLR CORP | 9 | 09/24/2024 |
| ADDISON PHS CORP | 9 | 06/16/2022 |
| ICON INTERIORS INC | 7 | 08/13/2025 |
| NEWGRANGE CONSTRUCTION CO | 7 | 02/15/2024 |
| NORTHEAST PLBG & HTG CORP | 7 | 05/02/2023 |
| PREFERRED MECHANICAL INC | 7 | 09/24/2025 |
| PREFERRED SPKLR AND MECH | 6 | 09/24/2025 |
| MORA FIRE PROTECTION LLC | 5 | 01/28/2022 |
| RINNOVO CONSTRUCTION, LLC | 5 | 05/18/2021 |
| LAB PLBG & HTG CO INC | 4 | 02/27/2025 |
| PACE PLUMBING CORP | 4 | 10/27/2021 |
| PAR PLUMBING CO., INC | 4 | 03/25/2026 |
| TRI-STAR CONSTRUCTION COR | 4 | 02/04/2022 |
| DV PLUMBING INC | 3 | 05/14/2021 |
| NUCOR CONSTRUCTION CORP | 3 | 07/18/2025 |
| AGGRESSIVE FIRE PROT LLC | 2 | 09/14/2023 |
| BARTON CONSTRUCTION LLC | 2 | 01/20/2026 |
| CLUNE CONSTRUCTION CO LP | 2 | 09/19/2023 |
| CORE FOUR CONSTRUCTION IN | 2 | 09/10/2024 |
| DK CONSTRUCTION ONE, CORP | 2 | 01/16/2020 |
| ENOBRAC PLUMBING, INC | 2 | 06/01/2022 |
| GO PRO FIRE PROTECTION C | 2 | 05/14/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| 345 PAS HOLDINGS LLC | 60 | 10/22/2024 |
| SL GREEN REALTY CORP | 21 | 03/25/2026 |
| EAST END CAPITAL LLC | 13 | 05/14/2021 |
| RFR REALTY LLC | 8 | 05/12/2023 |
| THE DURST ORGANIZATION | 6 | 04/03/2025 |
| TISHMAN SPEYER | 5 | 01/30/2025 |
| PARAMOUNT GROUP | 4 | 07/22/2024 |
| 1345 LEASEHOLD LLC | 3 | 07/18/2025 |
| 450 PROPERTY OWNER (US) LLC | 3 | 12/27/2021 |
| BROOKFIELD PROPERTIES | 3 | 08/03/2023 |
| CBRE | 3 | 11/05/2024 |
| CUSHMAN & WAKEFIELD | 3 | 02/12/2024 |
| MACKLOWE MANAGEMENT, LLC | 3 | 06/25/2021 |
| POP UP GROCER | 3 | 06/23/2023 |
| 300 PARK AVENUE | 2 | 09/10/2024 |
| 350 MADISON ACQUISITION LLC | 2 | 06/16/2022 |
| Jones Lang Lasalle | 2 | 04/13/2023 |
| SUMMIT GLORY LLC | 2 | 03/04/2020 |
| The Unitarian Church of All Souls | 2 | 04/05/2022 |
| 225 PARK AVENUE SOUTH | 1 | 03/04/2024 |
| BOSTON PROPERTIES | 1 | 06/20/2024 |
| COLLIERS | 1 | 02/24/2022 |
| NWSC | 1 | 09/15/2023 |
| PERMANENT MISSION OF THE REPUBLIC O | 1 | 09/14/2022 |
| RXR REALTY | 1 | 06/27/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 53 | 06/27/2025 |
| A1 EXPEDITING SERVICE CORP. | 17 | 11/25/2025 |
| RIZZO GROUP | 17 | 03/25/2026 |
| JAM CONSULTANTS, INC. | 6 | 04/03/2025 |
| EMPIRE CITY CONSULTANTS, INC. | 4 | 04/05/2022 |
| GILLMAN CONSULTING INC | 3 | 09/10/2024 |
| J. CALLAHAN CONSULTING, INC. | 3 | 06/23/2023 |
| ROBERT S. SCHNITZER | 3 | 11/05/2024 |
| TAILWIND CONSULTANTS LLC | 2 | 11/28/2022 |
| CCA CONSTRUCTION CONSULTING ASSOCIA | 1 | 06/13/2022 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 09/14/2022 |
| JANCO BUILDING CONSULTANTS, LLC. | 1 | 07/23/2024 |
| NEXT STEP BUILDING SOLUTIONS, INC | 1 | 01/29/2026 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 01/28/2022 |
| RELATED COMPANIES | 1 | 02/07/2023 |
| VISIONACM | 1 | 02/24/2022 |
| WHIDDEN SILVER INC. | 1 | 01/30/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01329419 ↗ | 851 8 AVENUE MANHATTAN | Alteration | Permit Issued | 01/20/2026 | 09/24/2026 | Design CFS ENGINEERING, DPC Contractor BARTON CONSTRUCTION LLC | Herewith filing Cooling Tower Replacement as per the plans. No change in use, egress or occupancy |
| M01296870 ↗ | 790 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2025 | 08/27/2026 | Design CFS ENGINEERING, DPC Contractor BARTON CONSTRUCTION LLC | Herewith filing Cooling Tower Replacement as per the plans. No change in use, egress or occupancy |
| M01371834 ↗ | 1 CHRISTOPHER STREET MANHATTAN | Alteration | Permit Issued | 05/14/2026 | 08/05/2026 | Design CFS ENGINEERING, DPC Contractor RJ BRUNO INC | Scope of work will include installation sanitary plumbing fixtures with associated drains and piping as indicated on plans. No change in Eg… |
| M01360896 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 05/06/2026 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PAR PLUMBING CO., INC Filer RIZZO GROUP | Installation of plumbing fixtures and associated piping on the 32nd floor (EQT Partners) as per plans. No change to use, egress or occupancy… |
| M01360913 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 05/05/2026 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor ARCHER CONSULTANTS GROUP Filer RIZZO GROUP | Modification to the existing sprinkler system on the 32nd Floor (EQT Partners), as per plans. No change to use, egress, or occupancy. |
| M01360768 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 04/13/2026 | Design METHOD ARCHITECTS PLLC Owner SL GREEN REALTY CORP Contractor HUNTER ROBERTS CONSTRUCTION Filer RIZZO GROUP | Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change t… |
| M01360838 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 04/13/2026 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor HUNTER ROBERTS CONSTRUCTION Filer RIZZO GROUP | Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, o… |
| M01280943 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 10/03/2025 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | Mechanical filing as per plans. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01280947 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 10/03/2025 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PREFERRED MECHANICAL INC | Plumbing/Sprinkler filing as per plans. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01280608 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/24/2025 | 10/01/2025 | Design CAPRON DESIGN LLC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01151869 ↗ | 100 PARK AVENUE MANHATTAN | Alteration CO | Permit Issued | 05/09/2025 | 09/18/2025 | Design CAPRON DESIGN LLC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | Change of occupancy and build out of pantry assembly space off single tenant build out of 1 interior floor in an existing office building. |
| M01227894 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/18/2025 | 07/28/2025 | Design CFS ENGINEERING, DPC Contractor NUCOR CONSTRUCTION CORP | Mechanical modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M01227897 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/18/2025 | 07/28/2025 | Design CFS ENGINEERING, DPC Owner 1345 LEASEHOLD LLC Contractor S.B.A. PLUMBING CORP Filer RIZZO GROUP | Sprinkler Modifications to take place on the 10th floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M01240449 ↗ | 77 FRONT STREET MANHATTAN | Alteration | Signed-off | 06/27/2025 | 07/01/2025 | Design CFS ENGINEERING, DPC Owner RXR REALTY Contractor COYLE CONTRACTING CORP Filer METROPOLIS GROUP INC | installation of mechanical system along with related duct work. |
| M01162717 ↗ | 64 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 04/17/2025 | 06/03/2025 | Design TED MOUDIS ASSOCIATES Owner ZAR PROPERTY NY Contractor ARCHSTONE BUILDERS LLC | New Plumbing fixture (Drinking fountain) in cellar and modification to sprinkler system on ground and cellar level as per plans |
| M01189001 ↗ | 114 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 04/08/2025 | Design CFS ENGINEERING, DPC Owner THE DURST ORGANIZATION Contractor FULL CAPACITY FIRE CORP Filer JAM CONSULTANTS, INC. | Sprinkler work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19) |
| M01188983 ↗ | 114 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 04/03/2025 | 04/07/2025 | Design CFS ENGINEERING, DPC Owner THE DURST ORGANIZATION Contractor ICON INTERIORS INC Filer JAM CONSULTANTS, INC. | Mechanical work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19) |
| M01188973 ↗ | 114 WEST 47 STREET MANHATTAN | Alteration | Permit Issued | 03/19/2025 | 03/25/2025 | Design TPG ARCHITECTURE, LLP Owner THE DURST ORGANIZATION Contractor ICON INTERIORS INC Filer JAM CONSULTANTS, INC. | General construction for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19) |
| M01151848 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/04/2025 | 02/10/2025 | Design CAPRON DESIGN LLC Contractor JAMES E FITZGERALD INC | Single tenant build out of 1 interior floor in existing office building. No change of use or occupancy |
| M01152335 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2025 | 02/06/2025 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | Modification to existing HVAC system as per plans. |
| M01152362 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/03/2025 | 02/06/2025 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PREFERRED SPKLR AND MECH | Modification to existing sprinkler system. Removal and installation of plumbing fixtures as per plans. |
| M01093707 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2024 | 11/06/2024 | Contractor CORE FOUR CONSTRUCTION IN | Installation of non-bearing interior partitions, doors and millwork as per plans. No change in use, egress or occupancy. |
| M01094144 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/10/2024 | 11/06/2024 | Design CFS ENGINEERING, DPC Owner 300 PARK AVENUE INC. Contractor CORE FOUR CONSTRUCTION IN Filer GILLMAN CONSULTING INC | Modification to mechanical ductwork and associated piping as per plans. No change in use, egress or occupancy. |
| M01053056 ↗ | 1459 BROADWAY MANHATTAN | Alteration | Signed-off | 06/17/2024 | 10/30/2024 | Design CFS ENGINEERING, DPC Owner BOSTON PROPERTIES Contractor ICON INTERIORS INC Filer GILLMAN CONSULTING INC | Partial alteration of an existing office space. Interior partitions, doors, ceiling, relocation of existing light fixtures. No change in u… |
| M01083692 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 10/22/2024 | — | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Filer METROPOLIS GROUP INC | — |
| M01070495 ↗ | 745 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2024 | 10/15/2024 | Design CFS ENGINEERING, DPC Owner PARAMOUNT GROUP Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Modifications to the existing sprinkler system on the 5th floor (Carr Workplaces- Suite 500) as per plans. No change to use, egress or occup… |
| M01070469 ↗ | 745 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2024 | 10/10/2024 | Design CFS ENGINEERING, DPC Contractor PREFERRED MECHANICAL INC | Modifications to the existing plumbing system on the 5th floor (Carr Workplaces- Suite 500) as per plans. No change to use, egress or occupa… |
| M01093474 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/24/2024 | 10/07/2024 | Design CFS ENGINEERING, DPC Contractor ABCO-PEERLESS SPRKLR CORP | Sprinkler Modifications to take place on the 11th floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M01093442 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/24/2024 | 09/26/2024 | Design CFS ENGINEERING, DPC Contractor JOHN GALLIN SON | Mechanical modifications to take place on the 11th floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M01094218 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/19/2024 | 09/13/2024 | Design CFS ENGINEERING, DPC Owner 300 PARK AVENUE INC. Contractor SEAN COAKLEY P & H INC Filer GILLMAN CONSULTING INC | Modify sprinkler heads and related piping as per plans. No change in use, egress or occupancy. |
| M01084687 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/06/2024 | 09/05/2024 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PREFERRED SPKLR AND MECH Filer RIZZO GROUP | Installation of a new sprinkler system on the 33rd and 34th floors (EQT) as per plans. No change to use, egress or occupancy. |
| M01084656 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/13/2024 | 08/26/2024 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor LAB PLBG & HTG CO INC Filer RIZZO GROUP | Modifications to the existing plumbing system on the 33rd and 34th floors (EQT) as per plans. No change to use, egress or occupancy. |
| M01084630 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/13/2024 | 08/14/2024 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor ICON INTERIORS INC Filer RIZZO GROUP | Modifications to the existing HVAC system on the 33rd and 34th floors (EQT) as per plans. No change to use, egress or occupancy. |
| M00907104 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 12/20/2023 | 08/13/2024 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor FULL CAPACITY FIRE CORP Filer METROPOLIS GROUP INC | HEREWITH FILING FOR DEERFIELD TENANT MINOR SPRINKLER MODIFICATION WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01084581 ↗ | 245 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/06/2024 | 08/08/2024 | Design TPG ARCHITECTURE, LLP Contractor ICON INTERIORS INC | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 33rd and 34th floors (EQT) as per plans.… |
| M01070459 ↗ | 745 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/22/2024 | — | Design CFS ENGINEERING, DPC Owner PARAMOUNT GROUP Filer RIZZO GROUP | — |
| M00971182 ↗ | 48 WALL STREET MANHATTAN | Alteration | Permit Issued | 01/19/2024 | 07/01/2024 | Design CFS ENGINEERING, DPC Owner CBRE INC. A/A/F Contractor LEGUCI PIPING&HEATING LLC Filer ROBERT S. SCHNITZER | Modify SPK system. Remove/relocate 3 , 24 new, remove 26, 0 extg. heads to remain (project area new work). Remove 1 1/2 in. SPK loop & repl… |
| M00968265 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 12/14/2023 | 05/28/2024 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR MECAHNICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| M00969065 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 01/19/2024 | 05/21/2024 | Design CFS ENGINEERING, DPC Owner CBRE INC. A/A/F Contractor PROSTAR PLUMBING AND HEAT Filer ROBERT S. SCHNITZER | Herewith filing plans plumbing work in 'New Pantry' area. Work consists of removal & replace of existing plumbing fixtures on existing rough… |
| M01015749 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 03/08/2024 | 04/16/2024 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor PENGUIN MAINTENANCE & SER Filer METROPOLIS GROUP INC | HEREWITH FILING FOR MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01023182 ↗ | 415 WEST 13 STREET MANHATTAN | Alteration | Permit Issued | 04/10/2024 | 04/16/2024 | Design CFS ENGINEERING, DPC Contractor ICON INTERIORS INC | PROPOSE TO PROVIDE 2 NEW HVAC UNITS AND ASSOCIATED DUCTWORK AS PER PLANS FILED HEREWITH. |
| M01023073 ↗ | 415 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 04/03/2024 | 04/12/2024 | Design CFS ENGINEERING, DPC Contractor STANDARD FIRE SUPP CORP | PROPOSE TO INSTALL SPRINKLERS AS PER PLANS FILED HEREWITH. |
| M00974337 ↗ | 48 WALL STREET MANHATTAN | Alteration | Permit Issued | 01/19/2024 | 03/22/2024 | Design CFS ENGINEERING, DPC Owner CBRE INC. A/A/F Contractor FALCON PACIFIC CONSTRUCT* Filer ROBERT S. SCHNITZER | Modification to HVAC system. Scope includes removal ceiling diffusers & registers, VAV box. New work: ducting, ceiling diffusers, registers,… |
| M01001524 ↗ | 666 3 AVENUE MANHATTAN | Alteration | Signed-off | 03/05/2024 | 03/18/2024 | Design B+W ARCHITECTURE DPC Owner TISHMAN SPEYER Contractor CONCEPT CONSTRUCTION SERV Filer WHIDDEN SILVER INC. | Modification to the plumbing and sprinkler systems as per drawings filed herewith. |
| M00968266 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 12/14/2023 | 03/15/2024 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR MECAHNICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| M00938830 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 10/17/2023 | 02/27/2024 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor PAR PLUMBING CO., INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR PLUMBING WORK AS PER PLANS. |
| M00985749 ↗ | 230 WEST 56 STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/16/2024 | Design CFS ENGINEERING, DPC Owner CUSHMAN & WAKEFIELD Contractor SOH PAR SPRINKLER LLC | Modification to sprinkler system as per plans filed herewith. |
| M00960217 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2023 | 12/12/2023 | Design TED MOUDIS ASSOCIATES Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | Removal and installation of non load bearing partitions as per plans filed herewith. |
| M00963457 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/04/2023 | 12/12/2023 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor PREFERRED SPKLR AND MECH | PLUMBING AND SPRINKLER FILING AS PER PLANS. |
| M00963337 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/04/2023 | 12/05/2023 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | Mechanical filing as per plans filed herewith. No change in use, egress or occupancy. |
| M00924458 ↗ | 43 WATER STREET MANHATTAN | Alteration | Signed-off | 09/15/2023 | 10/31/2023 | Design CFS ENGINEERING, DPC Owner NWSC Contractor PREFERRED MECHANICAL INC Filer METROPOLIS GROUP INC | PLUMBING APPLICATION FOR THE INSTALLATION OF A NEW ICE MAKER, PANTRY SINK, NEW NON-GAS WATER HEATER. |
| M00938833 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 10/17/2023 | — | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Filer METROPOLIS GROUP INC | — |
| M00938835 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 10/17/2023 | — | Design JAROS BAUM & BOLLES | — |
| M00893234 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/03/2023 | 10/12/2023 | Design CFS ENGINEERING, DPC Owner BROOKFIELD PROPERTIES Contractor SIRINA FIRE PROT CORP Filer JAM CONSULTANTS, INC. | COVINGTON & BURLING-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH NEW PANTRY/ & OFFICE RENOVATIONS. |
| M00893224 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/03/2023 | 10/06/2023 | Design CFS ENGINEERING, DPC Owner BROOKFIELD PROPERTIES Contractor TRISTATE PLBG SVCS CORP Filer JAM CONSULTANTS, INC. | COVINGTON & BURLING-- PLUMBING MODIFICATIONS AND INSTALLATIONS RELATED TO NEW PANTRY ON PART OF 44TH FLOOR. |
| M00859595 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/14/2023 | 09/25/2023 | Design CFS ENGINEERING, DPC Owner 1345 LEASEHOLD LLC Contractor AGGRESSIVE FIRE PROT LLC Filer RIZZO GROUP | Sprinkler Modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M00859579 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/19/2023 | 09/21/2023 | Design CFS ENGINEERING, DPC Contractor CLUNE CONSTRUCTION CO LP | Mechanical modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M00858267 ↗ | 1345 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/12/2023 | 09/15/2023 | Design TPG ARCHITECTURE, LLP Owner 1345 LEASEHOLD LLC Contractor CLUNE CONSTRUCTION CO LP Filer RIZZO GROUP | General Construction to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy. |
| M00907103 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 08/28/2023 | — | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Filer METROPOLIS GROUP INC | — |
| M00893197 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 08/03/2023 | 08/08/2023 | Design CFS ENGINEERING, DPC Owner BROOKFIELD PROPERTIES Contractor AMERICON CONSTRUCTION INC. Filer JAM CONSULTANTS, INC. | COVINGTON & BURLING-- MODIFICATIONS TO MECHANICAL EQUIPMENT ON 44TH FLOOR IN CONJUNCTION WITH RENOVATION AS PER PLANS FILED. |
| M00825907 ↗ | 250 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/24/2023 | 07/20/2023 | Design CFS ENGINEERING, DPC Owner 225 PARK AVENUE SOUTH Contractor ABCO-PEERLESS SPRKLR CORP Filer RIZZO GROUP | Remove (2) existing sprinkler head and associated piping; Relocate (16) existing sprinkler heads and associated piping on the 6th Floor as p… |
| M00647226 ↗ | 53 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 01/12/2022 | 05/25/2023 | Design CFS ENGINEERING, DPC Contractor FLYTIGER PLB & HTG LTD Filer TAILWIND CONSULTANTS LLC | Replace existing sprinkler heads. No change to use, egress, occupancy or bulk. |
| M00825867 ↗ | 250 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2023 | 05/24/2023 | Design CFS ENGINEERING, DPC Contractor NUCOR CONSTRUCTION CORP | Modifications to the existing HVAC System: Relocation and Installation of new ductwork and controls on the 6th Floor as per plans (Region's … |
| M00770750 ↗ | 866 UNITED NATIONS PLAZA MANHATTAN | Alteration | Signed-off | 09/14/2022 | 04/18/2023 | Design CFS ENGINEERING, DPC Contractor SKH MECHANICAL CORP | FILING HEREWITH MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPATION. |
| M00834572 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 03/28/2023 | 04/17/2023 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING APERTURA TENANT DUCT AND PIPING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00355861 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/20/2020 | 03/07/2023 | Design CFS ENGINEERING, DPC Owner JONES LANG LASALLE Contractor JAMES E FITZGERALD INC Filer RELATED COMPANIES | MECHANICAL WORK RELATED TO INTERIOR RENOVATION WORK ON THE 7TH AND 8TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC… |
| M00358189 ↗ | 460 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 08/20/2020 | 03/02/2023 | Design CFS ENGINEERING, DPC Owner JONES LANG LASALLE Contractor ARMON MECHANICAL INC Filer RELATED COMPANIES | STANDPIPE WORK RELATED TO INTERIOR RENOVATION WORK ON THE 7TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00825123 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 02/23/2023 | — | Design JAROS BAUM & BOLLES | — |
| M08019769 ↗ | 1 MINETTA STREET MANHATTAN | Alteration | Signed-off | 01/05/2023 | 02/07/2023 | Design CFS ENGINEERING, DPC Owner POP UP GROCER Contractor NM MECHANICAL CORP | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00644624 ↗ | 30 SUTTON PLACE MANHATTAN | Alteration | Signed-off | 01/12/2022 | 02/03/2023 | Design CFS ENGINEERING, DPC Contractor QUADRANT DEVELOPMENT Filer TAILWIND CONSULTANTS LLC | INSTALLATION OF NEW HVAC SPLIT SYSTEM IN APT 4C AND EXTENSION OF EXISTING SPLIT SYSTEM IN APT 5C. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BUL… |
| M08055281 ↗ | 1 MINETTA STREET MANHATTAN | Alteration | Permit Issued | 01/05/2023 | 01/30/2023 | Design CFS ENGINEERING, DPC Owner POP UP GROCER Contractor A&M WARSHAW SERVICES LLC | SPRINKLER WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00632110 ↗ | 450 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/14/2021 | 01/25/2023 | Design CFS ENGINEERING, DPC Contractor NUCOR CONSTRUCTION CORP | Mechanical work as shown on plans filed herewith. |
| M08019790 ↗ | 1 MINETTA STREET MANHATTAN | Alteration | Signed-off | 01/05/2023 | 01/25/2023 | Design CFS ENGINEERING, DPC Owner POP UP GROCER Contractor VCMG LLC | MINOR MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00623349 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/10/2021 | 01/17/2023 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NORTHEAST PLBG & HTG CORP Filer METROPOLIS GROUP INC | PLUMBING WORK AS PER PLANS. |
| M08023552 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/03/2022 | 01/17/2023 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor PAR PLUMBING CO., INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR TENANT PLUMBING FITOUT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08023551 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/03/2022 | 01/11/2023 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor FULL CAPACITY FIRE CORP Filer METROPOLIS GROUP INC | HEREWITH FILING FOR TENANT SPRINKLER FITOUT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08023550 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/03/2022 | 12/29/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR TENANT MECHANICAL FITOUT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08023549 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/03/2022 | 12/20/2022 | Design GENSLER Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR TENANT GENERAL CONSTRUCTION FITOUT WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08040725 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 12/20/2022 | — | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Filer METROPOLIS GROUP INC | — |
| M00733782 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 06/08/2022 | 12/17/2022 | Design GENSLER Owner 345 PAS HOLDINGS LLC Contractor L&K PARTNERS, INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR APERTURA TENANT FITOUT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08006643 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/29/2022 | 12/17/2022 | Design GENSLER Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR THE NYU TENANT FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00623342 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/12/2021 | 12/16/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor L&K PARTNERS, INC Filer METROPOLIS GROUP INC | HEREWITH FILING MECHANICAL WORK AS PER PLANS. |
| M00705320 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/06/2022 | 12/16/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor L&K PARTNERS, INC Filer METROPOLIS GROUP INC | INSTALLATION OF HVAC, RELATED PIPING, AND DUCTWORK AS PER PLANS. |
| M00705323 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/03/2022 | 12/16/2022 | Design GENSLER Owner 345 PAS HOLDINGS LLC Contractor L&K PARTNERS, INC Filer METROPOLIS GROUP INC | HEREWITH FILING THE LEXEO TENANT FITOUT WORK AS PER PLANS. |
| M00733795 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 06/08/2022 | 12/16/2022 | Design JAROS BAUM & BOLLES Contractor L&K PARTNERS, INC | HEREWITH FILING FOR MINOR MECHANICAL WORK FOR THE APERTURA TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO… |
| M08006644 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/29/2022 | 12/16/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor NEWGRANGE CONSTRUCTION CO Filer METROPOLIS GROUP INC | HEREWITH FILING FOR NYU MECHANICAL FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08006645 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 10/06/2022 | 12/13/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor METRO FIRE PROTECTION INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR NYU TENANT SPRINKLER FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08042344 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2022 | 12/07/2022 | Design CFS ENGINEERING, DPC Owner RFR REALTY, LLC Contractor MIDRE CONTRACTING CORP Filer METROPOLIS GROUP INC | INSTALL HVAC EQUIPMENT AND PIPING IN FIRST FLOOR RETAIL SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08006646 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 10/11/2022 | 11/21/2022 | Design JAROS BAUM & BOLLES Owner 345 PAS HOLDINGS LLC Contractor PAR PLUMBING CO., INC Filer METROPOLIS GROUP INC | HEREWITH FILING NYU PLUMBING FITOUT FILING. NO CHNAGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08025603 ↗ | 825 THIRD AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2022 | 11/17/2022 | Design CFS ENGINEERING, DPC Owner DURST ORGANIZATION Contractor ICON INTERIORS INC | Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. |
| M08025635 ↗ | 825 THIRD AVENUE MANHATTAN | Alteration | Signed-off | 11/14/2022 | 11/17/2022 | Design CFS ENGINEERING, DPC Owner DURST ORGANIZATION Contractor WILLIAM C. GERAKARIS P&H | Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. |
| M00787973 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 11/15/2022 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor LAB PLBG & HTG CO INC | Installation of plumbing fixtures and sprinkler heads as per plans filed herewith. No change in use egress or occupancy. |
| M08000231 ↗ | 340 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 09/19/2022 | 11/02/2022 | Design CFS ENGINEERING, DPC Contractor PRO-TONE PAINTING & CONT* | MODIFICATION OF EXISTING HVAC SYSTEM & RELATED DUTCWORK ON THE APARTMENT 17D. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UND… |
| M00787937 ↗ | 100 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 10/21/2022 | Design CFS ENGINEERING, DPC Owner SL GREEN REALTY CORP Contractor JAMES E FITZGERALD INC | MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00733813 ↗ | 351 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 06/16/2022 | 07/15/2022 | Design JAROS BAUM & BOLLES Contractor ACCURATE MECHANICAL INC | HEREWITH FILING FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR THE APERTURA TENANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY U… |
| M00646265 ↗ | 53 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 01/12/2022 | 06/29/2022 | Design CFS ENGINEERING, DPC Contractor WAI KEE CONSTRUCTION INC | Interior renovation of apartment 2, work include installation od split system. No change of egress, use, occupancy or bulk |
| M00674027 ↗ | 477 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/13/2022 | 06/21/2022 | Contractor REMI INTERIORS INC Filer METROPOLIS GROUP INC | INFILL OF EXISTING 9TH FLOOR MECHANICAL SLAB OPENINGS WITH NEW SLAB ON METAL DECK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00737658 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/15/2022 | Design CFS ENGINEERING, DPC Owner TISHMAN SPEYER Contractor 4IR IDEAL Filer RIZZO GROUP | Mechanical modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy |
| M00737662 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/14/2022 | Design CFS ENGINEERING, DPC Owner TISHMAN SPEYER Contractor ENOBRAC PLUMBING, INC Filer RIZZO GROUP | plumbing modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy |
| M00737671 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/14/2022 | Design CFS ENGINEERING, DPC Owner TISHMAN SPEYER Contractor ENOBRAC PLUMBING, INC Filer RIZZO GROUP | Sprinkler modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 03/04/2026 | Fire-Resistant Penetrations and Joints | 100 PARK AVENUE | Avinash Sharma | special |
| 03/04/2026 | Energy Code Compliance Inspections | 100 PARK AVENUE | Avinash Sharma | progress |
| 03/04/2026 | Interior lighting power | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 03/04/2026 | Lighting controls | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Post-installed Anchors | 245 PARK AVENUE | — | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | 245 PARK AVENUE | Avinash Sharma | special |
| 02/17/2026 | Energy Code Compliance Inspections | 245 PARK AVENUE | Avinash Sharma | progress |
| 02/17/2026 | Electrical motors and elevators | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Final | 245 PARK AVENUE | Avinash Sharma | progress |
| 02/17/2026 | HVAC-R and service water heating system controls | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Duct leakage testing, insulation and design | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | HVAC-R and service water piping design and insulation | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | HVAC-R and service water heating equipment | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Post-installed Anchors | 245 PARK AVENUE | Karl Rubenacker | special |
| 02/17/2026 | Mechanical Systems | 245 PARK AVENUE | Avinash Sharma | special |
| 02/17/2026 | Maintenance information | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Interior lighting power | 245 PARK AVENUE | Avinash Sharma | energy_progress |
| 02/17/2026 | Energy Code Compliance Inspections | 245 PARK AVENUE | Avinash Sharma | progress |
| 02/11/2026 | Energy Code Compliance Inspections | 64 WOOSTER STREET | Avinash Sharma | progress |
| 02/11/2026 | Sprinkler Systems | 64 WOOSTER STREET | Avinash Sharma | special |
| 02/11/2026 | Fire-Resistant Penetrations and Joints | 64 WOOSTER STREET | Avinash Sharma | special |
| 02/11/2026 | Post-installed Anchors | 64 WOOSTER STREET | Nicolas Crosetto | special |
| 12/09/2025 | Post-installed Anchors | 64 WOOSTER STREET | Nicolas Crosetto | special |
| 12/09/2025 | Sprinkler Systems | 64 WOOSTER STREET | Avinash Sharma | special |
| 12/09/2025 | Energy Code Compliance Inspections | 64 WOOSTER STREET | Avinash Sharma | progress |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | 64 WOOSTER STREET | Avinash Sharma | special |
| 10/08/2025 | Lighting controls | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 10/08/2025 | Interior lighting power | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 10/08/2025 | Energy Code Compliance Inspections | 100 PARK AVENUE | Avinash Sharma | progress |
| 10/08/2025 | Fire-Resistant Penetrations and Joints | 100 PARK AVENUE | Avinash Sharma | special |
| 10/02/2025 | Tenant Protection Plan Compliance | 790 8 AVENUE | Avinash Sharma | special |
| 10/02/2025 | Mechanical Systems | 790 8 AVENUE | Avinash Sharma | special |
| 10/02/2025 | Final | 790 8 AVENUE | Avinash Sharma | progress |
| 10/02/2025 | Energy Code Compliance Inspections | 790 8 AVENUE | Avinash Sharma | progress |
| 10/02/2025 | Electrical motors and elevators | 790 8 AVENUE | Avinash Sharma | energy_progress |
| 10/02/2025 | Maintenance information | 790 8 AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | HVAC-R and service water piping design and insulation | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | Interior lighting power | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | Maintenance information | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | HVAC-R and service water heating equipment | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | Lighting controls | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | HVAC-R and service water heating system controls | 100 PARK AVENUE | Avinash Sharma | energy_progress |
| 09/08/2025 | Energy Code Compliance Inspections | 100 PARK AVENUE | Avinash Sharma | progress |
| 09/08/2025 | Post-installed Anchors | 100 PARK AVENUE | Christopher Drutjons | special |
| 09/03/2025 | Sprinkler Systems | 100 PARK AVENUE | Avinash Sharma | special |
| 09/03/2025 | Final | 100 PARK AVENUE | Avinash Sharma | progress |
| 09/03/2025 | Mechanical Systems | 100 PARK AVENUE | Avinash Sharma | special |
| 09/02/2025 | Final | 100 PARK AVENUE | BRENT CAPRON | progress |
| 09/02/2025 | Fire-Resistant Penetrations and Joints | 100 PARK AVENUE | Avinash Sharma | special |
| 08/15/2025 | Sprinkler Systems | 245 PARK AVENUE | Avinash Sharma | special |