← Back
Primarily 5-6 family with 1 store or office
135-20 37 AVENUE
QUEENS · Flushing-Willets Point · BIN 4112286
💬 Discuss this project
1982Year Built
3Stories
S5Building Class
C4-2Zoning
4,130 sfGross Floor Area
6Units
Rent Stabilized17 Open Violations ▸
Primarily 5-6 family with 1 store or office · 2,580 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 14p · 2 filings · 18 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KIN STAR INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC404/02/2025
AMERILAND BROOK LLC105/16/2023
LONGTIN SOLUTIONS LLC308/23/2022
BASIC GROUPS CORP205/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing507/08/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402404/02/2025
AMERILAND BROOK LLC1506105/16/2023
LONGTIN SOLUTIONS LLC8320308/23/2022
NY ACOM ENGINEERING PLLC7061205/04/2021
Building Lifecycle
All (97)Filed (10)Permit Issued (8)Signed Off (3)Violation (40)Inspection (6)Special Inspection (30)
04/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
04/04/2025
Special inspection requirement — Maintenance information
BRIAN ILL
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
04/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
04/04/2025
Special inspection requirement — Interior lighting power
BRIAN ILL
04/02/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE AT 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01143509-P1
04/02/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE AT 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01143509-P2
02/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2024
Permit issued — Plumbing
Q01143509-S1-PL
11/27/2024
Permit issued — General Construction
Q01143509-I1-GC
11/17/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE AT 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01143509-S1
11/17/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE AT 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01143509-I1
11/09/2023
Signed off — Alteration
PROPOSED INSTALL NEW BOILER AND HOT WATER HEATER. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00290778-I1
07/10/2023
Signed off — Alteration
INSTALL PLUMBING FIXTURES AT 1ST FLOOR STORE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00875812-I1
06/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2023
Permit issued — Plumbing
Q00875812-I1-PL
05/16/2023
Filed — Alteration
INSTALL PLUMBING FIXTURES AT 1ST FLOOR STORE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00875812-I1
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
05/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
XIAOHONG ZHAO
11/22/2022
Signed off — Alteration
INSTALL BOILER IN CELLAR. BOILER WORK AS PER PLAN. FILED IN CONJUNCTION WITH PLUMBING JOB# Q00290778. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
Q00317544-I1
08/24/2022
Special inspection requirement — HVAC insulation and sealing
TIM TSAI
08/24/2022
Special inspection requirement — HVAC and service water heating equipment
TIM TSAI
08/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIM TSAI
08/24/2022
Special inspection requirement — HVAC and service water heating system controls
TIM TSAI
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
08/24/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
08/23/2022
Filed — Alteration
PROPOSED INSTALL NEW BOILER AND HOT WATER HEATER. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00290778-P3
08/23/2022
Special inspection requirement — HVAC insulation and sealing
TIM TSAI
08/23/2022
Special inspection requirement — HVAC and service water heating equipment
TIM TSAI
08/23/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
08/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
08/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIM TSAI
08/23/2022
Special inspection requirement — HVAC and service water heating system controls
TIM TSAI
03/03/2022
Violation issued (HPD, closed)
A
12/22/2021
Permit issued — Plumbing
Q00290778-I1-PL
05/04/2021
Filed — Alteration
PROPOSED INSTALL NEW BOILER AND HOT WATER HEATER. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00290778-P2
12/17/2020
Permit issued — Boiler Equipment
Q00317544-I1-BE
12/17/2020
Permit issued — Plumbing
Q00290778-I1-PL
08/12/2020
Filed — Alteration
PROPOSED INSTALL NEW BOILER AND HOT WATER HEATER. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00290778-P1
08/12/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
08/12/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
08/12/2020
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
08/12/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
08/12/2020
Special inspection requirement — HVAC insulation and sealing
YING JIANG
08/12/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
02/24/2020
Permit issued — Plumbing
Q00290778-I1-PL
02/18/2020
Filed — Alteration
INSTALL BOILER IN CELLAR. BOILER WORK AS PER PLAN. FILED IN CONJUNCTION WITH PLUMBING JOB# Q00290778. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
Q00317544-I1
02/18/2020
Permit issued — Boiler Equipment
Q00317544-I1-BE
02/18/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
02/18/2020
Special inspection requirement — Heating Systems
TIM TSAI
02/17/2020
Filed — Alteration
PROPOSED INSTALL NEW BOILER AND HOT WATER HEATER. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00290778-I1
10/22/2018
Violation issued (HPD, closed)
I
06/24/2016
Violation issued (HPD, open)
B
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP11/27/2024
DOB NOWGeneral ConstructionSigned-offUNIVERSAL CONSTRUCTION11/27/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG06/15/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/22/2021
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC12/17/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/17/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC02/24/2020
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC02/18/2020
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/04/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
04/04/2025Tenant Protection Plan Compliance—special
04/04/2025Energy Code Compliance InspectionsBRIAN ILLprogress
04/04/2025Maintenance informationBRIAN ILLenergy_progress
04/04/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
04/04/2025Tenant Protection Plan Compliance—special
04/04/2025Energy Code Compliance InspectionsBRIAN ILLprogress
04/04/2025Interior lighting powerBRIAN ILLenergy_progress
05/16/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
05/16/2023Tenant Protection Plan ComplianceXIAOHONG ZHAOspecial
08/24/2022HVAC insulation and sealing TIM TSAIenergy_progress
08/24/2022HVAC and service water heating equipment TIM TSAIenergy_progress
08/24/2022Fire-Resistance Rated ConstructionTIM TSAIprogress
08/24/2022HVAC and service water heating system controls TIM TSAIenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
08/24/2022Energy Code Compliance InspectionsTIM TSAIprogress
08/23/2022HVAC insulation and sealing TIM TSAIenergy_progress
08/23/2022HVAC and service water heating equipment TIM TSAIenergy_progress
08/23/2022Energy Code Compliance InspectionsTIM TSAIprogress
08/23/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
08/23/2022Fire-Resistance Rated ConstructionTIM TSAIprogress
08/23/2022HVAC and service water heating system controls TIM TSAIenergy_progress
08/12/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
08/12/2020Energy Code Compliance InspectionsYING JIANGprogress
08/12/2020Fire-Resistance Rated ConstructionYING JIANGprogress
Latest 25 of 32.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
08/24/2026Q00875812-I1Request digital key ↗
08/20/2026Q01143509-S1Request digital key ↗
08/20/2026Q01143509-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026Q00290778-I1Request digital key ↗
08/25/2026Q00290778-P3Request digital key ↗
08/15/2026Q00290778-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/28/2026Q00317544-I1Request digital key ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature21
09/15/2026Q00317544-I1Open ↗
09/15/2026Q00317544-I1Open ↗
08/28/2026Q00290778-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00290778-I1Open ↗
08/25/2026Q00290778-P1Open ↗
08/24/2026Q00875812-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/15/2026Q00317544-I1Open ↗
09/15/2026Q00317544-I1Open ↗
09/01/2026Q00875812-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan5
08/25/2026Q00290778-I1Open ↗
08/25/2026Q00290778-P2Open ↗
08/25/2026Q00290778-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q00290778-I1Open ↗
08/25/2026Q00290778-P2Open ↗
08/25/2026Q00290778-P1Open ↗
Showing 3 of 5 on file for this type